X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22309

Well Details

Well ID: 37-115-22309
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154283
Farm/Lease Name: HAYNES, W. 5
License Status:
Spud Date:
Permit Date: 2017-06-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.745156
Longitude: -75.674444

For data sources see[1][2][3]

Well History

Date Event
2017-06-14 New Permit Application
2017-09-29 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-11 2018-07-07 7,139 13,713,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0167918 22142.2
organic phosphonic salts 15827-60-8 15 0.00265133 3496.14
Other Chemical(s) Listed Above See Trade Name(s) List didecyldimethylammonium chloride 7173-51-5 8 0.000716022 944.171
organic phosphonic salts 15827-60-8 15 0.00265133 3496.14
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00109543 1444.47
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0219086 28889.4
ethonal 64-17-5 2.8 0.000251551 331.704
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00015234 200.881
Citric acid 77-92-9 30 0.000646078 851.941
Ammonium chloride 12125-02-9 1.5 0.00164314 2166.7
Water 7732-18-5 7.5 0.00194013 2558.32
formic acid 64-18-6 10 0.00007617 100.44
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000477048 629.052
Cinnamaldehyde 104-55-2 10 0.00007617 100.44
oleic acid diethanolamide 93-83-4 1.5 0.00164314 2166.7
Ethoxylated alcohol 68131-39-5 10 0.00007617 100.44
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007617 100.44
isoproyl alcohol 67-63-0 5 0.00003808 50.22
Glutaral 111-30-8 26.7 0.00239872 3163.03
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.6819 115,620,000.0
Acid Inhibitor, KAI-12 Keane Acid Inhibitor isoproyl alcohol 67-63-0 5 0.00003808 50.22
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007617 100.44
Cinnamaldehyde 104-55-2 10 0.00007617 100.44
Ethoxylated alcohol 68131-39-5 10 0.00007617 100.44
formic acid 64-18-6 10 0.00007617 100.44
Ethylene glycol 107-21-1 40 0.00030468 401.762
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00015234 200.881
Friction Reducer, KFR-16FW Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0219086 28889.4
Water 7732-18-5 60 0.0657257 86668.1
Ammonium chloride 12125-02-9 1.5 0.00164314 2166.7
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00109543 1444.47
oleic acid diethanolamide 93-83-4 1.5 0.00164314 2166.7
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.1531 16,025,500.0
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.00194013 2558.32
Hydrochloric Acid 7647-01-0 15 0.00388026 5116.65
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.00010768 141.99
Citric acid 77-92-9 30 0.000646078 851.941
Biocide, MBC-516 Keane Biocide didecyldimethylammonium chloride 7173-51-5 8 0.000716022 944.171
Water 7732-18-5 56.7 0.0050957 6719.37
ethonal 64-17-5 2.8 0.000251551 331.704
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000477048 629.052
Glutaral 111-30-8 26.7 0.00239872 3163.03

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 1,902,535.00 134 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 2,749,907.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 2.75 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 3.50 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 18.01 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 3.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.16 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Produced Fluid 23,201.39 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 7,158.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 86.26 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 1.09 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 1,185.13 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.29 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 1.05 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 5,007.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Produced Fluid 543.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2642963 Primary Facility 2017-10-03 Drilling/Alteration No Violations Noted At time of inspection.

I met with company man Ari Dabila. United Drilling was on site to drill and run conductor pipe in the 1H, 2H, 3H, 4H, 5H, 6H, 7H and 8H wells. The 1H, 2H, 3H, 4H, 5H and 7H wells were drilled to a depth of 104'. There was a rig on the 1H, 6H and 8H wells. The rig on the 6H was at a depth of 45' and will drill to 104'. The rig on the 8H was at a depth of 87' and will drill to 104'. The rig on the 1H was running conductor pipe. The conductor pipe will be set at 102' in all the wells and cemented to the surface. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2647642 Primary Facility 2017-09-27 Preoperation Inspection No Violations Noted Todays inspection was conduced as a preoperational inspection. He site has been built per plan with no red lined additions. No violations noted.
2714312 Primary Facility 2018-03-28 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as part of an investigation into a nearby water supply complaint. As photos 3 and 4 show, a drilling rig was on-site actively drilling. No E&S issues were identified. No violations were noted.
2718625 Primary Facility 2018-04-16 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Perk McDowell. Nabors X36 was on site and drilling the lateral section of the well. The proposed TD for the well is 13,835'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2736550 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company men Ron Rupert and Wayne Wilridge. Keane was on site to frac the 1H,2H,3H,4H,5H,6H,7H and 8H wells. They were on stage 23 out of 65 on the 8H when I arrived on location. The 1H and 3H haven't been started yet, there will be 32 stages on the 1H and 45 stages on the 3H. There were 15 stages completed out of 46 on the 2H. There were 25 stages completed out of 57 on the 4H. There were 15 stages completed out of 34 on the 5H. There were 24 stages completed out of 54 on the 6H. There were 20 stages completed out of 44 on the 7H. The water was being trucked to the location. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2740135 Primary Facility 2018-06-06 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. As the photo's show, hydraulic fracturing operations are still occurring at this site. Operations on the pad appeared to be impressively streamlined. No E&S issues were identified. The well connect pipeline for this pad appears to be close to completion as far as pipe installation is concerned. No violations noted.
2807313 Primary Facility 2018-11-28 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put in production. The permit numbers on the entrance sign were correct. The well tag was on the well and correct. There was water 7.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. The production fluid was going into a 500bbl tank on containment and the containment appeared to be in good condition. There were four 500bbl tanks on containment and that containment appeared to be in good condition. The rest of the 500bbl tanks on site appeared to have been clean

2832735 Primary Facility 2019-01-28 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. All wells appear to be in production. Overall the site has good stabilization. No E&S issues identified. No violations noted.

For data sources see[8]

References