X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22312

Well Details

Well ID: 37-115-22312
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154283
Farm/Lease Name: HAYNES, W. 8
License Status: Active
Spud Date:
Permit Date: 2017-06-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.745092
Longitude: -75.674356

For data sources see[1][2][3]

Well History

Date Event
2017-06-14 New Permit Application
2017-09-29 Performed Spud Operation
2018-01-28 Perforation
2018-01-28 Performed Stage 1 of Stimulation
2018-01-28 Performed Stage 2 of Stimulation
2018-01-28 Performed Stage 3 of Stimulation
2018-01-29 Perforation
2018-01-29 Performed Stage 4 of Stimulation
2018-01-29 Performed Stage 5 of Stimulation
2018-01-29 Performed Stage 6 of Stimulation
2018-01-29 Performed Stage 7 of Stimulation
2018-01-29 Performed Stage 8 of Stimulation
2018-01-29 Performed Stage 9 of Stimulation
2018-01-30 Perforation
2018-01-30 Performed Stage 10 of Stimulation
2018-01-30 Performed Stage 11 of Stimulation
2018-01-30 Performed Stage 12 of Stimulation
2018-01-30 Performed Stage 13 of Stimulation
2018-01-30 Performed Stage 14 of Stimulation
2018-01-30 Performed Stage 15 of Stimulation
2018-01-31 Perforation
2018-01-31 Performed Stage 16 of Stimulation
2018-01-31 Performed Stage 17 of Stimulation
2018-01-31 Performed Stage 18 of Stimulation
2018-01-31 Performed Stage 19 of Stimulation
2018-01-31 Performed Stage 20 of Stimulation
2018-02-01 Perforation
2018-02-01 Performed Stage 21 of Stimulation
2018-02-01 Performed Stage 22 of Stimulation
2018-02-01 Performed Stage 23 of Stimulation
2018-02-01 Performed Stage 24 of Stimulation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-18 2018-07-04 7,070 28,653,700 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Other Chemical(s) Listed Above See Trade Name(s) List Glutaral 111-30-8 26.7 0.00249117 6763.55
oleic acid diethanolamide 93-83-4 1.5 0.00179663 4877.86
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007326 198.911
Ammonium chloride 12125-02-9 1.5 0.00179663 4877.86
Water 7732-18-5 7.5 0.00185588 5038.73
organic phosphonic salts 15827-60-8 15 0.00265287 7202.57
didecyldimethylammonium chloride 7173-51-5 8 0.00074362 2018.93
Ethoxylated alcohol 68131-39-5 10 0.00007326 198.911
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.023955 65038.1
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000495435 1345.11
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000146527 397.823
Cinnamaldehyde 104-55-2 10 0.00007326 198.911
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00119775 3251.91
ethonal 64-17-5 2.8 0.000261247 709.287
Citric acid 77-92-9 30 0.000616864 1674.79
formic acid 64-18-6 10 0.00007326 198.911
isoproyl alcohol 67-63-0 5 0.00003663 99.456
Friction Reducer, KFR-16FW Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 20 0.023955 65038.1
Ammonium chloride 12125-02-9 1.5 0.00179663 4877.86
oleic acid diethanolamide 93-83-4 1.5 0.00179663 4877.86
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00119775 3251.91
Water 7732-18-5 60 0.0718651 195114
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0168015 45616.3
organic phosphonic salts 15827-60-8 15 0.00265287 7202.57
Biocide, MBC-516 Keane Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000495435 1345.11
didecyldimethylammonium chloride 7173-51-5 8 0.00074362 2018.93
Glutaral 111-30-8 26.7 0.00249117 6763.55
Water 7732-18-5 56.7 0.00529211 14368.1
ethonal 64-17-5 2.8 0.000261247 709.287
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.1206 30,192,600.0
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 88.7051 240,835,000.0
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.00371176 10077.5
Water 7732-18-5 7.5 0.00185588 5038.73
Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 30 0.000616864 1674.79
Acetic acid 64-19-7 5 0.000102811 279.132
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Ethoxylated alcohol 68131-39-5 10 0.00007326 198.911
Cinnamaldehyde 104-55-2 10 0.00007326 198.911
Ethylene glycol 107-21-1 40 0.000293055 795.646
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000146527 397.823
isoproyl alcohol 67-63-0 5 0.00003663 99.456
formic acid 64-18-6 10 0.00007326 198.911
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007326 198.911

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2018-01-28 1 White Sand 6,578,537 8,320 8,995
2018-01-28 2 White Sand 6,578,537 8,471 5,601
2018-01-28 3 White Sand 6,578,537 8,431 6,272
2018-01-29 4 White Sand 6,578,537 8,415 5,380
2018-01-29 5 White Sand 6,578,537 8,157 5,926
2018-01-29 6 White Sand 6,578,537 7,954 6,179
2018-01-29 7 White Sand 6,578,537 7,821 5,972
2018-01-29 8 White Sand 6,578,537 7,912 6,574
2018-01-29 9 White Sand 6,578,537 7,950 6,675
2018-01-30 10 White Sand 6,578,537 7,933 6,554
2018-01-30 11 White Sand 6,578,537 8,124 5,911
2018-01-30 12 White Sand 6,578,537 8,004 5,895
2018-01-30 13 White Sand 6,578,537 8,101 6,727
2018-01-30 14 White Sand 6,578,537 7,928 6,203
2018-01-30 15 White Sand 6,578,537 8,119 6,008
2018-01-31 16 White Sand 6,578,537 7,478 5,837
2018-01-31 17 White Sand 6,578,537 7,483 5,677
2018-01-31 18 White Sand 6,578,537 7,702 6,138
2018-01-31 19 White Sand 6,578,537 7,501 6,180
2018-01-31 20 White Sand 6,578,537 7,372 5,911
2018-02-01 21 White Sand 6,578,537 7,326 6,216
2018-02-01 22 White Sand 6,578,537 7,310 5,660
2018-02-01 23 White Sand 6,578,537 7,041 6,351
2018-02-01 24 White Sand 6,578,537 7,068 6,250

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 5,090,019.00 134 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 7,419,814.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 2.75 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 3.50 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 18.01 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 4.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.33 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Produced Fluid 46,265.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 9,996.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 110.98 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 1.09 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 2,073.81 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.29 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 1.35 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 6,112.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Produced Fluid 576.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2642960 Primary Facility 2017-10-03 Drilling/Alteration No Violations Noted At time of inspection.

I met with company man Ari Dabila. United Drilling was on site to drill and run conductor pipe in the 1H, 2H, 3H, 4H, 5H, 6H, 7H and 8H wells. The 1H, 2H, 3H, 4H, 5H and 7H wells were drilled to a depth of 104'. There was a rig on the 1H, 6H and 8H wells. The rig on the 6H was at a depth of 45' and will drill to 104'. The rig on the 8H was at a depth of 87' and will drill to 104'. The rig on the 1H was running conductor pipe. The conductor pipe will be set at 102' in all the wells and cemented to the surface. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2647682 Primary Facility 2017-09-27 Preoperation Inspection No Violations Noted Todays inspection was conduced as a preoperational inspection. He site has been built per plan with no red lined additions. No violations noted.
2696296 Primary Facility 2018-02-21 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Tony Ketterling. Nabors X36 was on site and drilling the lateral section of the well. The proposed TD for the well is 20,452'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2714323 Primary Facility 2018-03-28 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as part of an investigation into a nearby water supply complaint. As photos 3 and 4 show, a drilling rig was on-site actively drilling. No E&S issues were identified. No violations were noted.
2736556 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company men Ron Rupert and Wayne Wilridge. Keane was on site to frac the 1H,2H,3H,4H,5H,6H,7H and 8H wells. They were on stage 23 out of 65 on the 8H when I arrived on location. The 1H and 3H haven't been started yet, there will be 32 stages on the 1H and 45 stages on the 3H. There were 15 stages completed out of 46 on the 2H. There were 25 stages completed out of 57 on the 4H. There were 15 stages completed out of 34 on the 5H. There were 24 stages completed out of 54 on the 6H. There were 20 stages completed out of 44 on the 7H. The water was being trucked to the location. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2740139 Primary Facility 2018-06-06 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. As the photo's show, hydraulic fracturing operations are still occurring at this site. Operations on the pad appeared to be impressively streamlined. No E&S issues were identified. The well connect pipeline for this pad appears to be close to completion as far as pipe installation is concerned. No violations noted.
2807297 Primary Facility 2018-11-28 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put in production. The permit numbers on the entrance sign were correct. The well tag was on the well and correct. There was water 7.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. The production fluid was going into a 500bbl tank on containment and the containment appeared to be in good condition. There were four 500bbl tanks on containment and that containment appeared to be in good condition. The rest of the 500bbl tanks on site appeared to have been clean

2832761 Primary Facility 2019-01-28 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. All wells appear to be in production. Overall the site has good stabilization. No E&S issues identified. No violations noted.

For data sources see[9]

References