X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22416

Well Details

Well ID: 37-115-22416
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 146094
Farm/Lease Name: EMPET D 007
License Status:
Spud Date:
Permit Date: 2018-01-03
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.739406
Longitude: -75.710392

For data sources see[1][2][3]

Well History

Date Event
2018-01-03 New Permit Application
2018-11-06 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 1,726,377.00 150 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 4.45 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 373.63 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Drill Cuttings 1,058.20 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 3,181.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Soil Contaminated by Oil 0.01 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 41.50 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 5,473.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 27.55 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 2.62 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 2.87 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.03 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Soil Contaminated by Oil & Gas Related Spills 0.01 Tons RESIDUAL WASTE PROCESSING FACILITY 301333

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2804207 Primary Facility 2018-11-16 Drilling/Alteration No Violations Noted At time of inspection.

On site for a new spud inspection. HAD Drilling Contractors was on site to drill and run the conductor pipe in the 3H, 5H, 6H, 7H, 10H and 12H wells. I met with HAD driller Jeremy Parker. The 6H, 10H and 12H were completed with 115' of 24" pipe and 175' of 20" pipe. They were rigged up on the 7H and was at a depth of 148'. The 3H and 5H haven't been started yet but Jeremy said all the wells will be at the same depth. There are four existing wells on site, the 1H, 2H, 4H and 8H that are temporarily plugged. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2817797 Primary Facility 2018-12-20 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Shane Brown. PD 181 is on site to drill the top hole section of the wells to the depth of the intermediate casing. There are four existing wells on site that are temporarily plugged and six new wells to be drilled. They were curently drilling the hole for the intermediate casing on the 5H with WBM. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2831503 Primary Facility 2019-01-16 Incident- Response to Accident or Event No Violations Noted I arrived at the site at 9:43 in response to a report of staining discovered on the pad surface as Cabot was in the process of removing the secondary containment liner user for drilling operations. I was accompanied by Gene Rickard, DEP O&G WQS out of the Scranton District Office. The weather conditions are cloudy skies, cold, with light winds, and temperatures in the 30's. Cabot was in the process of rigging down the site. Precision Drilling Rig # 181 has recently demobilized from the site. Cabot submitting Drilling resumption After Break of 30 days or more notifications to the Department for the Empet 3H, 5H, 6H, 7H, 10H and 12H wells. The notifications were submitted on 12/4/18, 12/13/18, 12/14/18, and 12/15/18. The 1H, 2H, 4H, and 8H are the existing wells on the pad, but are currently shut in. The production equipment for these wells has been moved to the tank pad section of the site. We met with Eric Peterson, Drilling Environmental Health and Safety Consultant of Cabot Oil and Gas. Cabot was in
2847242 Primary Facility 2019-02-26 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted.

For data sources see[7]

References