37-115-22494

Well Details

Well ID: 37-115-22494
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 147696
Farm/Lease Name: ADAMS J 005
License Status:
Spud Date: 2018-07-03
Permit Date: 2018-03-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.771458
Longitude: -75.700050

For data sources see[1][2][3]

Well History

Date Event
Deviated
2018-03-22 New Permit Application
2018-07-02 Performed Spud Operation
2018-11-14 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-12-21 2019-02-06 7,420 16,959,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 15.0511 25,202,100.0
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.0215551 36092.8
Hydrochloric Acid 7647-01-0 15 0.0431102 72185.5
Other Chemical(s) Listed Above See Trade Name(s) List Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00009409 157.554
Ethoxylated alcohol 68131-39-5 10 0.00009409 157.554
Water 7732-18-5 7.5 0.0215551 36092.8
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000460151 770.496
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000188187 315.107
ethanal 64-17-5 2.8 0.000242641 406.288
organic phosphonic salts 15827-60-8 15 0.00249312 4174.59
isoproyl alcohol 67-63-0 5 0.00004705 78.777
Cinnamaldehyde 104-55-2 10 0.00009409 157.554
didecyldimethylammonium chloride 7173-51-5 8 0.00069066 1156.47
oleic acid diethanolamide 93-83-4 1.5 0.00169729 2842.01
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00113153 1894.68
Ammonium Chloride 12125-02-9 1.5 0.00169729 2842.01
Citric acid 77-92-9 30 0.000794211 1329.86
Glutaral 111-30-8 26.7 0.00231375 3874.25
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0226305 37893.5
formic acid 64-18-6 10 0.00009409 157.554
Methanol 67-56-1 20 0.00332416 5566.11
Friction Reducer, KFR-16FW Keane Friction Reducer Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0226305 37893.5
Water 7732-18-5 60 0.0678916 113681
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00113153 1894.68
Ammonium Chloride 12125-02-9 1.5 0.00169729 2842.01
oleic acid diethanolamide 93-83-4 1.5 0.00169729 2842.01
Scale Inhibitor, KSI-19 Keane Scale Inhibitor Water 7732-18-5 65 0.0108035 18089.9
organic phosphonic salts 15827-60-8 15 0.00249312 4174.59
Methanol 67-56-1 20 0.00332416 5566.11
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000132369 221.643
Citric acid 77-92-9 30 0.000794211 1329.86
Acid Inhibitor, KAI-12 Keane Acid Inhibitor dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000188187 315.107
Ethoxylated alcohol 68131-39-5 10 0.00009409 157.554
isoproyl alcohol 67-63-0 5 0.00004705 78.777
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00009409 157.554
Ethylene glycol 107-21-1 40 0.000376373 630.214
formic acid 64-18-6 10 0.00009409 157.554
Cinnamaldehyde 104-55-2 10 0.00009409 157.554
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 84.5195 141,523,000.0
Biocide, MBC-516 Keane Biocide Water 7732-18-5 56.7 0.00491521 8230.23
didecyldimethylammonium chloride 7173-51-5 8 0.00069066 1156.47
Glutaral 111-30-8 26.7 0.00231375 3874.25
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000460151 770.496
ethanal 64-17-5 2.8 0.000242641 406.288

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 5,654,824.00 298 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 12.13 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 58.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Drill Cuttings 1,677.57 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 90.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 93.04 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 22.46 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 14,700.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 2.83 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 7,439.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.12 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.06 Tons RESIDUAL WASTE TRANSFER FACILITY 101714

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2748424 Primary Facility 2018-07-03 Drilling/Alteration No Violations Noted At time of inspection.

On site for a new spud inspection. Met with company man David Dewberry. United Drilling was on site to drill and run the conductor pipe for the 1H, 2H,3H, 5H, 7H, 8H and 10H wells. There was one auger rig and two air rigs running when I arrived on site. There was an air rig on the 1H at a depth of 7.5'. The 2H was drilled to a depth of 105' and the auger rig was going in to clean out to bottom and run the conductor pipe. The 3H was completed and the conductor pipe was in the hole at a depth of 105'. The 5H was at a depth of 8'. The 7H was at a depth of 6.5'. The second air rig was rigging up on the 8H which was at a depth of 8.5'. The 10H was drilled to a depth of 105'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2750995 Primary Facility 2018-07-09 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as part of an investigation into a nearby water supply complaint in which the water well was impacted by a heavy sediment load on 7/3/18. As Photo #2 shows, new wells have recently been spud on this pad. A review of the most recent Department Drilling Inspection, Inspection Record No. 2748434 found that conductor pipe was installed on 7/3/18 for 7 wells, the 1H, 2H, 3H, 5H, 7H, 8H, and the 10H. The conductors were all drilled to a depth of approximately 105'. During the 7/3/18 inspection, the inspector noted that 3 Rigs were being operated, one auger rig and two air rigs. No E&S issues were identified. No violations noted.
2762571 Primary Facility 2018-08-10 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man William Smith. PD 181 was on site to drill and set the surface and intermediate casings. There are two existing wells on site that are temporarily plugged and there are seven new wells on site to be drilled. They completed the fourth of the seven wells. They cemented the intermediate casing and bumped the plug at 11:04am. They were rigging down when I arrived on site and will move to the 1H. I took a walk around the location and noticed two holes in the containment on the berm just above the water line. Bill made a call to New Park and a crew was on there way to repair the containment. There were no violations noted.

2802067 Primary Facility 2018-11-13 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Tony Ketterling. Nabors X36 was on site to finish drilling the well. The top hole section of the well to the depth of the intermediate casing was drilled and completed by PD 181 on 8/11/18. There are two existing wells on site that are temporarily plugged and there are seven new wells on site to be drilled. They are on the fourth of the seven wells. They are drilling the lateral section of the well and drilling with DOBM. The proposed TD for the well is 18,357'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2830131 Primary Facility 2019-01-22 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company man Andy Rodriguez. Keane was on site to frac the 1H, 2H, 3H, 5H, 7H, 8H and 10H wells. They were stimulating stage 10 out of 50 stages on the 10H and running a plug and perf in the 2H when I arrived on site. The 1H was completed with 51 stages. There were 20 stages completed out of 58 on the 2H. There were 49 stages completed out of 50 on the 3H. There were 49 stages completed out of 51 on the 5H. There were 21 stages completed out of 23 on the 7H. The 8H wasn't started but will have 30 stages. The water was being trucked to the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2850449 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Present during the inspection was Cabot Site Supervisor Steve Gillman. Stimulation activities have been completed and site is currently being demobilized. Production equipment installation is also occurring. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted.