If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-00011 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.872112,"lon":-77.514316,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Clymer Township | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: N Y S N G CORP (N-296-S) 2 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 1995-03-28 | |
Well Type: STORAGE WELL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.872112 | |
Longitude: -77.514316 |
Date | Event |
---|---|
1953-03-23 | Drilling Completion |
1970-10-22 | OLD WELL |
1995-03-28 | New Permit Application |
1995-05-07 | Drilling Completion |
1995-07-27 | Perforation |
1996-12-05 | REWORKED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2003 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1070788 | Primary Facility | 2001-10-25 | Routine/Complete Inspection | No Violations Noted | |
1180280 | Primary Facility | 2002-10-28 | Routine/Complete Inspection | No Violations Noted | |
1278375 | Primary Facility | 2003-10-09 | Routine/Complete Inspection | No Violations Noted | |
1495645 | Primary Facility | 2005-11-14 | Routine/Complete Inspection | No Violations Noted | |
1584482 | Primary Facility | 2006-12-05 | Routine/Complete Inspection | No Violations Noted | |
1669483 | Primary Facility | 2007-11-27 | Routine/Complete Inspection | No Violations Noted | |
1752247 | Primary Facility | 2008-11-17 | Routine/Complete Inspection | No Violations Noted | |
1842133 | Primary Facility | 2009-11-04 | Routine/Complete Inspection | No Violations Noted | |
1920976 | Primary Facility | 2010-10-19 | Routine/Complete Inspection | No Violations Noted | |
2025956 | Primary Facility | 2011-11-17 | Routine/Complete Inspection | No Violations Noted | |
2120960 | Primary Facility | 2012-11-13 | Routine/Complete Inspection | No Violations Noted | |
2213313 | Primary Facility | 2013-10-08 | Routine/Complete Inspection | No Violations Noted | |
2312809 | Primary Facility | 2014-10-07 | Routine/Complete Inspection | No Violations Noted | |
2411590 | Primary Facility | 2015-09-28 | Routine/Complete Inspection | No Violations Noted | |
2529055 | Primary Facility | 2016-10-18 | Routine/Complete Inspection | No Violations Noted | |
2641614 | Primary Facility | 2017-09-25 | Routine/Complete Inspection | No Violations Noted | |
2777913 | Primary Facility | 2018-09-19 | Routine/Complete Inspection | No Violations Noted | Date: 9/18-19/2018
CASING PSI: 1.716 MAX ALLOWABLE PSI: 2,160 VENT: 1. 0 scf/day 2. 0 scf/day 3. 0 scf/day
VENT: 1. ¿ H2O on ¿ plate 2. ¿ H2O on ¿ plate 3. ¿ H2O on ¿ plate
COMMENTS: New paint 2018
|
682378 | Primary Facility | 1988-10-18 | Routine/Complete Inspection | No Violations Noted | |
682379 | Primary Facility | 1989-09-28 | Routine/Complete Inspection | No Violations Noted | |
683047 | Primary Facility | 1990-10-25 | Routine/Complete Inspection | No Violations Noted | |
684037 | Primary Facility | 1991-10-16 | Routine/Complete Inspection | No Violations Noted | |
684470 | Primary Facility | 1992-10-14 | Routine/Complete Inspection | No Violations Noted | |
685303 | Primary Facility | 1993-10-25 | Routine/Complete Inspection | No Violations Noted | |
686036 | Primary Facility | 1994-10-26 | Routine/Complete Inspection | No Violations Noted | |
686310 | Primary Facility | 1994-12-07 | Routine/Complete Inspection | No Violations Noted | |
686319 | Primary Facility | 1994-12-13 | Routine/Complete Inspection | No Violations Noted | |
686323 | Primary Facility | 1994-12-29 | Routine/Complete Inspection | No Violations Noted | |
686333 | Primary Facility | 1995-01-04 | Routine/Complete Inspection | No Violations Noted | |
686334 | Primary Facility | 1995-01-20 | Routine/Complete Inspection | No Violations Noted | |
686352 | Primary Facility | 1995-02-22 | Routine/Complete Inspection | No Violations Noted | |
686363 | Primary Facility | 1995-02-09 | Routine/Complete Inspection | No Violations Noted | |
686383 | Primary Facility | 1995-03-13 | Routine/Complete Inspection | No Violations Noted | |
686386 | Primary Facility | 1995-03-06 | Routine/Complete Inspection | No Violations Noted | |
686414 | Primary Facility | 1995-04-11 | Routine/Complete Inspection | No Violations Noted | |
686443 | Primary Facility | 1995-04-26 | Drilling/Alteration | No Violations Noted | |
686444 | Primary Facility | 1995-04-27 | Drilling/Alteration | No Violations Noted | |
686446 | Primary Facility | 1995-04-20 | Drilling/Alteration | No Violations Noted | |
686447 | Primary Facility | 1995-04-24 | Drilling/Alteration | No Violations Noted | |
686459 | Primary Facility | 1995-05-02 | Drilling/Alteration | No Violations Noted | |
686460 | Primary Facility | 1995-05-05 | Drilling/Alteration | No Violations Noted | |
686464 | Primary Facility | 1995-05-01 | Drilling/Alteration | No Violations Noted | |
686465 | Primary Facility | 1995-05-11 | Routine/Complete Inspection | No Violations Noted | |
686472 | Primary Facility | 1995-05-22 | Routine/Complete Inspection | Violation(s) Noted | |
686476 | Primary Facility | 1995-05-24 | Routine/Complete Inspection | No Violations Noted | |
686479 | Primary Facility | 1995-05-15 | Routine/Complete Inspection | Violation(s) Noted | |
686491 | Primary Facility | 1995-05-30 | Routine/Complete Inspection | No Violations Noted | |
686680 | Primary Facility | 1995-08-10 | Routine/Complete Inspection | No Violations Noted | |
686961 | Primary Facility | 1995-10-31 | Routine/Complete Inspection | No Violations Noted | |
687092 | Primary Facility | 1995-12-18 | Routine/Complete Inspection | No Violations Noted | |
687093 | Primary Facility | 1995-12-18 | Routine/Complete Inspection | No Violations Noted | |
687100 | Primary Facility | 1995-12-06 | Routine/Complete Inspection | No Violations Noted | |
687105 | Primary Facility | 1996-01-08 | Routine/Complete Inspection | No Violations Noted | |
687120 | Primary Facility | 1996-01-22 | Routine/Complete Inspection | No Violations Noted | |
687330 | Primary Facility | 1996-05-15 | Routine/Complete Inspection | No Violations Noted | |
687707 | Primary Facility | 1996-10-22 | Routine/Complete Inspection | No Violations Noted | |
688544 | Primary Facility | 1997-10-29 | Routine/Complete Inspection | No Violations Noted | |
689269 | Primary Facility | 1998-10-15 | Routine/Complete Inspection | No Violations Noted | |
883981 | Primary Facility | 1999-10-13 | Routine/Complete Inspection | No Violations Noted | |
973328 | Primary Facility | 2000-10-11 | Routine/Complete Inspection | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
686472 | 104524 | 05/22/1995 | 1995-05-22 | 78.61.2.3 - Improper residual waste or drill cutting disposal | Environmental Health & Safety | |
686479 | 104542 | 05/15/1995 | 1995-05-15 | 78.61.2.3 - Improper residual waste or drill cutting disposal | Environmental Health & Safety |
For data sources see[6]