If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-20181 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.6901,"lon":-77.57495,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Gaines Township | |
Operator Name: TILDEN MARCELLUS LLC | |
Well Pad ID: | |
Farm/Lease Name: MARSHLANDS UNIT 2 | |
License Status: INACTIVE | |
Spud Date: | |
Permit Date: 2006-07-19 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.6901 | |
Longitude: -77.574950 |
Date | Event |
---|---|
2006-07-19 | New Permit Application |
2006-11-02 | Performed Spud Operation |
2007-02-15 | Drilling Completion |
2007-06-04 | Perforation |
2008-01-14 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2007 | ULTRA RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | ULTRA RESOURCES INC | 19659.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2009 | ULTRA RESOURCES INC | 4874.00 | 156 | 0.00 | 0 | 0.00 | 0 |
2010 | ULTRA RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | ULTRA RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | ULTRA RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | ULTRA RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | ULTRA RESOURCES INC | Brine | 791.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2009 | ULTRA RESOURCES INC | Brine | 400.00 Bbl | Brine or Industrial Waste Treatment Plt |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1553286 | Primary Facility | 2006-07-27 | Routine/Complete Inspection | No Violations Noted | |
1557374 | Primary Facility | 2006-08-08 | Routine/Complete Inspection | No Violations Noted | |
1557376 | Primary Facility | 2006-08-02 | Routine/Complete Inspection | No Violations Noted | |
1558604 | Primary Facility | 2006-08-18 | Routine/Complete Inspection | No Violations Noted | |
1573690 | Primary Facility | 2006-10-04 | Routine/Complete Inspection | No Violations Noted | |
1578493 | Primary Facility | 2006-11-06 | Routine/Complete Inspection | No Violations Noted | |
1581078 | Primary Facility | 2006-11-14 | Drilling/Alteration | No Violations Noted | |
1581131 | Primary Facility | 2006-11-14 | Drilling/Alteration | No Violations Noted | |
1582575 | Primary Facility | 2006-11-29 | Drilling/Alteration | No Violations Noted | |
1583932 | Primary Facility | 2006-12-05 | Drilling/Alteration | No Violations Noted | |
1594791 | Primary Facility | 2007-01-23 | Drilling/Alteration | No Violations Noted | |
1598394 | Primary Facility | 2007-02-06 | Drilling/Alteration | No Violations Noted | |
1601212 | Primary Facility | 2007-02-20 | Drilling/Alteration | No Violations Noted | |
1601313 | Primary Facility | 2007-02-16 | Drilling/Alteration | No Violations Noted | |
1629020 | Primary Facility | 2007-05-16 | Drilling/Alteration | No Violations Noted | |
1885990 | Primary Facility | 2010-05-21 | Routine/Complete Inspection | No Violations Noted | RTNC inspection to meet about resolidificationi of the drill cuttings pit. |
1963995 | Primary Facility | 2011-04-06 | Routine/Complete Inspection | No Violations Noted | |
2041137 | Primary Facility | 2012-01-24 | Routine/Complete Inspection | No Violations Noted | |
2212170 | Primary Facility | 2013-10-10 | Routine/Partial Inspection | No Violations Noted | On October 10, 2013 an inspection was conducted at the T. Pierson 801 pad in Gaines Township, Tioga County. The last inspection conducted on behalf of the operator was on 10/9/13. The Marshlands Unit 2 well, 2H and 5H wells are drilled; the 1H well permit is active, but the well hasn't been drilled, and the 4H, 6H, 3H, 4H and 6H wells have been reported by the operator as not drilled. The site is stabilized and well vegetated. Several puddles were screened and no exhibited elevated conductance. No issues were noted and no violations were cited during this inspection. |
2385753 | Primary Facility | 2015-07-06 | Routine/Complete Inspection | No Violations Noted | |
2467113 | Primary Facility | 2016-03-22 | Incident- Response to Accident or Event | Pending | The Department of Environmental Protection (DEP) inspected the SWEPI – Pierson 801 site (ESG10-117-0009), located in Gaines Twp., Tioga Co., after receiving notification from SWEPI that fluid with elevated conductivity and a strong diesel odor was encountered while excavating around the Marshlands Unit 2 well head. Present onsite for the inspection were myself; Terra Tokarz, DEP WQS; Pat Bernethy, Env. Coordinator Shell; Kelvin Flynn, Wellhead Integrity Specialist Shell; Mike Eldrige, OSR Projects Shell; Matt Caldwell, Geologic Technician II Moody and Associates, Inc. The DEP collected samples from the fluid around the well head with a long handled sampling device. The field conductivity was not measured due to safety concerns regarding the pit qualifying as a confined space. Samples were also collected from the excavated pit at the toe of the fill slope. The field conductivity of the fluid in the fill-slope-pit measured 1.36 mS/cm. A violation of 25 Pa Code §78.54 is PENDING at this time, against API#117 |
2470105 | Primary Facility | 2016-03-30 | Follow-up Inspection | No Violations Noted | |
2481570 | Primary Facility | 2016-05-04 | Follow-up Inspection | Pending | The Department of Environmental Protection (DEP) inspected the SWEPI LP – Pierson 801 (ESG10-117-0009) site in Gaines Twp., Tioga Co. on 5/4/2016 @ 1130 hours, as follow-up to the INCDT inspection conducted 3/22/2016. As noted in inspection record# 2467112, on 3/22/2016, SWEPI had notified the Department they encountered liquid with an elevated conductivity and a strong diesel odor while excavating around the Marshland Unit 2 (MU2) well head to fix a leaking annulus vent. As of today’s inspection, the excavated area around the MU2 well head has been backfilled and re-graded. The roll-off container was still onsite. The pad surface appeared very wet, with numerous puddles. The puddles were screened for field conductivity using an Oakton PCSTestr 35. Most of the puddles screened for field conductivity measured 475-800 µS/cm. Standing water was observed in the secondary containment surrounding the produced water tanks. The field conductivity was measured at 1180 µS/cm. A medium sized puddle adjacent to the seco |
2501776 | Primary Facility | 2016-07-18 | Administrative/File Review | No Violations Noted | An administrative inspection report was generated for the Pierson 801 well pad (ESG10-117-0009) located in Gaines Twp., Tioga Co on 7/18/2016. Sample 4427-106 collected ftom the excavated pit at the toe of the fill slope shows elevated levels of iron (25.5 mg/L), manganese (28.5 mg/L) and a pH of 5.6. Violations are considered resolved, and the status is changed from “PENDING” to “NOVIO”.
This inspection report references the following well permits - Marshlands Unit 2 117-20181 Permitted 7/19/2006 SPUD 11/2/2006 RIS T Pierson 801 2H 117-20309 Permitted 6/12/2009 SPUD 7/20/2009 Active T Pierson 801 5H 117-20311 Permitted 6/12/2009 SPUD 7/7/2009 Active |
2520381 | Primary Facility | 2016-09-14 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection (DEP) inspected the SWEPI LP – Pierson 801 (ESG10-117-0009) site in Gaines Twp., Tioga Co. on 9/14/2016 @ 1230 hours. The weather was 75 degrees and partly sunny. The onsite inspection log stated the site was last inspected by company personnel on 8/30/2016 with “no visible issues” recorded in the comments section. The inspection on 8/22/2016 noted “veg @ 75% in reclaimed areas”.
As of today’s inspection, no standing water was observed on the pad surface or in secondary containment. Disturbed areas appear to be stabilized with vegetation. All E&S controls appear to be functioning properly. No violations are noted at this time. I departed the site @ 1300 hours. This inspection report references the following well permits - Marshlands Unit 2 117-20181 Permitted 7/19/2006 SPUD 11/2/2006 RIS T Pierson 801 2H 117-20309 Permitted 6/12/2009 SPUD 7/20/2009 Active T Pierson 801 5H 117-20311 Permitted 6/12/2009 SPUD 7/7/20 |
2536512 | Primary Facility | 2016-11-08 | Site Restoration | No Violations Noted | The Department of Environmental Protection (DEP) inspected the SWEPI LP – Pierson 801 (ESG10-117-0009) site in Gaines Twp., Tioga Co. on 11/8/2016 @ 1300 hours, in response to receipt of a Notice of Termination received by the DEP on 10/1/2016. The onsite inspection log stated the site was last inspected by company personnel on 10/31/2016 with “no visible issues, construction on the pad” recorded in the comments section. The inspection on 10/18/2016 noted “reclaim nearly 100% regrowth”.
As of today’s inspection, standing water was observed on the pad surface with a field measured conductivity between 480-600 µS/cm. Standing water inside the production tank containment had a field measured conductivity of 1980 µS/cm. The newly installed infiltration berm below the SW fill slope appears to be stabilized by at least 70% vegetative cover. All cut and fill slopes appear adequately vegetated and stabilized. No temporary E&S controls were observed during the inspection. This inspection meets the requirements of 2 |
2856167 | Primary Facility | 2019-03-19 | Routine/Complete Inspection | No Violations Noted | And inspection was conducted today at the Pierson 801 well pad. The weather was 40° with partly cloudy skies. This site has been restored and no issues were noted |
For data sources see[7]