If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-117-20196 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.877594,"lon":-77.512492,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Tioga | |
| Municipality: Clymer Township | |
| Operator Name: | |
| Well Pad ID: | |
| Farm/Lease Name: ANNA KERNAN N2017S | |
| License Status: INACTIVE | |
| Spud Date: | |
| Permit Date: 2008-02-08 | |
| Well Type: STORAGE WELL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: Yes | |
| Latitude: 41.877594 | |
| Longitude: -77.512492 |
| Date | Event |
|---|---|
| 2008-02-08 | New Permit Application |
| 2008-05-08 | Performed Spud Operation |
| 2008-08-11 | Drilling Completion |
| 2008-09-18 | Perforation |
| 2009-09-14 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2008 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2009 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2010 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2011 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2012 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2013 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2014 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2015 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2016 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2017 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2018 | DOMINION ENERGY TRANS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1705932 | Primary Facility | 2008-05-13 | Drilling/Alteration | No Violations Noted | |
| 1724977 | Primary Facility | 2008-07-28 | Drilling/Alteration | No Violations Noted | |
| 1742413 | Primary Facility | 2008-10-14 | Routine/Complete Inspection | Violation(s) Noted | |
| 1750636 | Primary Facility | 2008-11-18 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
| 1821091 | Primary Facility | 2009-08-18 | Compliance Evaluation | No Violations Noted | This site is completely restored and there is >70% vegetative cover on the former disturbed areas. All appears to be in order. I recommend resolving the violations previously entered under inspection # 1750636. |
| 1842125 | Primary Facility | 2009-11-04 | Routine/Complete Inspection | No Violations Noted | |
| 1920980 | Primary Facility | 2010-10-19 | Routine/Complete Inspection | No Violations Noted | |
| 2025969 | Primary Facility | 2011-11-17 | Routine/Complete Inspection | No Violations Noted | |
| 2120970 | Primary Facility | 2012-11-13 | Routine/Complete Inspection | No Violations Noted | |
| 2213317 | Primary Facility | 2013-10-08 | Routine/Complete Inspection | No Violations Noted | |
| 2312812 | Primary Facility | 2014-10-07 | Routine/Complete Inspection | No Violations Noted | |
| 2411598 | Primary Facility | 2015-09-28 | Routine/Complete Inspection | No Violations Noted | |
| 2529060 | Primary Facility | 2016-10-18 | Routine/Complete Inspection | No Violations Noted | |
| 2641624 | Primary Facility | 2017-09-25 | Routine/Complete Inspection | No Violations Noted | |
| 2778115 | Primary Facility | 2018-09-19 | Routine/Complete Inspection | No Violations Noted | Date: 9/18-19/2018
CASING PSI: 1.719 MAX ALLOWABLE PSI: 2,160 VENT: 1. 0 scf/day 2. 0 scf/day 3. 0 scf/day
VENT: 1. ¿ H2O on ¿ plate 2. ¿ H2O on ¿ plate 3. ¿ H2O on ¿ plate
COMMENTS: New paint 2018
|
| Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
|---|---|---|---|---|---|---|
| 1742413 | 549376 | 10/14/2008 | 2008-10-14 | 102.4INADPLN - E&S Plan not adequate | Administrative | |
| 1742413 | 549377 | 10/14/2008 | 2008-10-14 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety |
| Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
|---|---|---|---|---|---|---|---|
| 549376 | 239351 | NOV - Notice of Violation | Administrative Close Out | 2011-01-27 | |||
| 549377 | 239351 | NOV - Notice of Violation | Administrative Close Out | 2011-01-27 |
For data sources see[6]