If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-20334 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.808292,"lon":-76.933453,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Sullivan Township | |
Operator Name: SWEPI LP | |
Well Pad ID: 147948 | |
Farm/Lease Name: CHAPMAN 237 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-07-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.808292 | |
Longitude: -76.933453 |
Date | Event |
---|---|
2009-07-16 | New Permit Application |
2009-11-29 | Performed Spud Operation |
2010-04-01 | Drilling Completion |
2010-05-09 | Perforation |
2010-08-16 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | EAST RESOURCES MGMT LLC | 189,320.00 | 200 | 0.00 | 0 | 0.00 | 0 |
2011 | SWEPI LP | 165,416.52 | 262 | 0.00 | 0 | 0.00 | 0 |
2012 | SWEPI LP | 127,243.52 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 101,371.64 | 297 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 81,543.35 | 229 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 83,106.85 | 220 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 71,609.57 | 140 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 84,245.02 | 120 | 0.00 | 0 | 0.00 | 0 |
2018 | SWEPI LP | 84,303.22 | 125 | 0.00 | 0 | 0.00 | 0 |
2019 | SWEPI LP | 91,394.82 | 226 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | EAST RESOURCES MGMT LLC | Fracing Fluid Waste | 14,355.10 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | SWEPI LP | Fracing Fluid Waste | 4,464.57 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Produced Fluid | 2,378.23 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Fracing Fluid Waste | 54.89 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | SWEPI LP | Fracing Fluid Waste | 66.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | SWEPI LP | Fracing Fluid Waste | 847.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Fracing Fluid Waste | 16.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2013 | SWEPI LP | Produced Fluid | 436.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Produced Fluid | 169.84 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Fracing Fluid Waste | 14.63 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Produced Fluid | 85.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | SWEPI LP | Produced Fluid | 313.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2014 | SWEPI LP | Produced Fluid | 815.69 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Produced Fluid | 55.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SWEPI LP | Produced Fluid | 20.72 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SWEPI LP | Produced Fluid | 111.93 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | SWEPI LP | Produced Fluid | 68.81 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | SWEPI LP | Produced Fluid | 552.96 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWEPI LP | Soil Contaminated by Oil | 0.12 Tons | LANDFILL | 301358 |
2016 | SWEPI LP | Produced Fluid | 16.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | SWEPI LP | Produced Fluid | 773.89 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWEPI LP | Soil Contaminated by Oil & Gas Related Spills | 0.12 Tons | LANDFILL | 301358 |
2016 | SWEPI LP | Other Oil & Gas Wastes | 0.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2017 | SWEPI LP | Produced Fluid | 34.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | SWEPI LP | Produced Fluid | 683.63 Bbl | REUSE (AT WELL PAD) | |
2017 | SWEPI LP | Waste Water Treatment Sludge | 0.94 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | SWEPI LP | Soil Contaminated by Oil | 8.47 Tons | LANDFILL | 301358 |
2017 | SWEPI LP | Soil Contaminated by Oil & Gas Related Spills | 8.47 Tons | LANDFILL | 301358 |
2017 | SWEPI LP | Waste Water Treatment Sludge | 1.18 Tons | STORAGE PENDING DISPOSAL OR REUSE | PA-0678 |
2017 | SWEPI LP | Produced Fluid | 2.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | SWEPI LP | Produced Fluid | 283.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2018 | SWEPI LP | Produced Fluid | 486.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2018 | SWEPI LP | Produced Fluid | 466.16 Bbl | REUSE (AT WELL PAD) | |
2018 | SWEPI LP | Produced Fluid | 16.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | SWEPI LP | Produced Fluid | 93.96 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | SWEPI LP | Produced Fluid | 21.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | SWEPI LP | Produced Fluid | 133.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2019 | SWEPI LP | Produced Fluid | 83.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2019 | SWEPI LP | Produced Fluid | 311.51 Bbl | REUSE (AT WELL PAD) | |
2019 | SWEPI LP | Produced Fluid | 149.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1852742 | Primary Facility | 2009-12-23 | Routine/Complete Inspection | Violation(s) Noted | two unpermitted stream crossings. E&S plan doeas not reflect access road or encroachments. Cert mail NOV sent 12/31/2009 MAB |
1978315 | Primary Facility | 2011-05-27 | Compliance Evaluation | Pending | 2.15 ms/cm conductance in puddle on pad |
2096187 | Primary Facility | 2012-08-30 | Routine/Partial Inspection | No Violations Noted | |
2290691 | Primary Facility | 2014-07-18 | Site Restoration | No Violations Noted | Resto Rep approved. |
2382508 | Primary Facility | 2015-06-24 | Site Restoration | No Violations Noted | Fill slope has straw mulch and lacks permanent vegetation. NOT & Restoration Reports submitted; approval of them not recommended at this time |
2399305 | Primary Facility | 2015-08-12 | Site Restoration | No Violations Noted | The Department inspected the SWEPI LP – Chapman 237 site in Sullivan Twp., Tioga Co. on 8/12/15 @ 1230 hours in response to receipt of a Notice of Termination and Well Site Restoration Report by the Department on 7/27/15. The weather was 75°, partly cloudy with 71% humidity. This site was permitted under the Krause Meter ESCGP-1 59-09-805. |
2497268 | Primary Facility | 2016-06-30 | Incident- Response to Accident or Event | No Violations Noted | SWEPI called to report a 10 gallon release of produced liquid. 6 Marcellus Shale wells producing natural gas from this ~1.3 acre pad |
2835794 | Primary Facility | 2019-02-04 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a routine inspection of SWEPI's Chapman 237 Well Pad in Sullivan Twp, Tioga County on 2/4/2019 at 1225 hours. The weather was sunny and 54 degrees. Very little snow currently remains on the pad. The act 9 sign was observed at the start of the access road and the E&S Plan was in the mailbox. I spoke with the landowner onsite who mentioned an area on the pad slope that is constantly wet. I will document and follow up with this.
There are currently 6 wells in production, the 1H-6H with 6 production tanks. All PCSM BMPs are in place and functioning. The site remains well stabilized and vegetated. The bridge/access road crossing of the stream north of the pad looked good and no erosion was observed. All fluids on the pad surface and in containment that were field measured has conductivities within normal ranges. No violations noted today, I departed the site at 1305. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1852742 | 578698 | 12/23/2009 | 2009-12-23 | 102.4INADPLN - E&S Plan not adequate | Administrative | 102.4(b)(5) plan doeas not include access road and encroachments |
1852742 | 578699 | 12/23/2009 | 2009-12-23 | 105NOPERMIT - Encroachment without Permit or Waiver | Environmental Health & Safety | 105.11 two unpermitted stream crossings |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
578698 | 253849 | NOV - Notice of Violation | Comply/Closed | 2011-04-19 | |||
578698 | 258931 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-04-19 | 2011-04-19 | $44,125.00 | $44,125.00 |
578698 | 269674 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-04-19 | 2011-04-19 | $44,125.00 | $44,125.00 |
578699 | 253849 | NOV - Notice of Violation | Comply/Closed | 2011-04-19 | |||
578699 | 258931 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-04-19 | 2011-04-19 | $44,125.00 | $44,125.00 |
578699 | 269674 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-04-19 | 2011-04-19 | $44,125.00 | $44,125.00 |
For data sources see[7]