If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-20874 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.773653,"lon":-77.243336,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Charleston Township | |
Operator Name: SWEPI LP | |
Well Pad ID: 148781 | |
Farm/Lease Name: T LOPATOFSKY | |
License Status: INACTIVE | |
Spud Date: | |
Permit Date: 2010-08-26 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.773653 | |
Longitude: -77.243336 |
Date | Event |
---|---|
2010-08-26 | New Permit Application |
2011-01-03 | Performed Spud Operation |
2011-01-21 | Drilling Completion |
2012-01-11 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | EAST RESOURCES MGMT LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SWEPI LP | Fracing Fluid Waste | 2,044.59 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Produced Fluid | 117.73 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Produced Fluid | 31.44 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Fracing Fluid Waste | 54.72 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Produced Fluid | 1,608.08 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Produced Fluid | 129.78 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SWEPI LP | Produced Fluid | 12.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SWEPI LP | Produced Fluid | 76.88 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1946333 | Primary Facility | 2011-01-31 | Routine/Complete Inspection | No Violations Noted | RTNC Insp after tophole rig moved off site. TLT |
2109998 | Primary Facility | 2012-10-22 | Routine/Complete Inspection | No Violations Noted | |
2155002 | Primary Facility | 2013-04-09 | Routine/Complete Inspection | No Violations Noted | |
2175015 | Primary Facility | 2013-06-13 | Follow-up Inspection | No Violations Noted | |
2406712 | Primary Facility | 2015-09-11 | Routine/Complete Inspection | No Violations Noted | |
2463200 | Primary Facility | 2016-03-09 | Routine/Complete Inspection | No Violations Noted | Routine inspection. The 1V, 1H - 3H and 23H wells have been drilled. Conductors have been set for the 4H - 6H wells. The 23H well is in production. The pad has not been restored, although is permanently stabilized. Some erosion observed at the southeast pad corner; requested that the erosion feature be repaired. Department received a request from SWEPI on 1/11/16 to extend the restoration requirements for the site. TLT |
2538495 | Primary Facility | 2016-11-16 | Site Restoration | No Violations Noted | Restoration inspection. Notice of Termination (NOT) received on 11/14/16. The Well Site Restoration Report (WSRR) was received on 11/16/16 and covers the 1V, 1H - 6H and 23H wells. Interim site restoration completed between July - August 2016. Post construction stormwater management (PCSM) BMP’s have been installed. Areas disturbed during the construction of the PCSM BMPs are permanently stabilized as per 25 Pa Code §102.22(a)(2) and temporary E&S controls have been removed. Recommend approval of the NOT. The WSRR was acknowledged on 11/21/16. TLT |
2590350 | Primary Facility | 2017-05-04 | Routine/Partial Inspection | No Violations Noted | EC w an Oakton PCSTestr 35 from a puddle on the pad--0.80 mS/cm. |
2638441 | Primary Facility | 2017-09-21 | Routine/Partial Inspection | No Violations Noted | Electrical conductivity of puddle on pad with an Oakton PCSTestr 35 read 0.72 mS/cm. |
2735541 | Primary Facility | 2018-05-30 | Routine/Complete Inspection | No Violations Noted | Warm/windy at time of inspection. |
2790322 | Primary Facility | 2018-10-17 | Routine/Complete Inspection | No Violations Noted | Cool/rainy windy at time of inspection. |
For data sources see[7]