If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-20880 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.781139,"lon":-77.223461,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Charleston Township | |
Operator Name: SWEPI LP | |
Well Pad ID: 147877 | |
Farm/Lease Name: BURKE 285 1V | |
License Status: Plugged and Abandoned | |
Spud Date: 2010-11-04 | |
Permit Date: 2010-09-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.781139 | |
Longitude: -77.223461 |
Date | Event |
---|---|
2010-09-01 | New Permit Application |
2010-11-01 | Performed Spud Operation |
2010-11-17 | Drilling Completion |
2012-08-16 | NEWLY DRILLED |
2014-05-09 | Inactive Well Request Granted |
2018-06-07 | Begin Plugging |
2018-06-10 | Finished Plugging |
2018-07-18 | Fully Plugged |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | EAST RESOURCES MGMT LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1971373 | Primary Facility | 2011-04-28 | Routine/Complete Inspection | Violation(s) Noted | |
2007645 | Primary Facility | 2011-09-29 | Follow-up Inspection | No Violations Noted | FUI to correct 4/28/11 E&S viol. TLT |
2110007 | Primary Facility | 2012-10-22 | Routine/Complete Inspection | No Violations Noted | |
2406737 | Primary Facility | 2015-09-14 | Routine/Complete Inspection | No Violations Noted | |
2479664 | Primary Facility | 2016-04-25 | Complaint Inspection | No Violations Noted | Complaint inspection. The 5H & 6H wells were being plugged at time of complaint. The 5H and 6H wells were spud on 12/8/11 (80' of conductor pipe installed), however never drilled. A stained area was noted on pad surface. Staining was grayish-brown in color. SWEPI stated that cellar water and surface water which had accumulated in the conductor pipe was discharged to pad surface to infiltrate. Staining on pad was surficial. Requested that SWEPI evaluate stained area and determine whether remedial actions are necessary. TLT |
2496295 | Primary Facility | 2016-06-28 | Routine/Complete Inspection | No Violations Noted | |
2560964 | Primary Facility | 2017-02-10 | Routine/Partial Inspection | No Violations Noted | Partial inspection. Site idle and snow covered. 1H - 4H have been partially drilled to depth of 2030' (according to Well Record Reports). The 5H & 6H wells were plugged in April 2016. The 1V well was placed on inactive status on 5/9/14. SWEPI's two-year restoration extension request was approved on 5/4/16. A new ESCGP2 application is currently under review. Permanent stablization and E&S controls were not observed due to the snow cover. No violations were cited during the inspection. TLT |
2602978 | Primary Facility | 2017-06-06 | Routine/Partial Inspection | No Violations Noted | Puddle on pad 0.18 mS/cm w an Oakton PCSTestr 35. Onsite ~1415-1510. |
2742732 | Primary Facility | 2018-06-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | A routine inspection of this plugged vertical unconventional well was conducted June 15, 2018. The rig and equipment are off location following plug and abandonment. The well is now plugged, cut, marked and buried below grade. There were no open holes, discharges, venting, or other issues observed. No gas was detected at the surface location of the plugged well. |
2779461 | Primary Facility | 2018-09-25 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Routine (pre-plugging) inspection of 4 wells on the pad which are "top-holed"; surface/intermediate casings installed and cemented, cemented shoe track in 9 5/8" casing, and no openhole below the casing shoe. It was reported no oil or gas zones were encountered. At the time of inspection, all four wells had cellars full of gravel. Wells are capped. Annular vents were present. No gas was detected at the vents or in the gravel next to well caps. Also on location is the recently plugged 1V well which is cut and buried. There were no open holes, discharges, venting, or any other obvious issues observed on location during this inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1971373 | 610562 | 04/28/2011 | 2011-04-28 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | 102.4(b)(1). Erosion gullies noted. Additional stabilization needed. ECB not installed as per plan. TLT |
For data sources see[6]