Well Details

Well ID: 37-117-20974
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Duncan Township
Operator Name: EQT PROD CO
Well Pad ID: 149048
Farm/Lease Name: PHOENIX 590883
License Status:
Spud Date:
Permit Date: 2010-10-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.649808
Longitude: -77.265281

For data sources see[1][2][3]

Well History

Date Event
2002-02-16 Drilling Completion
2010-10-28 New Permit Application
2011-09-23 Performed Spud Operation
2011-10-25 Permit Renewal Application
2012-04-05 New Permit Application
2012-05-25 Perforation
2014-02-12 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-06-18 2012-06-18 7,889 11,780,874

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WG-36 Halliburton Gelling Agent Naptha, hydrotreated heavy 64742-48-9 None None
Guar Gum 9000-30-0 100.0 0.00487
GBW-30 Halliburton Enzyme Breaker Hemicellulase Enzyme 9012-54-8 15.0 None
BE-9 Halliburton Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 10.0 0.00409
BA-40L Halliburton Buffer Potassium carbonate 584-08-7 60.0 0.01073
FR-66 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 30.0 0.02731
HCl Halliburton Corrosion Inhibitor
HCl Halliburton 15 HCl Acid Methanol 67-56-1 60.0 0.00025
Propargyl Alcohol 107-19-7 10.0 0.00004000
Hydrochloric Acid 7647-01-0 28.0 0.02552
LP-65 Halliburton Scale Inhibitor Ammonium chloride 12125-02-9 10.0 0.00255
SP Breaker Halliburton Oxidizing Breaker Sodium Persulfate 7775-27-1 100.0 0.00015

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 EQT PROD CO 0.00 0 0.00 0 0.00 0
2011 EQT PROD CO 0.00 0 0.00 0 0.00 0
2012 EQT PROD CO 596,569.00 150 0.00 0 0.00 0
2013 EQT PROD CO 766,284.00 365 0.00 0 0.00 0
2014 EQT PROD CO 567,688.00 365 0.00 0 0.00 0
2015 EQT PROD CO 152,665.00 157 0.00 0 0.00 0
2016 EQT PROD CO 293,918.00 364 0.00 0 0.00 0
2017 EQT PROD CO 248,532.00 364 0.00 0 0.00 0
2018 EQT PROD CO 214,280.00 347 0.00 0 0.00 0
2019 EQT PROD CO 189,104.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 EQT PROD CO Produced Fluid 402.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012 EQT PROD CO Produced Fluid 19,526.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EQT PROD CO Drilling Fluid Waste 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EQT PROD CO Produced Fluid 12,711.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid 6,485.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 EQT PROD CO Fracing Fluid Waste 20,613.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid 606.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012 EQT PROD CO Produced Fluid 1,039.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2012 EQT PROD CO Produced Fluid 2,454.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2012 EQT PROD CO Fracing Fluid Waste 2,073.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 EQT PROD CO Produced Fluid 2,451.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Produced Fluid 206.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 EQT PROD CO Produced Fluid 3,870.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 EQT PROD CO Produced Fluid 4,382.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 EQT PROD CO Produced Fluid 2,185.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 EQT PROD CO Produced Fluid 469.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2013 EQT PROD CO Produced Fluid 563.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2014 EQT PROD CO Drilling Fluid Waste 24.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Produced Fluid 490.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Produced Fluid 5,169.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 EQT PROD CO Produced Fluid 353.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 EQT PROD CO Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 EQT PROD CO Produced Fluid 711.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015 EQT PROD CO Produced Fluid 240.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 EQT PROD CO Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2015 EQT PROD CO Produced Fluid 424.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3097
2015 EQT PROD CO Fracing Fluid Waste 30.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Fracing Fluid Waste 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 EQT PROD CO Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2015 EQT PROD CO Produced Fluid 5,129.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 1,715.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 EQT PROD CO Produced Fluid 605.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 EQT PROD CO Other Oil & Gas Wastes 275.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 EQT PROD CO Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2016 EQT PROD CO Produced Fluid 1,047.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Produced Fluid 285.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 EQT PROD CO Other Oil & Gas Wastes 719.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 EQT PROD CO Produced Fluid 1,804.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 EQT PROD CO Other Oil & Gas Wastes 564.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 225.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 EQT PROD CO Other Oil & Gas Wastes 2,248.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 EQT PROD CO Produced Fluid 495.00 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 173.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 EQT PROD CO Other Oil & Gas Wastes 155.00 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 41.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EQT PROD CO Other Oil & Gas Wastes 92.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 42.41 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 EQT PROD CO Other Oil & Gas Wastes 142.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 EQT PROD CO Produced Fluid 58.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 EQT PROD CO Produced Fluid 599.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 EQT PROD CO Produced Fluid 328.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 EQT PROD CO Produced Fluid 7.39 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 EQT PROD CO Produced Fluid 401.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 73.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 EQT PROD CO Produced Fluid 1.89 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 43.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 EQT PROD CO Other Oil & Gas Wastes 644.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EQT PROD CO Produced Fluid 65.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 EQT PROD CO Other Oil & Gas Wastes 2.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 EQT PROD CO Other Oil & Gas Wastes 92.86 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 85.39 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 EQT PROD CO Other Oil & Gas Wastes 34.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 8.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 977.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EQT PROD CO Other Oil & Gas Wastes 92.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1974299 Primary Facility 2011-05-13 Routine/Complete Inspection Violation(s) Noted
2001116 Primary Facility 2011-08-30 Follow-up Inspection Outstanding Violations - No Viols Req'd FUI insp to correct E&S viol. 102.4(b)(1) and 102.22(b)(1) are outstanding. TLT
2002301 Primary Facility 2011-09-13 Follow-up Inspection No Violations Noted FUI insp to resolve outstanding violations from 5-13-11. TLT
2066473 Primary Facility 2012-05-09 Routine/Complete Inspection No Violations Noted
2126726 Primary Facility 2012-12-28 Routine/Partial Inspection No Violations Noted
2139753 Primary Facility 2013-02-06 Routine/Partial Inspection No Violations Noted
2145014 Primary Facility 2013-03-01 Routine/Partial Inspection No Violations Noted
2230366 Primary Facility 2013-11-05 Routine/Complete Inspection No Violations Noted
2254692 Primary Facility 2014-02-27 Follow-up Inspection No Violations Noted
2319523 Primary Facility 2014-11-06 Routine/Complete Inspection No Violations Noted
2328164 Primary Facility 2014-11-25 Routine/Partial Inspection No Violations Noted Drill rig recently moved off site. Site preparation and mobilization for frac ongoing during inspection. TLT
2336079 Primary Facility 2015-01-13 Administrative/File Review No Violations Noted Review of lab results for samples collected on 11/25/14 from standing water on pad surface following drilling operations. Results show concentrations that exceed Department standards for constituents indicative of oil and gas operations. Violations cited against Phoenix 590888 well permit (117-20981) TLT.
2343266 Primary Facility 2015-02-11 Routine/Complete Inspection No Violations Noted
2352470 Primary Facility 2015-03-11 Routine/Partial Inspection No Violations Noted Violation cited against Phoenix 590888 well (117-20981) during 3/11/15 inspection for failure to maintain E&S controls to prevent the potential for accelerated erosion and sedimentation. Access road to the site not maintained to prevent tracking of mud onto State Route 3009. Equipment mobilized to site the next day to sweep SR 3009 and improve stabilization on the access road. Violation immediately corrected. TLT
2367824 Primary Facility 2015-05-04 Follow-up Inspection No Violations Noted Follow up inspection to resolve 1/13/15 violations. New violations observed and cited against Phoenix 590888 well (117-20981). TLT
2375723 Primary Facility 2015-05-29 Follow-up Inspection No Violations Noted Follow up inspection to verify whether 5/4/15 violations (cited against 117-20981) have been resolved. Stained material still present. Sample 2519-626 collected. TLT
2407346 Primary Facility 2015-09-14 Follow-up Inspection No Violations Noted Follow up inspection to resolve the 5/4/15 violations against the Phoenix 590888 well (117-20981). EQT provided a follow up response on 6/8/15 that included soil sample results to document the cleanup. Concentrations were below applicable standards. 5/29/15 Department results were also below the applicable standards. TLT
2511835 Primary Facility 2016-08-16 Routine/Partial Inspection No Violations Noted Partial inspection to observe reclamation of Impoundment #1. Impoundment dewatered and liner removed. Gray subbase material observed on impoundment walls and floor. Field conductivity screening completed of standing water and impoundment floor soil. No violations cited. TLT
2530381 Primary Facility 2016-10-14 Routine/Complete Inspection No Violations Noted Routine inspection. Both freshwater impoundments and topsoil stockpile have been reclaimed. The east and south well pad corner sumps have been removed and an infiltration basin constructed southeast of the well pad. No violations cited. TLT
2531655 Primary Facility 2016-10-26 Routine/Complete Inspection No Violations Noted Inspection of EQT’s Phoenix 590997 (117-20977) plugged well in Duncan Twp. Tioga Co. conducted October 26, 2016 at 12:15 pm. At the time of inspection; the cellar was filled with water with 3” tagged standpipe monument about 8’ high. The top of the monument was open ended “T”, ran hose for Altair 5x gas meter in the vent; no gas detected. There were (7) active gas wells in production on the pad; #590885 (117-20966), #590884 (117-20975), #590883 (117-20974), #590892 (117-20985), #590890 (117-20983), #590889 (117-20982), #590888 (117-20981). Conducted visual inspection of WH and cellar; no obvious conecrns.
2535683 Primary Facility 2016-11-03 Site Restoration No Violations Noted Well Site Restoration Reports (WSRRs) received on 11/1/16. Since the new 25 Pa Code Ch. 78a regulations are in effect, WSRR's are to be submitted on the updated form through the Greenport website. This information was conveyed to EQT along with the request that the WSRRs be submitted electronically on the updated form. Interim restoration has been completed at the site and vegetative cover is becoming established. TLT
2544167 Primary Facility 2016-12-06 Site Restoration No Violations Noted Restoration inspection. Notice of Termination (NOT) received on 11/16/16 and Well Site Restoration Report submitted through Greenport on 12/6/16. Post-construction stormwater management BMPs have been installed. Vegetation is becoming established, however, entire site has not achieved 70% uniform vegetative cover and silt sock remains in place at the former Impoundment #1 location. Recommend that NOT be denied. Recommend that the NOT and WSRR be resubmitted after vegetation becomes more established and silt sock is removed. TLT
2551761 Primary Facility 2017-01-12 Routine/Complete Inspection No Violations Noted
2596522 Primary Facility 2017-05-19 Site Restoration No Violations Noted On 5/19/17 at 1402 hrs I conducted an inspection of the Phoenix Pad R well site. No one was present during the inspection. It was mostly sunny and 84°F.

I observed the site and reviewed the erosion and sedimentation (E&S) routine inspection log, the Notice of Termination (NOT) and the Well Site Restoration Report (WSRR).

The well site has been restored and post-construction stormwater management (PCSM) BMPs have been installed. Temporary E&S controls have been removed and the project is permanently stabilized as per 25 Pa Code Section 102.22(a)(2). The last routine E&S inspection was conducted on 5/15/17.

Based on existing conditions, I recommend approval of the NOT. The WSRR was approved on 5/22/17. No violations were cited during this inspection. I concluded the inspection at 1433 hrs. TLT

2678326 Primary Facility 2018-01-04 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) inspected the EQT Phoenix pad R located in Duncan Township, Tioga County on January 4, 2018 at 1130 hrs. The weather was 16 degrees. Overcast with 3 inches of snow on the ground. 22 mph winds out of the NW. Humidity 61%. Pressure 29.7 inHg.

No activity was observed on site during the inspection. There appear to be seven active wells on the pad 590883-590885, 590888-590890, 590892. An AST labeled "freshwater only" was observed onsite. Containment with matting was observed under the hoses. A number of water trucks were idling onsite.

No issues were observed. No violations were noted at this time. I departed the site at 1330 hours.

2702157 Primary Facility 2018-03-06 Routine/Partial Inspection No Violations Noted The department of environmental protection conducted an inspection of the EQT Phoenix pad R in response to report of a spill to the ground surface received March 3, 2018 @1315 hours. Present onsite was Jim Kelley, EQT Assistant Superintendent.

A stuck dump valve caused an overfill of a 100 BBL capacity storage tank. EQT estimated the spill of produced water to be between 30-40 gallons. The fluid settled in a low area on the pad surface adjacent to the tank. The impacted area, approximately 15' x 5' x 10", was excavated and "burrito" wrapped in plastic until a waste rolloff container was delivered.

As of today's inspection, the impacted material has been moved to the rolloff container. The excavated area has been backfilled with clean gravel. Mr. Kelley reported the malfunctioning valve has been repaired. A copy of the monthly tank inspection report, required under 25 Pa Code 78a.57(i), was requested from the Operator.

I departed the site at 1400 hours.

2807917 Primary Facility 2018-11-28 Routine/Partial Inspection No Violations Noted The DEP conducted an INCIDENT inspection of the EQT Pad R site located in Duncan Twp, Tioga Co. on 10/28/2018 at 1015 hours in response to spill notification #338402.

Cory Guiles of EQT reported that at 2:40 pm on 11/27/2018, "there was a release of hydraulic fluid to the pad surface. There was a mechanical failure on a water truck that allowed 20 gallons of hydraulic fluid to be released to the pad surface of Phoenix R. They are in the process of cleaning up the impacted soil now and will store it in drums."

As of today's inspection, no personnel were located onsite. I contacted Corey Giles, EQT to confirm the location of the spill. He stated he was under the impression it was in front of the production tanks, approximately 1 barrel of material was removed and had already been backfilled with clean material. During the course of the inspection Tim Ryan, EQT well tender appeared onsite and showed me the location of the spill. A small area adjacent to the well heads appears to have been recently disturbed.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1974299 611505 05/13/2011 2011-05-13 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety 102.4(b)(1) for failure to implement/maintain BMP's. Site construction incomplete. Some BMP's not implemented. BMP's that have been installed haven't been maintained. TLT
1974299 611506 05/13/2011 2011-05-13 102.4NOPLAN - No E&S plan developed, plan not on site Administrative 102.4(b)(8). Copies of weekly E&S inspections not maintained at the site. TLT
1974299 611507 05/13/2011 2011-05-13 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. Administrative 102.22(b)(1) for failure to temporarily stabilize the site. Nothing was stabilized. TLT
1974299 611508 05/13/2011 2011-05-13 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Environmental Health & Safety 691.402 CSL for potential to pollute Waters of the Commonwealth. Sediment observed beyond perimeter controls as much as 50 yds into the woods. TLT