X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-21280

Well Details

Well ID: 37-117-21280
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Chatham Township
Operator Name: SWEPI LP
Well Pad ID: 149297
Farm/Lease Name: SHOWALTER 822 3H
License Status: INACTIVE
Spud Date:
Permit Date: 2011-08-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.895233
Longitude: -77.391506

For data sources see[1][2][3]

Well History

Date Event
2011-08-05 New Permit Application
2011-08-12 Performed Spud Operation
2011-10-16 Drilling Completion
2012-07-20 DEVIATED
2013-12-17 Perforation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-12-19 2013-12-22 4,955 705,810 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCl Various Opens Perfs HCl 7647-01-0 15 0.000524148 3268.38
HEC-602i WST Increases fluid Viscosity Distillates, petroleum, hydrotreated light 64742-47-8 60 0.00957485 372,296,000,000.0
AP Live Weatherford Breaks down viscosity Ammonium Persulfate 7727-54-0 100 0.00112158 43,609,900,000.0
AI-250 Clear water Protects Steel Ethoxylated Nonylphenol 68412-54-5 13 0.00210756 81,947,600,000.0
Tar bases, quinoline dervis, benzyl chloride-quaternized 72480-70-7 10 0.0016212 63,036,600,000.0
Glycol Ethers 111-76-2 40 0.0064848 252,146,000,000.0
Propargyl Alcohol 107-19-7 40 0.0064848 252,146,000,000.0
Isopropanol 67-63-0 40 0.0064848 252,146,000,000.0
Water / Produced Water Shell Carrier Fluid H2O + Disolved Salts NA 100 0.843063 5,257,000.0
Bioclear 1000 Clearwater Kills Bacteria NA NA 100 0.00002195 853,653,000.0
Ecopol Buffer-HC Economy pH Concentrate Potassium Carbonate 584-08-7 40 0.000292007 11,354,000,000.0
Potassium Hydroxide 1310-58-3 30 0.000219005 8,515,520,000.0
Proppant Various Proppagates Frac Trade Secret NA 100 0.119399 7445.24

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 SWEPI LP 0.00 0 0.00 0 0.00 0
2012 SWEPI LP 0.00 0 0.00 0 0.00 0
2013 SWEPI LP 0.00 0 0.00 0 0.00 0
2014 SWEPI LP 0.00 0 0.00 0 0.00 0
2015 SWEPI LP 0.00 0 0.00 0 0.00 0
2016 SWEPI LP 0.00 0 0.00 0 0.00 0
2017 SWEPI LP 0.00 0 0.00 0 0.00 0
2019 SWEPI LP 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 SWEPI LP Produced Fluid 79.76 Bbl REUSE OTHER THAN ROAD SPREADING
2012 SWEPI LP Fracing Fluid Waste 4,587.98 Bbl REUSE OTHER THAN ROAD SPREADING
2015 SWEPI LP Produced Fluid 1,310.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SWEPI LP Produced Fluid 133.33 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2006401 Primary Facility 2011-09-22 Routine/Complete Inspection No Violations Noted Well not spudded as of 9/22/2011
2025006 Primary Facility 2011-12-08 Routine/Complete Inspection No Violations Noted
2065938 Primary Facility 2012-05-08 Routine/Complete Inspection No Violations Noted
2066238 Primary Facility 2012-05-09 Routine/Partial Inspection No Violations Noted A routine partial inspection was conducted at the Showalter pad on 5/9/12. The last inspection conducted on behalf of the operator was on 5/7/12 by Penn E&R. There was 17 wheelie tanks on-site and they were on containment. Several puddles on the pad (not on containment) were screened for elevated conductivity, none exhibited high readings. One area on containment had a reading of 4.27 mS. This was located near the wheelie tank N37013. There were multiple holes observed in the liner, but none in the area of the elevated reading. The cause of the elevated reading should be determined and corrected. The liquid on the liner should be collected and disposed of properly. The integrity of the liner should be retired as soon as possible. No erosion issued were observed during this inspection. No new violations were cited during this inspection. - MRN
2201788 Primary Facility 2013-09-03 Routine/Partial Inspection No Violations Noted An inspection of the Showalter 822 site in Chatham Township, Tioga County was conducted on September 3, 2013. The last inspection conducted on behalf of the operator was on 8/19/2013. The 1H, 2H and 4H wells were drilled and appeared to be in production, one additional well was spudded. No puddles exhibiting elevated conductivity or erosion issues were observed at this time. All area were well vegetated or otherwise stabilized, no issues were noted. No violations were cited during this inspection
2260449 Primary Facility 2014-02-11 Drilling/Alteration No Violations Noted
2442845 Primary Facility 2016-01-20 Complaint Inspection No Violations Noted The Department inspected the SWEPI LP site – Showalter 822 (ESX11-117-0011) located in Chatham Twp., Tioga Co. on 1/20/2016 @ 1115 hours. The weather was 18° and overcast with blustery winds and a dusting of snow and ice. A copy of the E&S plan was located in the mailbox along with the onsite inspection log, well permits and PPC Plan. The site was last inspected by company personnel on 1/14/2016 with “site snow covered” listed in the comments section. Total Project area is listed as 20.20 acres. The receiving stream is listed as “UNT to Crooked Creek/Susquehanna River Basin in PA” WWF designation.
2636107 Primary Facility 2017-09-14 Routine/Partial Inspection No Violations Noted EC readings with Oakton PCSTestr 35 (mS/cm): pad--0.25, containment--0.48.
2696049 Primary Facility 2018-02-20 Routine/Partial Inspection No Violations Noted Electrical conductivity (EC) readings taken with an Oakton PCSTestr 35. Puddle on pad gave a 0.25 mS/cm reading. Inspection logbook is in mailbox near production tank; last inspection listed February 17, 2018. Air temp 62F. JLP
2729683 Primary Facility 2018-05-14 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the SWEPI LP-Showalter 822 Well Pad located in Chatham Township, Tioga County on May 14, 2018 at 1300 hrs. the weather was 73° and sunny. Winds WSW @9 mph, 53% humidity.

The current ESCGP-2 authorizes the expansion of the existing well pad by adding a 41,241 ft² section to the west, northwest, and south west side of the pad as well as the addition of a 200'x 200' tank pad. The well pad was previously in interim restoration with 4 wells observed drilled, 3 of which appear to be in production.

As of today's inspection contractor JL watts is in the process of expanding the pad. Temporary erosion and sediment control's appear to be installed as specified in the plan drawings. No erosion or sedimentation was observed.

No violations were noted at this time. Please contact me with any questions. I departed the site at 1420 hrs.

-ELN

2775766 Primary Facility 2018-09-17 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the SWEPI LP - Showalter 822 well pad located in Chatham Twp, Tioga Co. on 917/2018 @1245 hours. The weather was 72 degrees and cloudy, winds N @11mph, 94% humidity. Present for the inspection was myself and Korey Starkey, DEP Env Trainee.

The access road, well pad, and E&S controls were observed. The current ESCGP-2 authorized the expansion of the existing well pad by adding a 41,241 ft² section to the west, northwest, and south west side of the pad as well as the addition of a 200'x 200' tank pad.

The well pad was previously in interim restoration with 4 wells observed drilled, 3 of which appear to be in production. 4 new well cellars were observed on the pad surface. An infiltration basin was observed below the north side of the well pad. Temporary BMPs were observed in the form of CFS below the newly constructed pony pad and below the pad expansion area. No erosion or sedimentation was observed onsite.

The site was last inspected by company on 9/15/2018 with n

For data sources see[8]

References