If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-21292 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.687361,"lon":-77.078928,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Blossburg Borough | |
Operator Name: SENECA RESOURCES CO LLC | |
Well Pad ID: 148214 | |
Farm/Lease Name: DCNR 595 PAD E 9H 50178 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-07-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.687361 | |
Longitude: -77.078928 |
Date | Event |
---|---|
2011-07-22 | New Permit Application |
2011-08-23 | Performed Spud Operation |
2011-12-15 | New Permit Application |
2012-02-02 | Drilling Completion |
2012-05-04 | Perforation |
2012-12-13 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-06-02 | 2012-06-02 | 8,014 | 6,759,312 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Proppant 40/70 Ottawa | Universal Well Services | Proppant | Quartz | 14808-60-7 | 100.00 | 0.04 | |
Unigel 5F | Universal Well Services | Guar Gel Dry Add | Guar Gum | 100.00 | 0.00000082 | |||
Unihib G | Universal Well Services | Corrosion Inhibitor | Ethoxylated Alcohol | 35.00 | 0.00000128 | |||
Resin Based Nonionic Inhibitor | 35.00 | 0.00000128 | ||||||
Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00000183 | |||||
Proppant 80/100 Oklahoma | Universal Well Services | Proppant | Quartz | 14808-60-7 | 100.00 | 0.00258758 | ||
ScaleHib 100 | Universal Well Services | Scale Inhibitor | Ethylene glycol | 107-21-1 | 60.00 | 0.00008234 | ||
Iron Stabilizer II | Universal Well Services | Corrosion Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00000448 | ||
7.5 HydroChloric Acid | Universal Well Services | Acid | Hydrochloric acid | 7647-01-0 | 7.50 | 0.00052264 | ||
GB L | Universal Well Services | Breaker | Ethylene glycol | 107-21-1 | 60.00 | 0.00000001 | ||
15 HydroChloric Acid | Universal Well Services | Acid | Hydrochloric acid | 7647-01-0 | 15.00 | 0.00018859 | ||
BioRid 20L | Tetra | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00002443 | ||
Sodium bromide | 7647-15-6 | 15.00 | 0.00001832 | |||||
Unislik ST 50 | Universal Well Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.00029157 | ||
Proppant 30/50 Ottawa | Universal Well Services | Proppant | Quartz | 14808-60-7 | 100.00 | 0.03 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | SENECA RESOURCES CO LLC | 594,126.00 | 162 | 0.00 | 0 | 0.00 | 0 |
2013 | SENECA RESOURCES CO LLC | 1,113,946.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | SENECA RESOURCES CO LLC | 786,086.20 | 345 | 0.00 | 0 | 0.00 | 0 |
2015 | SENECA RESOURCES CO LLC | 348,068.01 | 178 | 0.00 | 0 | 0.00 | 0 |
2016 | SENECA RESOURCES CO LLC | 415,891.35 | 133 | 0.00 | 0 | 0.00 | 0 |
2017 | SENECA RESOURCES CO LLC | 610,398.77 | 354 | 0.00 | 0 | 0.00 | 0 |
2018 | SENECA RESOURCES CO LLC | 423,849.93 | 351 | 0.00 | 0 | 0.00 | 0 |
2019 | SENECA RESOURCES CO LLC | 357,716.23 | 361 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | SENECA RESOURCES CO LLC | Drill Cuttings | 817.71 Tons | LANDFILL | 301358 |
2012 | SENECA RESOURCES CO LLC | Produced Fluid | 641.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2012 | SENECA RESOURCES CO LLC | Produced Fluid | 329.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20525 |
2012 | SENECA RESOURCES CO LLC | Produced Fluid | 95.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2012 | SENECA RESOURCES CO LLC | Produced Fluid | 174.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2012 | SENECA RESOURCES CO LLC | Produced Fluid | 655.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2012 | SENECA RESOURCES CO LLC | Fracing Fluid Waste | 162.00 Bbl | INJECTION DISPOSAL WELL | 34-007-22038 |
2012 | SENECA RESOURCES CO LLC | Produced Fluid | 7,360.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SENECA RESOURCES CO LLC | Produced Fluid | 14.00 Bbl | INJECTION DISPOSAL WELL | 34-083-24072 |
2012 | SENECA RESOURCES CO LLC | Produced Fluid | 96.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23203 |
2012 | SENECA RESOURCES CO LLC | Produced Fluid | 42.00 Bbl | INJECTION DISPOSAL WELL | 34-151-23420 |
2012 | SENECA RESOURCES CO LLC | Drill Cuttings | 323.85 Tons | LANDFILL | 301358 |
2012 | SENECA RESOURCES CO LLC | Fracturing Fluid Waste | 1.57 Tons | LANDFILL | 301358 |
2012 | SENECA RESOURCES CO LLC | Fracing Fluid Waste | 2,777.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SENECA RESOURCES CO LLC | Produced Fluid | 96.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21894 |
2013 | SENECA RESOURCES CO LLC | Produced Fluid | 1,972.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SENECA RESOURCES CO LLC | Produced Fluid | 15.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC012 |
2013 | SENECA RESOURCES CO LLC | Produced Fluid | 160.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC012 |
2014 | SENECA RESOURCES CO LLC | Produced Fluid | 637.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SENECA RESOURCES CO LLC | Fracing Fluid Waste | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SENECA RESOURCES CO LLC | Produced Fluid | 3.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | SENECA RESOURCES CO LLC | Produced Fluid | 58.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SENECA RESOURCES CO LLC | Produced Fluid | 90.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | SENECA RESOURCES CO LLC | Produced Fluid | 141.17 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2017 | SENECA RESOURCES CO LLC | Produced Fluid | 251.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 19.17 Bbl | REUSE (AT WELL PAD) | |
2017 | SENECA RESOURCES CO LLC | Produced Fluid | 474.26 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 245.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 18.33 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 319.18 Bbl | REUSE (AT WELL PAD) | |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 84.17 Bbl | RESIDUAL WASTE TRANSFER FACILITY | WMGR123NC039 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 149.19 Bbl | REUSE (AT WELL PAD) | |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 171.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2009852 | Primary Facility | 2011-10-11 | Routine/Complete Inspection | No Violations Noted | access road sediment runoff into state forest. viols charged to 13H |
2068849 | Primary Facility | 2012-05-16 | Follow-up Inspection | No Violations Noted | |
2073981 | Primary Facility | 2012-06-01 | Compliance Evaluation | No Violations Noted | frackin, 10 brl frack fluid release from valve under pressure |
2253288 | Primary Facility | 2014-03-11 | Incident- Response to Accident or Event | No Violations Noted | Production liquid leaked out behind separators when flange developed hole. Violations cited to escgp |
2312588 | Primary Facility | 2014-10-14 | Follow-up Inspection | No Violations Noted | Clossing violations from 11 MAR 2014, when production liquid leaked out of flow line. |
2592191 | Primary Facility | 2017-05-03 | Routine/Partial Inspection | No Violations Noted | This is an inspection of DCNR 595 Pad E.
Electrical conductivity readings w an Oakton PCSTestr 35: production tank containment--0.13 mS/cm, separator containment--0.15 mS/cm, pad--1.2 mS/cm. Onsite during this inspection were 2 Seneca workers tending to the separators. The basin down gradient of the pad (photo) is not on the plan drawing. The basin along the access road is listed as a "rain garden" on the plan. Time: ~1500-1555 hrs |
2592655 | Primary Facility | 2017-05-03 | Routine/Partial Inspection | No Violations Noted | This is an inspection of DCNR 595 Pad E.
Electrical conductivity readings w an Oakton PCSTestr 35: production tank containment--0.13 mS/cm, separator containment--0.15 mS/cm, pad--1.2 mS/cm. Onsite during this inspection were 2 Seneca workers tending to the separators. The basin down gradient of the pad (photo) is not on the plan drawing. The basin along the access road (photo) is listed as a "rain garden" on the plan. Time: ~1500-1555 hrs |
2820636 | Primary Facility | 2018-12-28 | Site Restoration | No Violations Noted | This inspection covers DCNR 595 Pad E (not Pads C & G).
NOT denied. Slopes around the pad are temporarily stabilized with hydroseed and sparse vegetation (photo 2). Filter sock (photo 1) is considered a temporary E & S control and hydro seed temporary stabilization; ESCGP termination requires "permanent stabilization", and removal of temporary E & S controls. I took electrical conductivity readings from pooled water on site with an Oakton PCSTestr 35. A puddle near the production tanks returned 0.17 mS/cm. Air temp: 45F JLP |
For data sources see[8]