X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-21443

Well Details

Well ID: 37-117-21443
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Bloss Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 148211
Farm/Lease Name: DCNR 595 35H 50296
License Status:
Spud Date:
Permit Date: 2012-01-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.6714
Longitude: -77.107592

For data sources see[1][2][3]

Well History

Date Event
2012-01-26 New Permit Application
2012-04-24 Performed Spud Operation
2012-07-22 Drilling Completion
2014-06-03 Perforation
2015-01-28 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-08 2014-06-14 7,951 5,226,270 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AL-7NR Trican Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00001179 0
FR-15 Trican Friction Reducer Proprietary Amide Proprietary 2.5 0.00231206 0
Distillates (petroleum), Hydrotreated Light 64742-47-8 25 0.0231206 0
Proppant 30/50 Ottawa Trican Proppant Crystalline silica (quartz) 14808-60-7 100 5.46857 0
MBC 516 Trican Biocide Ethanol 64-17-5 2.8 0.00027637 0
Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.00081924 0
N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00054287 0
Glutaraldehyde 111-30-8 27 0.00266498 0
Water Seneca Resources Carrier/Base Fluid Water 7732-18-5 100 88.0438 0
FEAC 20 Trican Iron Control Citric acid 77-92-9 30 0.00025047 0
Acetic acid 64-19-7 50 0.00041745 0
Proppant 80/100 Oklahoma Trican Proppant Silica 14808-60-7 100 0.850238 0
Proppant 40/70 Ottawa Trican Proppant Crystalline silica (quartz) 14808-60-7 100 5.55761 0
7.5% HydroChloric Acid Trican Acid Hydrochloric Acid HCl 7647-01-0 7.5 0.0411464 0
Sl-7 Trican Scale Inhibitor Ethylene glycol 107-21-1 30 0.00819816 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2012 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2013 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2014 SENECA RESOURCES CO LLC 192,726.90 124 0.00 0 0.00 0
2015 SENECA RESOURCES CO LLC 552,942.75 185 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 785,079.60 359 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 625,574.55 338 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 508,013.04 365 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 393,319.68 345 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 SENECA RESOURCES CO LLC Drill Cuttings 1,873.41 Tons LANDFILL 301358
2014 SENECA RESOURCES CO LLC Produced Fluid 3,635.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 SENECA RESOURCES CO LLC Produced Fluid 1,037.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SENECA RESOURCES CO LLC Produced Fluid 4,499.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 SENECA RESOURCES CO LLC Fracing Fluid Waste 80.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 SENECA RESOURCES CO LLC Produced Fluid 144.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 SENECA RESOURCES CO LLC Produced Fluid 2,394.92 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Produced Fluid 581.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SENECA RESOURCES CO LLC Produced Fluid 18.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2017 SENECA RESOURCES CO LLC Produced Fluid 566.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 514.26 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 426.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 27.50 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 420.02 Bbl REUSE (AT WELL PAD)
2019 SENECA RESOURCES CO LLC Produced Fluid 100.84 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 SENECA RESOURCES CO LLC Produced Fluid 117.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 21.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003
2019 SENECA RESOURCES CO LLC Produced Fluid 230.84 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2082812 Primary Facility 2012-07-12 Drilling/Alteration No Violations Noted
2115518 Primary Facility 2012-11-14 Routine/Complete Inspection No Violations Noted 34H & 35H drilled, 33H, 89H, 74H, 75 conductor only. Cleaning matts today.
2256866 Primary Facility 2014-03-26 Drilling/Alteration No Violations Noted
2264696 Primary Facility 2014-04-16 Drilling/Alteration No Violations Noted
2280789 Primary Facility 2014-06-23 Routine/Complete Inspection No Violations Noted
2349803 Primary Facility 2015-03-06 Routine/Partial Inspection No Violations Noted 6 Marcellus Shale natural gas wells in production.
2594814 Primary Facility 2017-05-11 Routine/Complete Inspection No Violations Noted Six Wells in production phase. Six water separators are located within containment. No leaks detected from production equipment. The wellsite restoration report is not on file for the site. Site not restored. No active drilling permits for the DCNR 595 L at the time of inspection.
2833048 Primary Facility 2019-01-29 Routine/Partial Inspection No Violations Noted I did not take electrical conductivity readings, because all the water is frozen.

Air temp 24F, snowing. JLP

For data sources see[8]

References