If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-21498 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.619111,"lon":-76.935908,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Union Township | |
Operator Name: ROCKDALE MARCELLUS LLC | |
Well Pad ID: 148892 | |
Farm/Lease Name: MILLER E 116W 2H | |
License Status: Active | |
Spud Date: 2012-05-04 | |
Permit Date: 2012-04-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.619111 | |
Longitude: -76.935908 |
Date | Event |
---|---|
2012-04-08 | Performed Stage 3 of Stimulation |
2012-04-09 | Performed Stage 4 of Stimulation |
2012-04-23 | New Permit Application |
2012-09-02 | Performed Spud Operation |
2012-09-20 | Drilling Completion |
2013-02-13 | Perforation |
2013-04-05 | Performed Stage 1 of Stimulation |
2013-04-06 | Perforation |
2013-04-07 | Perforation |
2013-04-07 | Performed Stage 2 of Stimulation |
2013-04-08 | Perforation |
2013-04-09 | Perforation |
2013-04-09 | Performed Stage 5 of Stimulation |
2013-04-10 | Perforation |
2013-04-10 | Performed Stage 6 of Stimulation |
2013-04-10 | Performed Stage 7 of Stimulation |
2013-04-12 | Perforation |
2013-04-12 | Performed Stage 8 of Stimulation |
2013-04-13 | Performed Stage 9 of Stimulation |
2013-04-14 | Perforation |
2013-04-16 | Performed Stage 10 of Stimulation |
2013-04-17 | Perforation |
2013-04-17 | Performed Stage 11 of Stimulation |
2013-04-18 | Perforation |
2013-04-18 | Performed Stage 12 of Stimulation |
2013-04-19 | Perforation |
2013-04-19 | Performed Stage 13 of Stimulation |
2013-04-20 | Performed Stage 14 of Stimulation |
2013-04-21 | Perforation |
2013-04-21 | Performed Stage 15 of Stimulation |
2013-04-22 | Perforation |
2013-04-22 | Performed Stage 16 of Stimulation |
2013-04-23 | Perforation |
2013-04-23 | Performed Stage 17 of Stimulation |
2013-04-24 | Perforation |
2013-04-24 | Performed Stage 18 of Stimulation |
2013-04-25 | Performed Stage 19 of Stimulation |
2018-08-29 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-04-13 | 2013-04-28 | 1 | 5,433,960 | 307,272 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Petro-Flo | Bio-Cide International, Inc | Biocide | Sodium Chlorite | 7758-19-2 | 8.35 | 0.0034829 | 1823 |
Sodium Carbonate | 497-19-8 | 2 | 0.000834904 | 437 | ||||
Sodium Hydroxide | 1310-73-2 | 1 | 0.000416497 | 218 | ||||
Sodium Chloride | 7647-14-5 | 1 | 0.000416497 | 218 | ||||
Water | Operator | Base Carrier Fluid | Water | 7732-18-5 | 100 | 86.584 | 45,319,200.0 | |
15% Hydrochloric Acid | Reagent | Scale Dissolver | 36% Hydrochloric Acid | 7647-01-0 | 15 | 0.0732193 | 38324 | |
Water | 7732-18-5 | 85 | 0.414909 | 217169 | ||||
Plexgel 907 | Chemplex, L.C. | Gellant | Guar Gum | 9000-30-0 | 100 | 0.0196785 | 10300 | |
FR900 | Nalco | Friction Reducer | Proprietary | Proprietary | 100 | 0.0829172 | 43400 | |
EDTA-ACID | Univar | Iron Control | Ethylenediaminetetraacetic acid | 60-00-4 | 99 | 0.00220476 | 1154 | |
Water | 7732-18-5 | 1 | 0.00002293 | 12 | ||||
Plexgel Breaker 10L | Chemplex, L.C. | Breaker | No Hazardous Ingredients | Proprietary | 100 | 0.000175769 | 92 | |
Sand | Operator | Proppant | Silicon Dioxide | 14808-60-7 | 100 | 12.7705 | 6,684,240.0 | |
FE-4 | Chemplex, L.C. | Iron Control Additive | Water | 7732-18-5 | 55 | 0.00089222 | 467 | |
Citric Acid Anhydrous | 77-92-9 | 55 | 0.00089222 | 467 | ||||
I-22 | Nalco | Corrosion Inhibitor | Aromatic aldehyde | Proprietary | 30 | 0.000145201 | 76 | |
Methanol | 67-56-1 | 5 | 0.00002484 | 13 | ||||
Cyclic alkanes | Proprietary | 5 | 0.00002484 | 13 | ||||
Quaternary ammonium compound | Proprietary | 5 | 0.00002484 | 13 | ||||
2-Mercaptoethyl Alcohol | 60-24-2 | 5 | 0.00002484 | 13 | ||||
Oxyalkylated Fatty Acid Derivative | Proprietary | 30 | 0.000145201 | 76 | ||||
Formic Acid | 64-18-6 | 60 | 0.000292312 | 153 | ||||
Quaternary ammonium compound | Proprietary | 30 | 0.000145201 | 76 | ||||
Isopropanol | 67-63-0 | 10 | 0.00004776 | 25 | ||||
MSI-7 | National Petrochem | Scale Inhibitor | Hydrogen Chloride | 7647-01-0 | 100 | 0.00862415 | 4514 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-04-05 | 1 | 0 | 8,983 | 0 | |
2013-04-07 | 2 | Sand, Bulk Sand | 0 | 8,581 | 0 |
2012-04-08 | 3 | Sand, Bulk Sand | 0 | 8,994 | 0 |
2012-04-09 | 4 | Bulk Sand, Sand | 0 | 9,000 | 0 |
2013-04-09 | 5 | Sand, Bulk Sand | 0 | 8,420 | 0 |
2013-04-10 | 6 | Bulk Sand, Sand | 0 | 8,760 | 0 |
2013-04-10 | 7 | Bulk Sand, Sand | 0 | 8,859 | 0 |
2013-04-12 | 8 | Bulk Sand, Sand | 0 | 8,918 | 0 |
2013-04-13 | 9 | Bulk Sand, Sand | 0 | 8,944 | 0 |
2013-04-16 | 10 | Bulk Sand, Sand | 0 | 8,629 | 0 |
2013-04-17 | 11 | Sand, Bulk Sand | 0 | 8,453 | 0 |
2013-04-18 | 12 | Sand, Bulk Sand | 0 | 8,460 | 0 |
2013-04-19 | 13 | Sand, Bulk Sand | 0 | 8,470 | 0 |
2013-04-20 | 14 | Bulk Sand, Sand | 0 | 8,821 | 0 |
2013-04-21 | 15 | Sand, Bulk Sand | 0 | 8,620 | 0 |
2013-04-22 | 16 | Sand, Bulk Sand | 0 | 8,730 | 0 |
2013-04-23 | 17 | Bulk Sand, Sand | 0 | 8,665 | 0 |
2013-04-24 | 18 | Sand, Bulk Sand | 0 | 8,193 | 0 |
2013-04-25 | 19 | Bulk Sand, Sand | 0 | 8,820 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 775,819.76 | 170 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 795,838.78 | 329 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 556,193.60 | 327 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 421,289.27 | 337 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 306,296.23 | 266 | 0.00 | 0 | 0.00 | 0 |
2018 | ROCKDALE MARCELLUS LLC | 215,896.59 | 304 | 0.00 | 0 | 0.00 | 0 |
2019 | ROCKDALE MARCELLUS LLC | 234,161.88 | 306 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SWEPI LP | Drill Cuttings | 45.95 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | SWEPI LP | Fracing Fluid Waste | 27.98 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC006 |
2012 | SWEPI LP | Produced Fluid | 22.62 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | SWEPI LP | Produced Fluid | 37.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Fracing Fluid Waste | 238.99 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | SWEPI LP | Fracing Fluid Waste | 147.92 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Drilling Fluid Waste | 204.24 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | SWEPI LP | Drilling Fluid Waste | 7.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC006 |
2013 | SWEPI LP | Produced Fluid | 3,411.81 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Fracing Fluid Waste | 11,686.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Fracing Fluid Waste | 1.07 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 7-3115-00193 |
2013 | SWEPI LP | Produced Fluid | 48.16 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Drill Cuttings | 142.33 Tons | LANDFILL | 301358 |
2013 | SWEPI LP | Fracing Fluid Waste | 2.78 Bbl | RESIDUAL WASTE TRANSFER FACILITY | PAD987266749 |
2013 | SWEPI LP | Spent Lubricant | 3.75 Bbl | RESIDUAL WASTE TRANSFER FACILITY | PAD987266749 |
2013 | SWEPI LP | Fracing Fluid Waste | 354.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Drilling Fluid Waste | 13.39 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Drilling Fluid Waste | 64.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Fracing Fluid Waste | 4.87 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC006 |
2014 | SWEPI LP | Produced Fluid | 4,832.36 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Produced Fluid | 132.05 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | SWEPI LP | Produced Fluid | 822.45 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2014 | SWEPI LP | Fracing Fluid Waste | 12.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Produced Fluid | 13.76 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SWEPI LP | Produced Fluid | 25.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC011 |
2015 | SWEPI LP | Produced Fluid | 12.79 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | SWEPI LP | Fracing Fluid Waste | 60.62 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SWEPI LP | Produced Fluid | 1,498.62 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | SWEPI LP | Produced Fluid | 1,960.43 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWEPI LP | Soil Contaminated by Oil & Gas Related Spills | 0.10 Tons | LANDFILL | 301358 |
2016 | SWEPI LP | Produced Fluid | 2,039.58 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWEPI LP | Soil Contaminated by Oil | 0.10 Tons | LANDFILL | 301358 |
2016 | SWEPI LP | Produced Fluid | 102.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | SWEPI LP | Synthetic Liner Materials | 0.12 Tons | LANDFILL | 301358 |
2016 | SWEPI LP | Produced Fluid | 300.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2017 | SWEPI LP | Synthetic Liner Materials | 0.54 Tons | LANDFILL | 301358 |
2017 | SWEPI LP | Produced Fluid | 287.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2017 | SWEPI LP | Produced Fluid | 1,536.57 Bbl | REUSE (AT WELL PAD) | |
2017 | SWEPI LP | Produced Fluid | 20.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | SWEPI LP | Waste Water Treatment Sludge | 4.52 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid | 256.95 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ROCKDALE MARCELLUS LLC | Synthetic Liner Materials | 1.83 Tons | LANDFILL | 301358 |
2018 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes | 22.00 Bbl | REUSE (AT WELL PAD) | |
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid | 0.65 Tons | LANDFILL | 301358 |
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid | 932.20 Bbl | REUSE (AT WELL PAD) | |
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid | 413.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | ROCKDALE MARCELLUS LLC | Synthetic Liner Materials | 1.74 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid | 142.71 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC036 |
2019 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes | 15.71 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC036 |
2019 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes | 102.60 Bbl | REUSE (AT WELL PAD) | |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid | 775.56 Bbl | REUSE (AT WELL PAD) | |
2019 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil | 0.07 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Waste Water Treatment Sludge | 4.38 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil & Gas Related Spills | 0.07 Tons | LANDFILL | 301358 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2123724 | Primary Facility | 2012-12-13 | Routine/Complete Inspection | No Violations Noted | |
2135742 | Primary Facility | 2013-02-01 | Routine/Complete Inspection | No Violations Noted | |
2137095 | Primary Facility | 2013-02-04 | Routine/Complete Inspection | Violation(s) Noted | 63 gallon (reported) of produced water spilled to the pad not been completely cleaned up. 2H cited. sw-IR 2141499 confirms violations have been corrected. |
2139963 | Primary Facility | 2013-02-12 | Routine/Complete Inspection | No Violations Noted | |
2141499 | Primary Facility | 2013-02-19 | Routine/Complete Inspection | No Violations Noted | previous violations (from a brine spill) 2/4/13 closed. No Vio |
2165967 | Primary Facility | 2013-05-10 | Routine/Partial Inspection | No Violations Noted | final day of fracking. 3.5-4.5 mS/cm on pads |
2170234 | Primary Facility | 2013-05-28 | Routine/Complete Inspection | No Violations Noted | |
2197037 | Primary Facility | 2013-08-19 | Compliance Evaluation | No Violations Noted | 100 gal antifreeze spill reported |
2228756 | Primary Facility | 2013-12-11 | Routine/Complete Inspection | No Violations Noted | |
2431312 | Primary Facility | 2015-12-08 | Site Restoration | No Violations Noted | |
2433290 | Primary Facility | 2015-12-16 | Routine/Complete Inspection | No Violations Noted | |
2462820 | Primary Facility | 2016-03-09 | Incident- Response to Accident or Event | No Violations Noted | Inspection conducted in response to report of spill (Complain ID No. 318215). As reported by Shell, approximately 100 barrels of produced water leaked from a tank into the secondary containment. The spilled fluid was removed, and Shell plans to have the rest of the tank emptied and then repaired. I arrived at 13:00; no personell onsite. The area around the produced water tanks was inspected. No evidence of leakage to the pad surface was observed.
No violations were cited during this inspection. |
2545974 | Primary Facility | 2016-12-19 | Routine/Complete Inspection | No Violations Noted | |
2555028 | Primary Facility | 2017-01-25 | Routine/Complete Inspection | No Violations Noted | Routine inspection to assess overall site conditions. No Shell Representatives were present.
Approximately 4 inches of snow cover on site. Electrical conductivity of puddles on the pad surface ranged from 325 to 570 uS/cm. Due to snow cover, the vegetative cover on iste was not visible. No evidence of accelerated erosion or sedimentation was observed. No violations were cited during this inspection |
2853534 | Primary Facility | 2019-03-13 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess overall site conditions. Seven wells are staged for production. The wells have well tags which say Shell Appalachia instead of Rockdale. The Department recommends replacing the well tags. Some bubbling was observed coming from a green pipe attached to the well head of the 5H well.
Seven GPUs are present and appear to be in good condition overall. Two steel double-walled produced water tanks are present, labeled, and are in good condition. One white plastic produced water tank is present within steel containment with plastic lining. A methanol tote was also present within the containment. Two infiltration basins are present to the west of the pad. Significant accelerated erosion is present downstream of the outlet pipe on the northwest infiltration basin. No other E&S issues noted. No violations noted. |
2856248 | Primary Facility | 2019-03-14 | Routine/Complete Inspection | No Violations Noted | Weather was 28 degrees and cloudy. There were no Rockdale Marcellus representatives on location at time of inspection. Well was in production. Well had digital pressure monitoring equipment that had no read out. Well had 3 annulus vents plumbed to surface, 2', 1' and 3/4'. 100% LEL and 100% methane was detected on the 2' vent at time of inspection. 0% combustable gas was detected on the other 2 vents or in any area around the well at time of inspection. No violations noted at time of inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2137095 | 660021 | 02/04/2013 | 2013-02-04 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | 63 gallon (reported) of produced water spilled to the pad not been completely cleaned up. 2H cited |
2137095 | 660022 | 02/04/2013 | 2013-02-04 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | 63 gallon (reported) of produced water spilled to the pad not been completely cleaned up. 2H cited |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
660021 | 293742 | NOV - Notice of Violation | Comply/Closed | 2013-02-19 | |||
660022 | 293742 | NOV - Notice of Violation | Comply/Closed | 2013-02-19 |
For data sources see[9]