If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-21701 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.772372,"lon":-77.03775,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Richmond Township | |
Operator Name: SWEPI LP | |
Well Pad ID: 151094 | |
Farm/Lease Name: SHUGHART 534 1H | |
License Status: Active | |
Spud Date: 2014-08-12 | |
Permit Date: 2014-05-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.772372 | |
Longitude: -77.037750 |
Date | Event |
---|---|
2014-05-02 | New Permit Application |
2014-08-12 | Performed Spud Operation |
2015-06-22 | New Permit Application |
2015-11-16 | Drilling Completion |
2015-11-28 | Perforation |
2015-12-01 | Perforation |
2015-12-01 | Performed Stage 1 of Stimulation |
2015-12-02 | Perforation |
2015-12-02 | Performed Stage 2 of Stimulation |
2015-12-03 | Perforation |
2015-12-03 | Performed Stage 3 of Stimulation |
2015-12-04 | Perforation |
2015-12-04 | Performed Stage 4 of Stimulation |
2015-12-05 | Perforation |
2015-12-05 | Performed Stage 5 of Stimulation |
2015-12-06 | Perforation |
2015-12-06 | Performed Stage 6 of Stimulation |
2015-12-06 | Performed Stage 7 of Stimulation |
2015-12-07 | Perforation |
2015-12-07 | Performed Stage 8 of Stimulation |
2015-12-08 | Perforation |
2015-12-08 | Performed Stage 9 of Stimulation |
2015-12-09 | Perforation |
2015-12-09 | Performed Stage 10 of Stimulation |
2015-12-10 | Perforation |
2015-12-10 | Performed Stage 11 of Stimulation |
2015-12-11 | Perforation |
2015-12-11 | Performed Stage 12 of Stimulation |
2015-12-11 | Performed Stage 13 of Stimulation |
2015-12-12 | Perforation |
2015-12-12 | Performed Stage 14 of Stimulation |
2015-12-12 | Performed Stage 15 of Stimulation |
2015-12-13 | Perforation |
2015-12-13 | Performed Stage 16 of Stimulation |
2015-12-14 | Perforation |
2015-12-14 | Performed Stage 17 of Stimulation |
2015-12-14 | Performed Stage 18 of Stimulation |
2015-12-15 | Perforation |
2015-12-15 | Performed Stage 19 of Stimulation |
2015-12-15 | Performed Stage 20 of Stimulation |
2015-12-16 | Perforation |
2015-12-16 | Performed Stage 21 of Stimulation |
2015-12-17 | Perforation |
2015-12-17 | Performed Stage 22 of Stimulation |
2015-12-17 | Performed Stage 23 of Stimulation |
2015-12-18 | Perforation |
2015-12-18 | Performed Stage 24 of Stimulation |
2015-12-18 | Performed Stage 25 of Stimulation |
2015-12-19 | Perforation |
2015-12-19 | Performed Stage 26 of Stimulation |
2015-12-19 | Performed Stage 27 of Stimulation |
2015-12-20 | Perforation |
2015-12-20 | Performed Stage 28 of Stimulation |
2015-12-20 | Performed Stage 29 of Stimulation |
2015-12-21 | Performed Stage 30 of Stimulation |
2016-07-11 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-12-01 | 2015-12-21 | 5,695 | 6,641,540 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00427 | 2897.98 |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00747 | 5073.54 | ||||
WFRC-2100 | U.S. Well Services | Friction Reducer | Alcohol Ethoxylate | 68551-12-2 | 2 | 0.0013 | 880.37 | |
Alkanolamide | 93-83-4 | 2 | 0.0013 | 880.37 | ||||
Copolymer of 2-Propenamide | 69418-26-4 | 30 | 0.00233 | 1583.4 | ||||
Hydrotreated Petroleum Distillates | 64742-47-8 | 25 | 0.0105 | 7131 | ||||
Ammonium Chloride | 12125-02-9 | 1 | 0.00099 | 673.483 | ||||
Water | Shell | Base Fluid | Water | 7732-18-5 | 100 | 81.5415 | 55,390,500.0 | |
AI-302 | U.S. Well Services | Acid Corrosion Inhibitors | Water | 7732-18-5 | 95 | 0.00105 | 713.07 | |
2-Propyn-1-olcompound with methyloxirane | 38172-91-7 | 15 | 0.00017 | 112.59 | ||||
SI-1200 | U.S. Well Services | Scale Inhibitor | Ammonium Chloride | 12125-02-9 | 2.5 | 0.00058 | 395.247 | |
Phosphonated compound | Proprietary | 15 | 0.00228 | 1549.99 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 17.826 | 12,109,000.0 | |
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.11574 | 78623.8 | |
Water | 7732-18-5 | 87.5 | 0.48455 | 329153 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-12-01 | 1 | SAND | 3,613,331 | 7,780 | 0 |
2015-12-02 | 2 | SAND | 3,613,331 | 8,147 | 0 |
2015-12-03 | 3 | SAND | 3,613,331 | 7,818 | 0 |
2015-12-04 | 4 | SAND | 3,613,331 | 8,246 | 0 |
2015-12-05 | 5 | SAND | 3,613,331 | 8,373 | 0 |
2015-12-06 | 6 | SAND | 3,613,331 | 8,308 | 0 |
2015-12-06 | 7 | SAND | 3,613,331 | 8,258 | 0 |
2015-12-07 | 8 | SAND | 3,613,331 | 7,847 | 0 |
2015-12-08 | 9 | SAND | 3,613,331 | 8,265 | 0 |
2015-12-09 | 10 | SAND | 3,613,331 | 8,272 | 0 |
2015-12-10 | 11 | SAND | 3,613,331 | 8,659 | 0 |
2015-12-11 | 12 | SAND | 3,613,331 | 8,358 | 0 |
2015-12-11 | 13 | SAND | 3,613,331 | 8,172 | 0 |
2015-12-12 | 14 | SAND | 3,613,331 | 8,519 | 0 |
2015-12-12 | 15 | SAND | 3,613,331 | 8,291 | 0 |
2015-12-13 | 16 | SAND | 3,613,331 | 8,438 | 0 |
2015-12-14 | 17 | SAND | 3,613,331 | 8,303 | 0 |
2015-12-14 | 18 | SAND | 3,613,331 | 8,392 | 0 |
2015-12-15 | 19 | SAND | 3,613,331 | 8,070 | 0 |
2015-12-15 | 20 | SAND | 3,613,331 | 8,198 | 0 |
2015-12-16 | 21 | SAND | 3,613,331 | 8,141 | 0 |
2015-12-17 | 22 | SAND | 3,613,331 | 6,892 | 0 |
2015-12-17 | 23 | SAND | 3,613,331 | 8,247 | 0 |
2015-12-18 | 24 | SAND | 3,613,331 | 7,927 | 0 |
2015-12-18 | 25 | SAND | 3,613,331 | 7,755 | 0 |
2015-12-19 | 26 | SAND | 3,613,331 | 7,581 | 0 |
2015-12-19 | 27 | SAND | 3,613,331 | 7,967 | 0 |
2015-12-20 | 28 | SAND | 3,613,331 | 7,606 | 0 |
2015-12-20 | 29 | SAND | 3,613,331 | 7,144 | 0 |
2015-12-21 | 30 | SAND | 3,613,331 | 7,643 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 2,369,315.05 | 344 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 1,553,057.57 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | SWEPI LP | 1,123,619.33 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | SWEPI LP | 877,047.56 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | SWEPI LP | Fracing Fluid Waste | 334.63 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Drill Cuttings | 503.06 Tons | LANDFILL | 301358 |
2015 | SWEPI LP | Drilling Fluid Waste | 48.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SWEPI LP | Produced Fluid | 124.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SWEPI LP | Drill Cuttings | 221.85 Tons | LANDFILL | 301358 |
2015 | SWEPI LP | Drill Cuttings | 364.22 Tons | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR097R017 |
2015 | SWEPI LP | Fracing Fluid Waste | 2.18 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SWEPI LP | Fracing Fluid Waste | 119.85 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SWEPI LP | Drilling Fluid Waste | 73.34 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | SWEPI LP | Waste Water Treatment Sludge | 13.72 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | SWEPI LP | Fracturing Fluid Waste | 8,941.12 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWEPI LP | Produced Fluid | 633.27 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | SWEPI LP | Produced Fluid | 933.24 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC011 |
2016 | SWEPI LP | Produced Fluid | 113.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | SWEPI LP | Produced Fluid | 3,129.70 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | SWEPI LP | Produced Fluid | 35.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | SWEPI LP | Waste Water Treatment Sludge | 8.24 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | SWEPI LP | Produced Fluid | 701.66 Bbl | REUSE (AT WELL PAD) | |
2017 | SWEPI LP | Produced Fluid | 226.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2018 | SWEPI LP | Produced Fluid | 367.67 Bbl | REUSE (AT WELL PAD) | |
2018 | SWEPI LP | Produced Fluid | 233.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2018 | SWEPI LP | Produced Fluid | 79.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | SWEPI LP | Produced Fluid | 250.65 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2275145 | Primary Facility | 2014-05-27 | Routine/Partial Inspection | No Violations Noted | Preconstruction meeting. TLT |
2294626 | Primary Facility | 2014-08-11 | Preoperation Inspection | No Violations Noted | Preoperational inspection. Perimeter controls installed and site construction nearly complete. TLT |
2294738 | Primary Facility | 2014-08-13 | Drilling/Alteration | No Violations Noted | |
2334551 | Primary Facility | 2015-01-07 | Routine/Complete Inspection | No Violations Noted | |
2353540 | Primary Facility | 2015-03-18 | Routine/Complete Inspection | No Violations Noted | |
2530605 | Primary Facility | 2016-10-20 | Routine/Partial Inspection | No Violations Noted | 3 Marcellus Shale wells producing natural gas. Highest EC of puddle on pad 1.1 mS/cm today |
2569247 | Primary Facility | 2017-03-08 | Routine/Partial Inspection | No Violations Noted | 2 electrical conductivity readings w/ a PCSTestr 35:
inside wheelie trailer containment--0.27 mS/cm puddle on pad--0.36 mS/cm Air temp: 49 |
2569249 | Primary Facility | 2017-03-08 | Routine/Partial Inspection | No Violations Noted | 2 electrical conductivity readings w/ a PCSTestr 35:
inside wheelie trailer containment--0.27 mS/cm puddle on pad--0.36 mS/cm Air temp: 49 |
2625828 | Primary Facility | 2017-08-10 | Site Restoration | No Violations Noted | EC of puddle on pad w Oakton PCSTestr 35: 1.5 mS/cm |
2644714 | Primary Facility | 2017-09-29 | Site Restoration | No Violations Noted | No electrical conductivity readings obtained because I did not see any standing liquid on site. JLP |
2836496 | Primary Facility | 2019-02-06 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a routine inspection of SWEPI's Shughart 534 Well Pad in Richmond Twp, Tioga County on 2/6/2019 at 1320 hours. The weather was cloudy with rain and 36 degrees. The E&S Plan was found in the mailbox by the site entrance sign. The onsite inspection log was found in the mailbox by the production tank. Last self-inspection was conducted on 2/5/2019 and noted no issues.
There are currently three wells (1H, 3H & 5H) producing onsite. All fluids field measured on the pad surface and in PCSM BMPs were within normal conductivity ranges. All PCSM BMPs were in place and functioning. The pad remains well vegetated and stabilized. No erosion issues were observed. The water bars along the steep portions of the access road are holding up well. No violations noted today, I departed the site at 1355. |
For data sources see[9]