Well Details

Well ID: 37-117-21813
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Westfield Township
Operator Name: ECLIPSE RESOURCES PA LP
Well Pad ID: 153057
Farm/Lease Name: PAINTER 1H
License Status:
Spud Date: 2015-12-15
Permit Date: 2015-10-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.906750
Longitude: -77.506025

For data sources see[1][2][3]

Well History

Date Event
Deviated
2015-10-22 New Permit Application
2015-12-15 Performed Spud Operation
2016-02-02 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-12-06 2017-01-05 10,946 19,378,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor, Scale Hib A21 Nalco Champion Scale Inhibitor Ethylene Glycol 107-21-1 3 0.000364535 660.819
Sodium Phosphate, Tribasic 7601-54-9 3 0.000364535 660.819
Amine Triphosphate Proprietary 20 0.00243023 4405.46
K-BAC 1005 Water Science Technologies Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.5 0.000229074 415.259
Water 7732-18-5 44.3 0.00184845 3350.81
Polyethylene glycol 25322-68-3 50 0.00208628 3781.95
Water Travis Peak Carrier/Base Fluid Water 7732-18-5 100 89.2074 161,713,000.0
Sand (Proppant) Unimin Proppant Silica Substrate 14808-60-7 100 10.6335 19,276,100.0
AQUCAR Biocide Dow Chemical Biocide Ethanol 64-17-5 0.3 0.00003485 63.177
Glutaraldehyde 111-30-8 14 0.00162638 2948.25
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 2.5 0.000290424 526.473
Water 7732-18-5 83 0.00964209 17478.9
Other Chemical(s) Listed Above See Trade Name(s) List Sodium Phosphate, Tribasic 7601-54-9 3 0.000364535 660.819
Water 7732-18-5 44.3 0.00184845 3350.81
Acetophenone 98-86-2 1 0.00000328 5.945
Methanol 67-56-1 5 0.00001640 29.725
Formaldehyde 50-00-0 1 0.00000328 5.945
Alcohols, ethoxylated 68439-50-9 5 0.004629 8391.33
Alcohols, ethoxylated 68002-97-1 5 0.004629 8391.33
Ethoxylated alcohol 68002-97-1 35 0.000114784 208.078
Water 7732-18-5 85 0.0324892 58895.5
Thiourea 62-56-6 1 0.00000328 5.945
Ethanol 64-17-5 0.3 0.00003485 63.177
Polyethylene glycol 25322-68-3 50 0.00208628 3781.95
Ammonium acetate 631-61-8 13 0.0120354 21817.4
Alcohols, ethoxylated 68551-12-2 5 0.004629 8391.33
Water 7732-18-5 83 0.00964209 17478.9
Ethylene Glycol 107-21-1 3 0.000364535 660.819
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 2.5 0.000290424 526.473
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Ammonium acetate 631-61-8 13 0.0120354 21817.4
Alcohols, ethoxylated 68002-97-1 5 0.004629 8391.33
Alcohols, ethoxylated 68439-50-9 5 0.004629 8391.33
Petroleum distillates, hydrotreated light 64742-47-8 30 0.027774 50348
Alcohols, ethoxylated 68551-12-2 5 0.004629 8391.33
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Methanol 67-56-1 5 0.00001640 29.725
Formaldehyde 50-00-0 1 0.00000328 5.945
Ethoxylated alcohol 68002-97-1 35 0.000114784 208.078
Thiourea 62-56-6 1 0.00000328 5.945
Short Chained Glycol Ether 112-34-5 60 0.000196773 356.705
Acetophenone 98-86-2 1 0.00000328 5.945
15% Hydrochloric Acid PVS Acidizing Water 7732-18-5 85 0.0324892 58895.5
Hydrochloric Acid 7647-01-0 15 0.00573339 10393.3
AP Breaker PVS Gel Breaker Ammonium Persulfate 7727-54-0 100 0.00000055 1
Gelling Agent, Unigel 5F Chemplex Viscosifier Guar Gum 9000-30-0 100 0.00005516 100

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 TRAVIS PEAK RESOURCES LLC 0.00 0 0.00 0 0.00 0
2016 TRAVIS PEAK RESOURCES LLC 0.00 0 0.00 0 0.00 0
2017 TRAVIS PEAK RESOURCES LLC 3,007,151.00 306 0.00 0 0.00 0
2018 ECLIPSE RESOURCES PA LP 1,169,238.26 263 0.00 0 0.00 0
2019 ECLIPSE RESOURCES PA LP 745,603.37 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 TRAVIS PEAK RESOURCES LLC Other Oil & Gas Wastes 2,728.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 TRAVIS PEAK RESOURCES LLC Drilling Fluid Waste 1,243.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 TRAVIS PEAK RESOURCES LLC Produced Fluid 23,400.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 TRAVIS PEAK RESOURCES LLC Other Oil & Gas Wastes 1,044.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 TRAVIS PEAK RESOURCES LLC Other Oil & Gas Wastes 16.27 Tons LANDFILL 100955
2017 TRAVIS PEAK RESOURCES LLC Other Oil & Gas Wastes 52.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 TRAVIS PEAK RESOURCES LLC Waste Water Treatment Sludge 88.95 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 TRAVIS PEAK RESOURCES LLC Synthetic Liner Materials 8.10 Tons BENEFICIAL REUSE – PERMIT BY RULE
2017 TRAVIS PEAK RESOURCES LLC Produced Fluid 20,670.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 TRAVIS PEAK RESOURCES LLC Filter Socks 0.61 Tons LANDFILL 100113
2017 TRAVIS PEAK RESOURCES LLC Synthetic Liner Materials 8.10 Tons
2017 TRAVIS PEAK RESOURCES LLC Synthetic Liner Materials 13.39 Tons LANDFILL 100955
2017 TRAVIS PEAK RESOURCES LLC Other Oil & Gas Wastes 537.00 Bbl REUSE (AT WELL PAD)
2017 TRAVIS PEAK RESOURCES LLC Produced Fluid 52,045.00 Bbl REUSE (AT WELL PAD)
2018 ECLIPSE RESOURCES PA LP Produced Fluid 2,980.00 Bbl REUSE (AT WELL PAD)
2018 ECLIPSE RESOURCES PA LP Produced Fluid 192.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ECLIPSE RESOURCES PA LP Other Oil & Gas Wastes 120.00 Bbl REUSE (AT WELL PAD)
2018 ECLIPSE RESOURCES PA LP Drilling Fluid Waste 2.14 Bbl RESIDUAL WASTE PROCESSING FACILITY 301280
2018 ECLIPSE RESOURCES PA LP Produced Fluid 2,768.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ECLIPSE RESOURCES PA LP Other Oil & Gas Wastes 125.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ECLIPSE RESOURCES PA LP Other Oil & Gas Wastes 82.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ECLIPSE RESOURCES PA LP Produced Fluid 506.16 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 ECLIPSE RESOURCES PA LP Produced Fluid 33.87 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 ECLIPSE RESOURCES PA LP Produced Fluid 334.64 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 ECLIPSE RESOURCES PA LP Other Oil & Gas Wastes 495.00 Bbl REUSE (AT WELL PAD)
2019 ECLIPSE RESOURCES PA LP Produced Fluid 68.87 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 ECLIPSE RESOURCES PA LP Produced Fluid 3,817.23 Bbl REUSE (AT WELL PAD)
2019 ECLIPSE RESOURCES PA LP Other Oil & Gas Wastes 50.00 Bbl INJECTION DISPOSAL WELL 34-133-24189

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2426482 Primary Facility 2015-11-17 Routine/Complete Inspection No Violations Noted The Department inspected the Travis Peak Resources LLC site, the Painter Well Pad, ESX29-117-15-0023, located in Westfield Twp., Tioga Co. on 11/17/2015 @ 1230 hours. The weather was 50 degrees and sunny. The site is currently under construction. An adequate site ID sign was observed at the entrance to the access road. The well permit for API# 37-117-21813 was located in the mailbox along with the E&S plan. The receiving stream is Broughton Hollow UNT to Cowanesque River, UNT to Broughton Hollow, and UNT to Jemison Creek. The total disturbed area is listed as 28.1 acres. The last site inspection report in the mailbox was dated 11/12/2015 and was preformed after a stormwater event. The comments section stated “There’s a few CFS that has some silt trapped, we will clean out once it dries up.”
2433556 Primary Facility 2015-12-15 Preoperation Inspection No Violations Noted The Department inspected the Travis Peak Resources LLC site, the Painter Well Pad, ESX29-117-15-0023, located in Westfield Twp., Tioga Co. on 12/15/2015 @ 1030 hours. The weather was 45 degrees and overcast. An adequate site ID sign was observed at the entrance to the access road. The well permit for API# 37-117-21813 was located in the mailbox along with the E&S plan. The receiving stream is Broughton Hollow UNT to Cowanesque River, UNT to Broughton Hollow, and UNT to Jemison Creek. The total disturbed area is listed as 28.1 acres. Construction of the site is complete and the access road was receiving it's final layer of 2A stone during the inspection. The conductor pipe and well cellar was delivered to the pad during the inspection.
2436000 Primary Facility 2015-12-23 Routine/Complete Inspection No Violations Noted
2436708 Primary Facility 2015-12-30 Drilling/Alteration No Violations Noted
2445932 Primary Facility 2015-01-26 Routine/Complete Inspection No Violations Noted
2471575 Primary Facility 2016-04-05 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) inspected the Travis Peak Resources LLC – Painter Well Pad (ESX29-117-15-0023) located in Westfield Twp., Tioga Co. on 4/5/2016 @1030 hours. The weather was 25° sunny with 53% humidity, winds WNW 8 mph. A valid site ID sign was observed at the entrance to the access road. The onsite inspection log was located in the mailbox. The site was last inspected by Mr. Taylor on 4/2/2016 with no comments listed. The receiving waters is olisted as Broughton Hollow (UNT to Cowanesque River), UNT to Broughton Hollow, UNTs to Jemison Creek/WWF. Approximately 2-5 inches of snow was observed on the ground in some areas. Mike Taylor, Well Versed Oilfield and Therman Hudson, Rig Manager H&P 500 were present during the inspection. No violations are noted at this time. I departed the site @ 1230 hours.
2574162 Primary Facility 2017-03-22 Routine/Complete Inspection No Violations Noted The DEP inspected the Travis Peak Resources Painter well site in Westfield Twp. Tioga Co. on 3/22/2017. The weather is 24 degrees and sunny. Express is in the process of flowing back the 1H well. The pad surface is a mix of frozen ground and mud. Primary containment surrounding the well head appears to be folded over and creased in some areas. E&S controls appear functional. No violations noted at this time. Please contact me with any questions.
2637549 Primary Facility 2017-09-18 Routine/Complete Inspection No Violations Noted Routine complete inspection conducted on 9/18/17. 1H well has been drilled and is in production. A well permit has been issued for the 2H well. Site is permanently stabilized. Water was present in the forebay of the sediment trap. The pad surface was dry. No violations were cited. TLT
2693144 Primary Facility 2018-02-12 Routine/Complete Inspection No Violations Noted Cold/windy at time of inspection.

Annulus vents are 3/8 stainless lines marked with casing size's

2700784 Primary Facility 2018-02-27 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection conducted a routine inspection of the Eclipse Resources – Pa, LP Painter Well Pad located in Westfield Twp., Tioga Co. The weather was 50 degrees and partly sunny. Present for my inspection were Bruce Carpenter, Manager EHS and Regulatory; Alex Duranko Regulatory Specialist; Zac Subra, EHS.

Eclipse Resources recently acquired the Painter Well Pad from Travis Peak, LLC. Access to the site has been limited by the addition of a guard shack along with security personnel on the access road. The pad surface has been regraded and had extra top rock added to remediate the muddy conditions on the surface. At the time of my inspection, Eclipse was preparing to set the conduction on the 2H well. The 1H well was drilled by Travis Peak and is currently in production. Production fluids are stored in two upright tanks in containment. No evidence of staining, leaks or corrosion was noted on the tanks. Some fluid was observed in secondary containment. Mr. Carpenter stated a truck

2722057 Primary Facility 2018-04-23 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection conducted a routine inspection of the Eclipse Resources LLC –Painter Well Site located in Westfield Twp., Tioga Co. on 4/23/2018 @ 1300 hours. The weather was 65 degrees and sunny. Zachary Subra, Eclipse Resources EHS Field Rep was present onsite for the inspection.

Onsite personnel were currently in the process of “rigging down” in preparation for moving the drilling rig to another location. A large crane and multiple escort and transport vehicles were staged onsite. Components of the rig were being pressure washed on the main containment before being hauled offsite. One tank of brine was observed on the main containment leftover from drilling. The mud tanks still contained drilling mud. Those tanks were scheduled to be emptied as part of the removal process. The mud would be sent to another drilling location. Puddles on the ground surface were screened for conductivity and found to be within normal range.

No violations are noted at this time. I departed the sit

2726663 Primary Facility 2018-05-03 Routine/Complete Inspection No Violations Noted The DEP conducted an ICDNT inspection at the Eclipse Resources – Painter Well Pad on 5/3/2018 @1030 hours in response to spill #333923, reported on 5/1/2018. Zachary Subra of Eclipse Resources called to report a subcontractor had used 40 bbl of brine water, leftover from drilling , to wash down the rig mats on containment. Mr. Subra stated, due to holes in the containment an unknown quantity of the brine was released to the pad surface. Screening and excavation of impacted pad surface material commenced on Tuesday, 5/1/2018. Initial field readings of the impacted material were 80-100 mS/cm.

Upon transfer of the Painter well pad from Travis Peak, Eclipse had brought in material and regraded the pad surface to establish positive drainage away from the cellars. The NE quadrant of the pad surface was observed excavated down between 1’-2’ in some areas. Mr. Subra stated the brine infiltrated the top material, hit the compacted original surface layer, and migrated towards the well cellars. Material was stockpiled

2734033 Primary Facility 2018-05-24 Follow-up Inspection No Violations Noted The DEP conducted a follow-up inspection at the Eclipse Resources Painter Well Pad located in Westfield Township, Tioga County on May 24, 2018 @1030 hours. The weather was 71 degrees and sunny. Winds WNW 6mph.

Zach Subra and Alex Duranko, Eclipse Resources EHS were onsite during the inspection. Penn E&R consultants were onsite collecting confirmatory samples from two areas on the pad surface, and the forebay of the sediment trap in relation to Spill #333932 reported on 5/1/2018.

The excavated areas are still open. All rainwater coming into contact with excavated areas of the pad is pumped from the sump into rolloff containers staged on containment. Any fluid accumulating in the four bay of the sediment trap is also being pumped into separate rolloff containers staged on containment. The recovered fluid is being sent to Hydro recovery for disposal . The excavated pad material is in tarped waste containers, staged on containment, awaiting disposal approval.

Violations issued 5/3/2018 against the 2H well pe

2759034 Primary Facility 2018-07-31 Follow-up Inspection No Violations Noted The DEP conducted a routine inspection of the Eclipse Resources – Painter Well Pad located in Westfield Twp., Tioga Co. on 7/31/2018 @1215 hours. The weather was 78 degrees and cloudy. Korey Starkey, DEP Env. Trainee and Zac Subra,Eclipse Resources EHS Field Rep were present for the inspection.

Halliburton was onsite performing a frack on the 2H well (API#117-21907). Mr. Subra stated completion activities began on 7/24/2018 and he believes Haliburton will be on location for another 10 days. Due to heavy precipitation in the past week, the pad surface was very muddy with standing water in some areas. All puddles screened for conductivity were <1000µS/cm.

No violations are noted at this time. I departed the site at 1345 hours.

2790018 Primary Facility 2018-10-16 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of Eclipse Resource's Painter Well Pad in Westfield Twp, Tioga County on 10/16/2018 at 1230 hours. The weather was partly cloudy and 49 degrees.

The pad is currently under flow back operations. Onsite company personal was currently monitoring the flowback. Two production tanks and frac tanks were located onsite within secondary containment. All fluids field measured were within normal conductivity ranges.

No violations noted at this time. We departed the site at 1305 hours.

2841591 Primary Facility 2019-02-19 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) conducted a routine inspection of the Eclipse Resources - Painter Well Pad located in Westfield Twp, Tioga Co. on 2/19/2019 @1030 hours the weather was 17 degrees, winds NW @10 mph, humidity 43%. There were two wells in production on the pad. No activity was observed. Zach Subra, Eclipse Resources was present onsite for the inspection.

No violations are noted at this time. I departed the site @ 1130 hours.

For data sources see[8]