If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-21826 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.639969,"lon":-77.113194,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Bloss Township | |
Operator Name: REPSOL OIL & GAS USA LLC | |
Well Pad ID: 152881 | |
Farm/Lease Name: DCNR 594 02 205 06 | |
License Status: | |
Spud Date: 2016-03-26 | |
Permit Date: 2015-11-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.639969 | |
Longitude: -77.113194 |
Date | Event |
---|---|
Deviated | |
2015-11-18 | New Permit Application |
2016-03-26 | Performed Spud Operation |
2016-04-27 | New Permit Application |
2016-06-08 | Drilling Completion |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-09-03 | 2017-10-02 | 7,538 | 10,226,700 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SAND-PREMIUM WHITE-30/50, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
Ethylene glycol | 107-21-1 | 5 | 0.00001090 | |||||
Glutaraldehyde | 111-30-8 | 30 | 0.00006250 | |||||
Modified thiourea polymer | Proprietary | 30 | 0.000201094 | 209 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00006703 | 70 | ||||
Inorganic Salt | Proprietary | 10 | 0.00008010 | |||||
Ethoxylated alcohols | Proprietary | 30 | 0.000201094 | 209 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 17.7496 | 18,444,100.0 | ||||
Distillate, petroleum, hydrotreated, light | 64742-47-8 | 30 | 0.0002404 | |||||
Oxyalkylated alcohol | Proprietary | 5 | 0.00004010 | |||||
Olefins | Proprietary | 5 | 0.00008044 | 84 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.0128145 | 13316 | ||||
Methanol | 67-56-1 | 60 | 0.000402187 | 418 | ||||
Amine Triphosphate | Proprietary | 30 | 0.00006510 | |||||
Fatty acids, tall oil | Proprietary | 30 | 0.000201094 | 209 | ||||
Sodium phosphate, tribasic | 7601-54-9 | 5 | 0.00001090 | |||||
Substituted Alkylamine | Proprietary | 1 | 0.00000800 | |||||
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.17086 | 177546 | |
Frac Fluid Package | TightROCK Solutions | Frac Fluid Additives | Listed Below | |||||
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 82.0789 | 85,290,500.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | REPSOL OIL & GAS USA LLC | 483,380.40 | 69 | 0.00 | 0 | 0.00 | 0 |
2018 | REPSOL OIL & GAS USA LLC | 1,745,934.20 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | REPSOL OIL & GAS USA LLC | 1,153,365.60 | 319 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | REPSOL OIL & GAS USA LLC | Drill Cuttings | 1,813.94 Tons | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR097R017 |
2016 | REPSOL OIL & GAS USA LLC | Synthetic Liner Materials | 8.27 Tons | LANDFILL | 8-0728-0004/013 |
2016 | REPSOL OIL & GAS USA LLC | Drill Cuttings | 19.62 Tons | LANDFILL | 8-0728-0004/013 |
2017 | REPSOL OIL & GAS USA LLC | Synthetic Liner Materials | 17.20 Tons | LANDFILL | 8-0728-0004/013 |
2017 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil & Gas Related Spills | 0.03 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 1,012.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 3,647.66 Bbl | REUSE (AT WELL PAD) | |
2017 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil | 0.03 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 263.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 5,750.03 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 630.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 10,285.65 Bbl | REUSE (AT WELL PAD) | |
2018 | REPSOL OIL & GAS USA LLC | Synthetic Liner Materials | 1.54 Tons | LANDFILL | 8-0728-0004/013 |
2018 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 58.72 Bbl | REUSE (AT WELL PAD) | |
2018 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 126.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | REPSOL OIL & GAS USA LLC | Synthetic Liner Materials | 0.33 Tons | LANDFILL | 301358 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 1,748.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 3,430.45 Bbl | REUSE (AT WELL PAD) | |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 166.97 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 280.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 76.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 35.60 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2480678 | Primary Facility | 2016-04-05 | Routine/Complete Inspection | No Violations Noted | |
2519691 | Primary Facility | 2016-09-16 | Routine/Partial Inspection | No Violations Noted | 4 Marcellus Shale wells drilled, and a 16 million gallon water impoundment |
2631836 | Primary Facility | 2017-08-30 | Routine/Complete Inspection | No Violations Noted | I met Shaun Smith of Repsol on location. Site is being prepped for frac; 480K Dyna-Tank was in place and had been filled. Secondary containment for the tank was complete, and most of the site-wide containment was in place and bermed. Shaun stated that they should be pressure testing by Saturday. |
2632420 | Primary Facility | 2017-09-05 | Routine/Partial Inspection | No Violations Noted | I met with Company Man Sheridan Smith who expects Halliburton to be finished fracturing the 4 Marcellus wells in about 25 days.
The highest electrical conductivity reading I got from the pad surface with an Oakton PCSTestr 35 was 0.48 mS/cm. Fresh water is contained in an onsite impoundment. |
2643418 | Primary Facility | 2017-10-03 | Incident- Response to Accident or Event | No Violations Noted | I met with Glen Cerny (Ensign) on site, and he showed me the area of the pad where the diesel spill occurred 5 days ago (photo 4). We also discussed the bridge (photo 1). He said they will remove the liquid, then replace the bridge.
They plan to start drilling out plugs and flowing back the wells this week. |
2649728 | Primary Facility | 2017-10-18 | Routine/Complete Inspection | No Violations Noted | I met Tony Baker when I arrived on-site. Basic Well Services workover rig was on location, pulling tubing from the 4H well. Containments were in good condition; however, I noted on the east side of the pad, the liner was no longer running up onto the soil berm, but stopped short. Tony told me he would have it repaired. AST containment also appeared to be well maintained and sound. |
2697200 | Primary Facility | 2018-02-22 | Routine/Partial Inspection | No Violations Noted | Electrical conductivity readings taken with an Oakton PCSTestr 35. Water on the pad gave a 0.02 mS/cm reading. Air temp 33F. JLP |
For data sources see[8]