X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-21899

Well Details

Well ID: 37-117-21899
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Hamilton Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 154138
Farm/Lease Name: JOHNSON (02-135-10) K 10H
License Status:
Spud Date: 2017-04-12
Permit Date: 2017-03-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.651264
Longitude: -77.065128

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-03-20 New Permit Application
2017-04-07 Performed Spud Operation
2017-07-01 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-06 2017-10-17 8,102 4,014,770 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.879493 373160
SAND-PREMIUM WHITE-30/50, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
Fatty acids, tall oil Proprietary 30 0.000199095 85
Ethoxylated alcohols Proprietary 30 0.000199095 85
Hydrochloric acid 7647-01-0 7.5 0.065962 27987
Modified thiourea polymer Proprietary 30 0.000199095 85
Crystalline silica, quartz 14808-60-7 100 20.2042 8,572,460.0
Olefins Proprietary 5 0.00007964 36
Methanol 67-56-1 60 0.00039819 169
Propargyl alcohol 107-19-7 10 0.00006637 29
Fresh Water Operator Base Fluid Water 7732-18-5 100 78.9156 33,483,100.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 REPSOL OIL & GAS USA LLC 280,094.10 47 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 1,287,596.60 365 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 647,054.20 310 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil 0.07 Tons LANDFILL 8-0728-0004/013
2017 REPSOL OIL & GAS USA LLC Drill Cuttings 1,538.87 Tons LANDFILL 301358
2017 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 22.68 Tons LANDFILL 8-0728-0004/013
2017 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills 0.07 Tons LANDFILL 8-0728-0004/013
2017 REPSOL OIL & GAS USA LLC Produced Fluid 4,463.54 Bbl REUSE (AT WELL PAD)
2017 REPSOL OIL & GAS USA LLC Produced Fluid 43.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 REPSOL OIL & GAS USA LLC Produced Fluid 124.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 22.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 REPSOL OIL & GAS USA LLC Produced Fluid 1,839.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 21.02 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Produced Fluid 3,630.77 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 1.37 Tons LANDFILL 8-0728-0004/013
2018 REPSOL OIL & GAS USA LLC Produced Fluid 253.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 45.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 72.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Produced Fluid 20.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 REPSOL OIL & GAS USA LLC Produced Fluid 137.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 621.23 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2562152 Primary Facility 2017-02-08 Routine/Complete Inspection No Violations Noted On 2/8/17 the Department of Environmental Protection (DEP) attended a preconstruction meeting for the Johnson K (02-135) well site. Repsol, Brubacher and Larson Design representatives were present.

Larson Design developed the Erosion and Sedimentation (E&S) Control plan. The site will consist of a 400 x 500 well pad, improvement of 4,800of a private road (William B Street) and construction of 1,112of new access road. A bioretetion basin, which will also serve as a post-construction stormwater BMP, will be constructed near the northwest corner of the pad. Wetlands and two existing stream crossings are shown on the E&S plan along the private road upgrade from 12+00-19+00. The E&S plan notes that the wetlands between these stations are considered Exceptional Value (EV) wetlands. According to the E&S plan, the site drains to an unnamed tributary to Johnson Run, which is classified as a cold water fishery/migratory fishery (CWF/MF). As shown on the topographic map, the well site is located in an area that was p

2579417 Primary Facility 2017-04-04 Preoperation Inspection No Violations Noted On Monday April 3, 2017 Johnny Pazzaglia called to report a ~5 gallon diesel spill near the monitoring well above the pad. I spoke with Woodward and Curran's Jordan Rathbun at the monitoring well (photo) who said an excavator removed the affected soil and contained it yesterday, and that a truck was the source of the diesel that leaked.

Repsol plans to spud the 1st well on this pad this week. I spoke with Johnny Pazzaglia, Repsol, on the phone. He said that they are waiting for the site to dry before they work on it. They plan to mulching/ seeding the slopes next week.

2580358 Primary Facility 2017-04-07 Routine/Complete Inspection No Violations Noted
2586559 Primary Facility 2017-04-25 Incident- Response to Accident or Event No Violations Noted Pat Bower, Drilling Foreman, said Repsol is drilling the first of 5 Marcellus wells at this site, they are at a depth of about 800'.

Yesterday at 1708 hrs, Repsol called in a diesel fuel release that leaked from the saddle tank of a truck (photo). Randy Fish, Safety, showed me where the release occurred (photo). The fuel tank scraped on the access road, broke its strap, then the back of the tank scraped on the road and developed a breach on the bottom of the tank. Next they pumped out approx. 100 gallons from the 120 gallon tank. They estimate a maximum of 15-20 gallons of fuel released to the road. Bishops excavated the affected access road material, and used some absorbents, which is stored in red rolloff containers on the pad (photo). I used a MiniRAE 3000 PID to screen the area where the diesel leaked, the meter remained at 0.0 ppm the whole time. I did not observe any signs of residual fuel on site.

2596487 Primary Facility 2017-05-23 Routine/Complete Inspection No Violations Noted I arrived on-site @ 13:10 hrs. and met Pat Bauer, Repsol company man. Patterson UTI rig 805 on location; the 04 well had been completed, and Mr. Bauer informed me that they would be spudding the 06 well within the next hour. There were 2 fairly large tears partway up the containment wall in the southwest corner of the pad; Mr. Bauer said he would have them repaired ASAP. I departed @ 14:00 hrs.
2602109 Primary Facility 2017-06-08 Routine/Partial Inspection No Violations Noted I spoke with Patrick Bauer, Foreman, who said they are drilling the 4th of 5 Marcellus wells on this pad. They are drilling with water to the kickoff point. I walked around the site with Randy Fish, Safety. A puddle on the pad gave a reading of 1.3 mS/cm with an Oakton PCSTestr 35.
2602525 Primary Facility 2017-06-06 Drilling/Alteration No Violations Noted
2606933 Primary Facility 2017-06-22 Routine/Partial Inspection No Violations Noted Tory Rogers (Safety), and I walked the perimeter of the pad, taking several EC readings with an Oakton PCSTestr 35. The highest reading was 1.5 mS/cm from a puddle near the pad entrance (photo).
2621203 Primary Facility 2017-08-01 Routine/Partial Inspection No Violations Noted EC reading of puddle on pad 0.64 mS/cm with an Oakton PCSTestr 35. They moved the drill rig off site. Wooden matting and liner containment remain on the pad. Precision Pipeline is installing the gathering pipeline to this site.
2654831 Primary Facility 2017-10-27 Routine/Complete Inspection No Violations Noted I met with company man Sheridan Anderson and Dave Coxhead on-site. Frac was active; currently zipper fracing the 2H and 4H wells. Sheridan estimated that the frac would be complete by 10/29. The Dyna Tank AST containment was free of water and appeared to be in good condition. Sitewide and secondary containments were also in good condition. Some water was present in various locations on the containment and the pad surface; all showed low conductance (less than .45 mS/cm).
2659868 Primary Facility 2017-11-14 Routine/Partial Inspection No Violations Noted I spoke with Rich Cashen (Repsol) who explained that a service rig with snubbing unit (photo) is drilling out plugs from the hydraulic fracturing job of the 5 Marcellus wells on site.

I got electrical conductivity readings from 3 puddles on the pad with an Oakton PCSTestr 35; the highest was 0.90 mS/cm. JLP

2690531 Primary Facility 2018-02-02 Routine/Partial Inspection No Violations Noted No electrical conductivity readings today, because there is no standing liquid on site. Air temp: 14F. JLP
2741240 Primary Facility 2018-06-13 Routine/Partial Inspection No Violations Noted I spoke with Travis Sterling (Repsol Well Tender) who was emptying liquid from the sandtraps into the wheelie trailer on site.

I took electrical conductivity readings with an Oakton PCSTestr35. A puddle on the pad was 2.2 mS/cm (photo 1). JLP

2770308 Primary Facility 2018-09-04 Routine/Partial Inspection No Violations Noted I took electrical conductivity readings with an Oakton PCSTestr 35. A puddle on the pad near the 4H well head returned a 0.11 mS/cm reading today. JLP
2840878 Primary Facility 2019-02-15 Site Restoration No Violations Noted Repsol submitted a Well Site Restoration Report on January 28, 2019; it's accepted based on this inspection because the slopes around the pad appear stabilized by vegetation, and there is no temporary equipment on site.

I took electrical conductivity readings from pooled liquid with an Oakton PCSTEstr 35. A puddle near the production tanks returned 0.14 mS/cm. Air temp 45F, sunny. JLP

For data sources see[8]

References