If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-21907 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.906861,"lon":-77.506111,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Westfield Township | |
Operator Name: ECLIPSE RESOURCES PA LP | |
Well Pad ID: 153057 | |
Farm/Lease Name: PAINTER 2H | |
License Status: | |
Spud Date: 2018-03-21 | |
Permit Date: 2017-05-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.906861 | |
Longitude: -77.506111 |
Date | Event |
---|---|
Deviated | |
2017-05-22 | New Permit Application |
2018-02-28 | Performed Spud Operation |
2018-04-17 | Drilling Completion |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | ECLIPSE RESOURCES PA LP | 2,677,546.92 | 114 | 0.00 | 0 | 0.00 | 0 |
2019 | ECLIPSE RESOURCES PA LP | 6,454,889.01 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | ECLIPSE RESOURCES PA LP | Unused Fracturing Fluid Waste | 27.92 Tons | LANDFILL | 301358 |
2018 | ECLIPSE RESOURCES PA LP | Produced Fluid | 185.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ECLIPSE RESOURCES PA LP | Soil Contaminated by Oil & Gas Related Spills | 1,643.39 Tons | LANDFILL | 301358 |
2018 | ECLIPSE RESOURCES PA LP | Produced Fluid | 38,172.00 Bbl | REUSE (AT WELL PAD) | |
2018 | ECLIPSE RESOURCES PA LP | Produced Fluid | 145.48 Tons | LANDFILL | 301358 |
2018 | ECLIPSE RESOURCES PA LP | Drilling Fluid Waste | 321.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ECLIPSE RESOURCES PA LP | Produced Fluid | 27,477.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | ECLIPSE RESOURCES PA LP | Other Oil & Gas Wastes | 1,860.00 Bbl | REUSE (AT WELL PAD) | |
2018 | ECLIPSE RESOURCES PA LP | Synthetic Liner Materials | 8.77 Tons | ||
2018 | ECLIPSE RESOURCES PA LP | Drill Cuttings | 2,519.46 Tons | LANDFILL | 301358 |
2018 | ECLIPSE RESOURCES PA LP | Synthetic Liner Materials | 8.77 Tons | BENEFICIAL REUSE – PERMIT BY RULE | |
2018 | ECLIPSE RESOURCES PA LP | Other Oil & Gas Wastes | 542.95 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | ECLIPSE RESOURCES PA LP | Synthetic Liner Materials | 105.75 Tons | LANDFILL | 301358 |
2018 | ECLIPSE RESOURCES PA LP | Soil Contaminated by Oil | 0.50 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2018 | ECLIPSE RESOURCES PA LP | Filter Socks | 0.10 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2018 | ECLIPSE RESOURCES PA LP | Soil Contaminated by Oil | 1,643.39 Tons | LANDFILL | 301358 |
2018 | ECLIPSE RESOURCES PA LP | Other Oil & Gas Wastes | 214.35 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ECLIPSE RESOURCES PA LP | Soil Contaminated by Oil & Gas Related Spills | 0.50 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2018 | ECLIPSE RESOURCES PA LP | Drilling Fluid Waste | 14,720.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | ECLIPSE RESOURCES PA LP | Produced Fluid | 371.13 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | ECLIPSE RESOURCES PA LP | Produced Fluid | 1,825.36 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC038 |
2019 | ECLIPSE RESOURCES PA LP | Produced Fluid | 2,283.84 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | ECLIPSE RESOURCES PA LP | Produced Fluid | 8,239.72 Bbl | REUSE (AT WELL PAD) | |
2019 | ECLIPSE RESOURCES PA LP | Other Oil & Gas Wastes | 495.00 Bbl | REUSE (AT WELL PAD) | |
2019 | ECLIPSE RESOURCES PA LP | Produced Fluid | 201.13 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | ECLIPSE RESOURCES PA LP | Other Oil & Gas Wastes | 50.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2574164 | Primary Facility | 2017-03-22 | Routine/Complete Inspection | No Violations Noted | The DEP inspected the Travis Peak Resources Painter well site in Westfield Twp. Tioga Co. on 3/22/2017. The weather is 24 degrees and sunny. Express is in the process of flowing back the 1H well. The pad surface is a mix of frozen ground and mud. Primary containment surrounding the well head appears to be folded over and creased in some areas. E&S controls appear functional. No violations noted at this time. Please contact me with any questions. |
2637550 | Primary Facility | 2017-09-18 | Routine/Complete Inspection | No Violations Noted | Routine complete inspection conducted on 9/18/17. 1H well has been drilled and is in production. A well permit has been issued for the 2H well. Site is permanently stabilized. Water was present in the forebay of the sediment trap. The pad surface was dry. No violations were cited. TLT |
2700790 | Primary Facility | 2018-02-27 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection conducted a routine inspection of the Eclipse Resources – Pa, LP Painter Well Pad located in Westfield Twp., Tioga Co. The weather was 50 degrees and partly sunny. Present for my inspection were Bruce Carpenter, Manager EHS and Regulatory; Alex Duranko Regulatory Specialist; Zac Subra, EHS.
Eclipse Resources recently acquired the Painter Well Pad from Travis Peak, LLC. Access to the site has been limited by the addition of a guard shack along with security personnel on the access road. The pad surface has been regraded and had extra top rock added to remediate the muddy conditions on the surface. At the time of my inspection, Eclipse was preparing to set the conduction on the 2H well. The 1H well was drilled by Travis Peak and is currently in production. Production fluids are stored in two upright tanks in containment. No evidence of staining, leaks or corrosion was noted on the tanks. Some fluid was observed in secondary containment. Mr. Carpenter stated a truck |
2703547 | Primary Facility | 2018-03-07 | Routine/Complete Inspection | No Violations Noted | Cold/windy at time of inspection.
Conductor only at time of inspection. |
2709330 | Primary Facility | 2018-03-23 | Drilling/Alteration | No Violations Noted | At time of inspection rig crew nippling up well head and getting ready to test BOP thus afternoon. No issues at time of inspection. |
2714866 | Primary Facility | 2018-04-05 | Drilling/Alteration | No Violations Noted | At time of inspection they were drilling the lateral part of the well bore, at time of inspection the well depth was at 13,212'. No know issues at time of inspection. It was noted that there is a possibility of having to flair due to encountering gas while drilling. |
2722060 | Primary Facility | 2018-04-23 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection conducted a routine inspection of the Eclipse Resources LLC –Painter Well Site located in Westfield Twp., Tioga Co. on 4/23/2018 @ 1300 hours. The weather was 65 degrees and sunny. Zachary Subra, Eclipse Resources EHS Field Rep was present onsite for the inspection.
Onsite personnel were currently in the process of “rigging down” in preparation for moving the drilling rig to another location. A large crane and multiple escort and transport vehicles were staged onsite. Components of the rig were being pressure washed on the main containment before being hauled offsite. One tank of brine was observed on the main containment leftover from drilling. The mud tanks still contained drilling mud. Those tanks were scheduled to be emptied as part of the removal process. The mud would be sent to another drilling location. Puddles on the ground surface were screened for conductivity and found to be within normal range. No violations are noted at this time. I departed the sit |
2726394 | Primary Facility | 2018-05-03 | Incident- Response to Accident or Event | Violation(s) Noted | The DEP conducted an ICDNT inspection at the Eclipse Resources – Painter Well Pad on 5/3/2018 @1030 hours in response to spill #333923, reported on 5/1/2018. The weather was 74 degrees and sunny. Heavy rain showers were expected in the afternoon. Zachary Subra of Eclipse Resources called in to report a subcontractor had used 40 bbl of brine water, leftover from drilling the 2H well, to wash down the rig mats on containment. Mr. Subra stated, due to holes in the containment an unknown quantity of the brine was released to the pad surface. Screening and excavation of impacted pad surface material commenced on Tuesday, 5/1/2018. Initial field readings of the impacted material were 80-100 mS/cm.
Upon transfer of the Painter well pad from Travis Peak, Eclipse had brought in material and regraded the pad surface to establish positive drainage away from the cellars. The NE quadrant of the pad surface was observed excavated down between 1’-2’ in some areas. Mr. Subra stated the brine appeared to infiltrate the top |
2734037 | Primary Facility | 2018-05-24 | Follow-up Inspection | Outstanding Violations - Viols Req'd | The DEP conducted a follow-up inspection at the Eclipse Resources Painter Well Pad located in Westfield Township, Tioga County on May 24, 2018 @1030 hours. The weather was 71 degrees and sunny. Winds WNW 6mph.
Zach Subra and Alex Duranko, Eclipse Resources EHS were onsite during the inspection. Penn E&R consultants were onsite collecting confirmatory samples from two areas on the pad surface, and the forebay of the sediment trap in relation to Spill #333932 reported on 5/1/2018. The excavated areas are still open. All rainwater coming into contact with excavated areas of the pad is pumped from the sump into rolloff containers staged on containment. Any fluid accumulating in the four bay of the sediment trap is also being pumped into separate rolloff containers staged on containment. The recovered fluid is being sent to Hydro recovery for disposal . The excavated pad material is in tarped waste containers, staged on containment, awaiting disposal approval. Violations issued 5/3/2018 against the 2H well pe |
2757024 | Primary Facility | 2018-07-27 | Compliance Evaluation | No Violations Noted | On July 24, 2018 the Department of Environmental protection approve a state wide health standard final report for the release occurring at the Painter well pad. The violations cited on May 3 and subsequent outstanding violations are considered resolved. |
2759037 | Primary Facility | 2018-07-31 | Follow-up Inspection | No Violations Noted | The DEP conducted a routine inspection of the Eclipse Resources – Painter Well Pad located in Westfield Twp., Tioga Co. on 7/31/2018 @1215 hours. The weather was 78 degrees and cloudy. Korey Starkey, DEP Env. Trainee and Zac Subra,Eclipse Resources EHS Field Rep were present for the inspection.
Halliburton was onsite performing a frack on the 2H well (API#117-21907). Mr. Subra stated completion activities began on 7/24/2018 and he believes Haliburton will be on location for another 10 days. Due to heavy precipitation in the past week, the pad surface was very muddy with standing water in some areas. All puddles screened for conductivity were <1000µS/cm. No violations are noted at this time. I departed the site at 1345 hours. |
2790022 | Primary Facility | 2018-10-16 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a routine inspection of Eclipse Resource's Painter Well Pad in Westfield Twp, Tioga County on 10/16/2018 at 1230 hours. The weather was partly cloudy and 49 degrees.
The pad is currently under flow back operations. Onsite company personal was currently monitoring the flowback. Two production tanks and frac tanks were located onsite within secondary containment. All fluids field measured were within normal conductivity ranges. No violations noted at this time. We departed the site at 1305 hours. |
2841593 | Primary Facility | 2019-02-19 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection (DEP) conducted a routine inspection of the Eclipse Resources - Painter Well Pad located in Westfield Twp, Tioga Co. on 2/19/2019 @1030 hours the weather was 17 degrees, winds NW @10 mph, humidity 43%. There were two wells in production on the pad. No activity was observed. Zach Subra, Eclipse Resources was present onsite for the inspection.
No violations are noted at this time. I departed the site @ 1130 hours. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2726394 | 815761 | 2018-05-03 | 2018-07-27 | CSL 402(b) | Environmental Health & Safety | Eclipse Resources called in to report a subcontractor had used approximately 40 bbl of brine water, leftover from drilling the 2H well, to wash down the rig mats on containment. Mr. Subra stated, due to holes in the containment an unknown quantity of the brine was released to the pad surface. |
2726394 | 815762 | 2018-05-03 | 2018-07-27 | SWMA 301 | Environmental Health & Safety | |
2726394 | 815763 | 2018-05-03 | 2018-07-27 | 78a64a(b) | Environmental Health & Safety | |
2734037 | 817526 | 2018-05-24 | 2018-07-24 | CSL 402(b) | Environmental Health & Safety | Eclipse Resources called in to report a subcontractor had used approximately 40 bbl of brine water, leftover from drilling the 2H well, to wash down the rig mats on containment. Mr. Subra stated, due to holes in the containment an unknown quantity of the brine was released to the pad surface. |
2734037 | 817527 | 2018-05-24 | 2018-07-27 | SWMA 301 | Environmental Health & Safety | |
2734037 | 817528 | 2018-05-24 | 2018-07-27 | 78a64a(b) | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
815761 | 363735 | NOV - Notice of Violation | 2018-07-27 | ||||
815762 | 363735 | NOV - Notice of Violation | 2018-07-27 | ||||
815763 | 363735 | NOV - Notice of Violation | 2018-07-27 |
For data sources see[7]