X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-21925

Well Details

Well ID: 37-117-21925
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 152994
Farm/Lease Name: BLISS 4H
License Status:
Spud Date: 2019-01-14
Permit Date: 2017-10-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.581572
Longitude: -77.100958

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-10-26 New Permit Application
2018-10-12 Permit Renewal Application
2019-01-13 Performed Spud Operation
2019-02-26 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-04-03 2019-04-12 6,852 12,522,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand U.S. Well Services Proppant Crystalline Silica, quartz 14808-60-7 100 9.79755 11,533,300.0
WFRA-2000 U.S. Well Services Friction Reducer Hydrated light distillate (petroleum) 64742-47-8 30 0.023198 27307.3
Water 7732-18-5 60 0.05658 66603.2
2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.02829 33301.6
FSTI-IC-001 FSTI Iron Control Additive Citric Acid 77-92-9 40 0.001733 2040.03
Acetic Acid 64-19-7 60 0.002279 2682.64
SI-1300s U.S. Well Services Scale Inhibitor Proprietary Scale Inhibitor Proprietary 5 0.000659 776.187
Proprietary Scale Inhibitor Proprietary 10 0.001319 1552.37
Proprietary Scale Inhibitor Proprietary 1 0.000132 155.237
HCL Acid (12.6%-17.5%) U.S. Well Services Bulk Acid Water 7732-18-5 87.4 0.02227 26214.7
Hydrogen Chloride 7647-01-0 17.5 0.005178 6094.87
Econo-CI200 Economy Polymers & Chemicals Acid Corrosion Inhibitors Methanol 67-56-1 80 0.00008900 104.232
Fatty acid methyl ester Proprietary 10 0.000146 171.304
Water Southwestern Energy Carrier/Base Fluid Water 7732-18-5 100 88.7223 104,440,000.0
K-BAC 1005 U.S. Well Services Anti-Bacterial Agent 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.76 0.001853 2181.76
Water 7732-18-5 44.3 0.005816 6846.13
Polyethylene Glycol 25322-68-3 50 0.007352 8654.25
HCL Acid (5% to 7.5%) U.S. Well Services Bulk Acid Hydrogen Chloride 7647-01-0 7.5 0.110949 130604
Water 7732-18-5 95 1.2103 1,424,710.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 SWN PROD CO LLC 3,130,644.00 245 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 SWN PROD CO LLC Synthetic Liner Materials 60.00 Tons LANDFILL 301358
2019 SWN PROD CO LLC Drill Cuttings 1,233.09 Tons LANDFILL 301358
2019 SWN PROD CO LLC Produced Fluid 3,710.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC035
2019 SWN PROD CO LLC Soil Contaminated by Oil 18.51 Tons LANDFILL 301358
2019 SWN PROD CO LLC Produced Fluid 8,835.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Drill Cuttings 128.96 Tons LANDFILL 101247
2019 SWN PROD CO LLC Produced Fluid 6,900.00 Bbl SURFACE IMPOUNDMENT 826342
2019 SWN PROD CO LLC Drilling Fluid Waste 1,400.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019 SWN PROD CO LLC Other Oil & Gas Wastes 32.00 Bbl REUSE (AT WELL PAD)
2019 SWN PROD CO LLC Waste Water Treatment Sludge 20.00 Tons LANDFILL 301358
2019 SWN PROD CO LLC Soil Contaminated by Oil & Gas Related Spills 18.51 Tons LANDFILL 301358
2019 SWN PROD CO LLC Produced Fluid 11,952.50 Bbl REUSE (AT WELL PAD)
2019 SWN PROD CO LLC Other Oil & Gas Wastes 555.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2654851 Primary Facility 2017-10-27 Routine/Complete Inspection No Violations Noted I met Jonathan Woodburn on-site. SWN rig # 45 running production casing in the 5H well. Cuttings processing was idle. Containments appeared to be in good condition. The site was somewhat muddy, and Woody told me he had a vac truck scheduled to clean things up.
2725607 Primary Facility 2018-05-01 Routine/Complete Inspection No Violations Noted I met Joe Forker, SWN company man when I arrived. A workover rig was on the site, and had been drilling out plugs on the 1H well; when I arrived, the rig was tripping out of the well. Joe informed me that they would be deploying fishing tools into the well to recover some live perf guns that were lost in the 8th stage. Joe walked the site with me. A 50-70 gallon puddle on the pad in a high traffic area had slightly elevated conductivity 2.36 mS/cm); all other puddles on the pad were significantly lower (.3- .9 mS/cm). I recommended to Joe that he have it vacced, and while I was still on the site Joe directed a vac truck driver to move to the puddle and clean it up. The containment and berms seemed to be in good condition.
2833295 Primary Facility 2019-01-28 Routine/Complete Inspection No Violations Noted Weather was 21° and sunny at time of inspection. There were no Southwestern representatives on location at time of inspection. A containment crew was on location laying containment for the drilling rig to move on. Well was a spud conductor. Well was covered by containments at time of inspection. No violations were noted at time of inspection.
2841882 Primary Facility 2019-02-11 Routine/Complete Inspection No Violations Noted Weather was 25° and snowy at time of inspection. Met with Southwestern representative Dan Hessdorfer on location. Rig was in the process of drilling the 17 1/2" hole for the 13 3/8" surface casing. They were estimating to TD the surface hole around 3 pm and cement shortly after running casing. There are 2 other wells on the pad that were previously drilled. One was shut in due to having to position the rig where its pay line was located. The other well was still online. Both wells were covered with a steel cage and had active gas monitoring at time of inspection. No violations were noted at time of inspection.
2842714 Primary Facility 2019-02-21 Routine/Complete Inspection No Violations Noted Weather - 40 degrees and sunny

Met with Southwestern representative Andrew Griffith on location. Rig was currently drilling the 8 1/2' hole for the production casing. They drilled 8 3/4' from the intermediate shoe to a depth of 6485'. They recently drilled and cemented the surface and intermediate casing. Reviewed the cement and job logs and no discrepancies were noted at time of inspection. No violations were noted at time of inspection.

2845450 Primary Facility 2019-02-26 Routine/Complete Inspection No Violations Noted SDC 44 rig on location. I met Andrew Griffith of SWN on the site; rig was running casing in the 4H well, and Andrew told me the rig would be skidding to the 6H well on the evening of 2/26. Sitewide and secondary containments and berms appeared to be in good condition, and the cuttings processing area and backyard were clean and well maintained. Chemical storage areas were clean as well. Andrew informed me that they were using dual-fuel air packs which are capable of diesel and natural gas blended up to 70% diesel. Most of the air packs were not in use while I was on the site.
2852998 Primary Facility 2019-03-13 Routine/Complete Inspection No Violations Noted Weather was 30 degrees and sunny. Met with Southwestern representative Dan Hessdorfer on location. Well was recently drilled and cemented to TD. Well was currently shut in with a nightcap. No violations at time of inspection.

For data sources see[8]

References