X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-21945

Well Details

Well ID: 37-117-21945
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: SWN PROD CO LLC
Well Pad ID:
Farm/Lease Name: CONNOLLY A 4H
License Status:
Spud Date:
Permit Date: 2017-12-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.573489
Longitude: -77.130928

For data sources see[1][2][3]

Well History

Date Event
2017-12-21 New Permit Application
2019-01-02 MOD

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2725590 Primary Facility 2018-05-01 Routine/Complete Inspection No Violations Noted No activity on the pad when I arrived. Pipeline work at entrance and across the road. Containment was partially dismantled, with some of the rig mats removed and stacked, as well as some berms removed and stacked. Puddles on the well pad showed low conductance (.9 -1.6 mS/cm). The 8H well cellar was nearly full to the top with water; I recommend that it be vacced ASAP. Site looked good overall.
2738671 Primary Facility 2018-06-05 Routine/Complete Inspection No Violations Noted I met Will Stevens of SWN in the command trailer when I arrived. Frac was active (Halliburton), although it was pressured down for a move from the 7H to the 8H well. I was joined on my inspection by Jeremy Eichenberger and Allen Green of SWN. The site and sitewide containment were very clean, with no standing water. I did note in 3 locations (near the sand boxes, near the production tanks, and near the GPUs) where the sitewide liner had fallen or been blown off of the Jersey barriers forming the berms, and pointed these out to Jeremy and Allen. The issue seemed to be that the liner had not been installed long enough to reach the ground on the backside of the Jersey barriers; Jeremy and Allen proposed seaming an additional piece of liner to the existing liner to allow the liner to reach the ground so it could be secured with sandbags to keep it in place.

For data sources see[5]

References