Well Details

Well ID: 37-117-21989
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: ROCKDALE MARCELLUS LLC
Well Pad ID: 153703
Farm/Lease Name: HARER 713 4H
License Status:
Spud Date:
Permit Date: 2018-04-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.594378
Longitude: -77.045414

For data sources see[1][2][3]

Well History

Date Event
2018-04-19 New Permit Application
2018-06-09 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-09 2018-08-26 7,205 11,395,200 120,364

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand 100 Mesh ProFrac Proppant Silica Substrate 14808-60-7 100 2.38305 2,652,040.0
ProFE 105 ProFrac Iron Control Citric Acid 77-92-9 40 0.00119 1325
Sulphamic Acid 5329-14-6 5 0.00015 166
Water 7732-18-5 70 0.00208 2318
Sand 40/70 ProFrac Proppant Silica Substrate 14808-60-7 100 11.2182 12,484,500.0
FloTreat DR 15482 Clariant Friction Reducer Hydrocarbons C9- C16 64742-47-8 50 0.02969 33042
Alcohols, C10-16, 6 EO 68002-97-1 10 0.00594 6608
BioTreat Clariant Biocide Glutaraldehyde 111-30-8 20 0.00692 7705
Dideclydimethylammonium Chloride 7173-51-5 3 0.00104 1156
Quaternary Ammonium Chloride 68424-85-1 3 0.00104 1156
ProHib 100 ProFrac Acid Inhibitor Water 7732-18-5 85 0.00211 2346
2-Propyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00037 414
ScaleTreat 14448 Clariant Scale Inhibitor Ammonium Chloride 12125-02-9 5 0.00115 1285
2,2',2 - Nitrilotris(acetamide) 4862-18-4 5 0.00115 1285
Methanol 67-56-1 60 0.01386 15422
Water Rockdale Marcellus Base Fluid Water 7732-18-5 100 85.4479 95,093,100.0
Hydrochloric Acid FSTI Acidizing Water 7732-18-5 72 0.59638 663697
hydrogen chloride 7647-01-0 28 0.23192 258104

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 ROCKDALE MARCELLUS LLC 1,163,809.00 122 0.00 0 0.00 0
2019 ROCKDALE MARCELLUS LLC 1,885,495.98 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 ROCKDALE MARCELLUS LLC Produced Fluid 19.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil & Gas Related Spills 15.84 Tons LANDFILL 301358
2018 ROCKDALE MARCELLUS LLC Produced Fluid 116.67 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 ROCKDALE MARCELLUS LLC Synthetic Liner Materials 10.50 Tons LANDFILL 301358
2018 ROCKDALE MARCELLUS LLC Produced Fluid 59.50 Tons LANDFILL 301358
2018 ROCKDALE MARCELLUS LLC Produced Fluid 1,577.33 Bbl REUSE (AT WELL PAD)
2018 ROCKDALE MARCELLUS LLC Other Oil & Gas Wastes 88.00 Bbl REUSE (AT WELL PAD)
2018 ROCKDALE MARCELLUS LLC Drill Cuttings 1,905.63 Tons LANDFILL 301358
2018 ROCKDALE MARCELLUS LLC Other Oil & Gas Wastes 69.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ROCKDALE MARCELLUS LLC Produced Fluid 6,762.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil 15.84 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Other Oil & Gas Wastes 820.00 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC036
2019 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil & Gas Related Spills 158.88 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Produced Fluid 4,342.23 Bbl REUSE (AT WELL PAD)
2019 ROCKDALE MARCELLUS LLC Produced Fluid 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ROCKDALE MARCELLUS LLC Produced Fluid 3,007.00 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC036
2019 ROCKDALE MARCELLUS LLC Soil Contaminated by Oil 158.88 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Produced Fluid 810.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 ROCKDALE MARCELLUS LLC Produced Fluid 1.67 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Synthetic Liner Materials 22.11 Tons LANDFILL 301358
2019 ROCKDALE MARCELLUS LLC Waste Water Treatment Sludge 100.55 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 ROCKDALE MARCELLUS LLC Other Oil & Gas Wastes 199.12 Bbl REUSE (AT WELL PAD)
2019 ROCKDALE MARCELLUS LLC Produced Fluid 553.33 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2747074 Primary Facility 2018-06-29 Routine/Complete Inspection No Violations Noted Weather was 70° and sunny at time of inspection. Met with Rockdale Marcellus representative Jim Tracey on location at time of inspection. The surface casing was cemented on 6/26/2018. A cap was welded on the well and the rig skidded to the 2H to complete it. Reviewed cement job log and no discrepancies were noted at time of inspection. Once the 2H is drilled and cased to TD rig will move back and complete the 4H. Conducted a walk around inspection of location. No violations noted at time of inspection.
2752943 Primary Facility 2018-07-16 Routine/Complete Inspection No Violations Noted Weather was 88° and sunny at time of inspection. Met with Rockdale Marcellus representative Danny Brooks on location at time of inspection. Rig was in the process of drilling the 8 1/2" hole for the production casing. The intermediate casing was cemented on 7/13/18. Reviewed the cement job log and no discrepancies were noted at time of inspection. Conducted a walk around inspection of location. No violations noted at time of inspection.
2759792 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted I met with Levi Lee, Levi Haigler, and Clayton Harriman when I arrived. Crews were deploying containment, regrading, and laying rig mats for the upcoming frac (estimated start 8/6). Some containment appeared to be left from the drilling rig, and I observed some small tears at the berms in this area. The Rockwater 43 K barrel MASS was deployed on the site. I observed that there was only 16-18" of freeboard in the primary tank, and that ~6-8" of rainwater had collected in the secondary tank containment. I informed Levi Lee of the containment berm tears and the freeboard and water in the secondary containment at the tank, and said that he would address them.
2763059 Primary Facility 2018-08-07 Incident- Response to Accident or Event No Violations Noted Spill response inspection; 8/7/2018.

On 8/6/2018, Regina Logue (Rockdale) called at 17:15 to report a possible leak in the containment. The estimated volume of the release was 10 gallons. I entered the site at 08:46 and met with Adam Altieri, Jennifer Compton, and Marc McCartor (all representing Rockdale). Water was ponded immediately south of the containment and field conductivity was greater than 20,000 umhos/cm (photo 2). Rig mats were being removed and cleaned from the area. Diesel-based drilling mud was being cleaned from the containment where rig mats were removed. The drill mud appeared to cover most if not all of the containment area where rig-mats were removed.

We walked to the the eastern-most well head (117-21857)and they described the release. It is believed water flowed from the containment surface into the cellar (the cellar was filled with gravel). The containment was not sealed to the cellar, so the water filled the cellar and overtopped. Evidence suggests the produced water flowed from the

For data sources see[8]