37-117-22034

Well Details

Well ID: 37-117-22034
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: PA GEN ENERGY CO LLC
Well Pad ID: 145499
Farm/Lease Name: COP TRACT 596 PAD B 2760
License Status:
Spud Date: 2018-11-29
Permit Date: 2018-11-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.625736
Longitude: -77.045639

For data sources see[1][2][3]

Well History

Date Event
Deviated
2018-11-09 New Permit Application
2018-11-29 Performed Spud Operation
2019-04-09 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 PA GEN ENERGY CO LLC 1,015,293.00 182 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PA GEN ENERGY CO LLC Drill Cuttings 61.11 Tons LANDFILL 301358
2019 PA GEN ENERGY CO LLC Produced Fluid 83.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 PA GEN ENERGY CO LLC Produced Fluid 21.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 PA GEN ENERGY CO LLC Produced Fluid 263.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2019 PA GEN ENERGY CO LLC Produced Fluid 885.66 Bbl REUSE (AT WELL PAD)
2019 PA GEN ENERGY CO LLC Other Oil & Gas Wastes 94.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 PA GEN ENERGY CO LLC Produced Fluid 92.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 PA GEN ENERGY CO LLC Produced Fluid 12.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 PA GEN ENERGY CO LLC Other Oil & Gas Wastes 6.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 PA GEN ENERGY CO LLC Drilling Fluid Waste 97.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2019 PA GEN ENERGY CO LLC Produced Fluid 26.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 PA GEN ENERGY CO LLC Drill Cuttings 911.10 Tons LANDFILL 301358
2019 PA GEN ENERGY CO LLC Produced Fluid 230.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 PA GEN ENERGY CO LLC Produced Fluid 25.88 Tons LANDFILL 301358
2019 PA GEN ENERGY CO LLC Synthetic Liner Materials 6.94 Tons LANDFILL 301358
2019 PA GEN ENERGY CO LLC Produced Fluid 3,710.29 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PA GEN ENERGY CO LLC Other Oil & Gas Wastes 163.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 PA GEN ENERGY CO LLC Other Oil & Gas Wastes 39.67 Bbl REUSE (AT WELL PAD)
2019 PA GEN ENERGY CO LLC Produced Fluid 115.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2811282 Primary Facility 2018-12-06 Routine/Complete Inspection No Violations Noted Weather was 32° and cloudy at time of inspection. Met with PGE representative Dick Patrick on location. A crew was on site setting cellars in place at time of inspection. Well was a spud conductor. There was a steel plate covering the casing at time of inspection. 0% combustible gas was detected anywhere around the well at time of inspection. No violations were noted at time of inspection.
2848075 Primary Facility 2019-03-05 Routine/Complete Inspection No Violations Noted Weather was 12 degrees and sunny. Met with PGE representative Dave Waggoner and Ron Kaler on location. Well recently had its surface casing cemented. Reviewed the job log and no discrepancies were noted at time of inspection. Well was shut in with a night cap and will be completed at a later date. No violations at time of inspection.
2856244 Primary Facility 2019-03-20 Routine/Complete Inspection No Violations Noted Weather was 40 degrees and sunny. Met with PGE representatives Zachary Ferdurko and Chauncey Klein on location. They were currently getting ready to cement they 9 5/8 intermediate casing. Halliburton was on location rigging up for the cement job. No violations at time of inspection.

For data sources see[7]