If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-22047 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.701836,"lon":-76.972063,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Ward Township | |
Operator Name: REPSOL OIL & GAS USA LLC | |
Well Pad ID: 148189 | |
Farm/Lease Name: DCNR 587 (02-001-07) 7H | |
License Status: | |
Spud Date: 2019-05-06 | |
Permit Date: 2019-01-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.701836 | |
Longitude: -76.972063 |
Date | Event |
---|---|
Deviated | |
2019-01-30 | New Permit Application |
2019-02-26 | Performed Spud Operation |
2019-05-19 | Drilling Completion |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | REPSOL OIL & GAS USA LLC | 1,565,842.00 | 120 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 2,020.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 420.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | REPSOL OIL & GAS USA LLC | Drill Cuttings | 724.97 Tons | LANDFILL | 101243 |
2019 | REPSOL OIL & GAS USA LLC | Synthetic Liner Materials | 14.78 Tons | LANDFILL | 301358 |
2019 | REPSOL OIL & GAS USA LLC | Drill Cuttings | 858.63 Tons | LANDFILL | 301358 |
2019 | REPSOL OIL & GAS USA LLC | Synthetic Liner Materials | 1.03 Tons | LANDFILL | 8-0728-0004/013 |
2019 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil | 0.01 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2019 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 76.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 1,070.49 Bbl | REUSE (AT WELL PAD) | |
2019 | REPSOL OIL & GAS USA LLC | Drill Cuttings | 17.76 Tons | LANDFILL | 8-0728-0004/013 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 252.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2019 | REPSOL OIL & GAS USA LLC | Unused Fracturing Fluid Waste | 9.26 Tons | LANDFILL | 8-0728-0004/013 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 13,150.37 Bbl | REUSE (AT WELL PAD) | |
2019 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil & Gas Related Spills | 0.01 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2846512 | Primary Facility | 2019-02-28 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a routine inspection of Repsol's DCNR 587 02-001 Well Pad in Ward Township, Tioga County on 2/28/2019 at 1200 hours. The weather was partly cloudy and 22 degrees. The pad had 1-2 inches of snow cover on top and was very icy.
The act 9 sign was observed at the entrance of the site. The E&S plan was available for review in the mailbox by the gate. Crew was observed onsite using a top hole rig to drill and set conductors for the 3 new wells (7H, 9H, & 11H). A skid steer and bucket were used to dispose of top hole cuttings into a roll off bin. There are currently 3 already producing wells onsite (4H, 5H, & 6H). PCSM BMPs were observed installed and functional. No erosional issues could be observed. All containment structures were intact and all fluids on the pad were frozen solid today. There was no evidence of releases or spills. No violations noted today, I departed the site at 1240 hours. |
For data sources see[7]