If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-38815 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.336633,"lon":-79.77763,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Sandycreek Township | |
Operator Name: TIMBERLINE ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: NETTLES 14 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 1984-08-06 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.336633 | |
Longitude: -79.777630 |
Date | Event |
---|---|
1984-08-06 | New Permit Application |
1984-10-28 | Performed Spud Operation |
1984-10-29 | Drilling Completion |
1984-11-08 | Perforation |
1985-03-26 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1991 | TIMBERLINE ENERGY INC | 0.00 | 0 | 33.00 | 300 | 0.00 | 0 |
1992 | TIMBERLINE ENERGY INC | 0.00 | 0 | 70.55 | 300 | 0.00 | 0 |
1993 | TIMBERLINE ENERGY INC | 0.00 | 0 | 1.13 | 300 | 0.00 | 0 |
2004 | TIMBERLINE ENERGY INC | 0.00 | 0 | 20.43 | 330 | 0.00 | 0 |
2005 | TIMBERLINE ENERGY INC | 0.00 | 0 | 31.07 | 330 | 0.00 | 0 |
2006 | TIMBERLINE ENERGY INC | 0.00 | 0 | 37.76 | 330 | 0.00 | 0 |
2014 | TIMBERLINE ENERGY INC | 0.00 | 0 | 8.40 | 138 | 0.00 | 0 |
2015 | TIMBERLINE ENERGY INC | 0.00 | 0 | 6.90 | 116 | 0.00 | 0 |
2016 | TIMBERLINE ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | TIMBERLINE ENERGY INC | Produced Fluid | 41.5 Bbl | CENT WASTE TRT FAC NPDES | PA0222011 |
2014 | TIMBERLINE ENERGY INC | Produced Fluid | 41.50 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0222011 |
2015 | TIMBERLINE ENERGY INC | Produced Fluid | 32.40 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0222011 |
2015 | TIMBERLINE ENERGY INC | Produced Fluid | 32.4 Bbl | CENT WASTE TRT FAC NPDES | PA0222011 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2691852 | Primary Facility | 2018-02-05 | Routine/Partial Inspection | No Violations Noted | Inspection shows rig over the well bore with operations shut down. Well is scheduled to be plugged in the coming week. Operator to file NOI. |
2697311 | Primary Facility | 2018-02-22 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | NOI & ALT METHOD received electronically on 2/21/18 with plugging scheduled for 2/22/18. Discuss plugging procedure with Jack Cochran on site. Rig currently running tubing to TD and are plaining to gel hole with cement plug scheduled for 2/23/18. |
2697748 | Primary Facility | 2018-02-23 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Previous report on 2/22/18 showed operator running cement string and scheduled to gel. Inspection shows rig hands and Jack on site running bottom cement plug. Only 35 sks on site for the proposed 44sks cement plug. Rig will pull up after the 35sks and run in the following week and tag plug. Additional cement will be run at that point. |
2697808 | Primary Facility | 2018-02-26 | Administrative/File Review | No Violations Noted | |
2699293 | Primary Facility | 2018-02-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | 35sks cement previously set from 781ft. Rig ran in and tagged cement plug within 10ft from the calculated cement top previously set. Additional cement added to bring plug up to 50ft above the 1st (480'). Bottom plug yield 1.36 2% bentonite. Casing seat plug set from 298ft to 228ft (yield 1.18). Rig scheduled to tag top plug next week. |
2773154 | Primary Facility | 2018-09-10 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Previous reports show cement plugs set. Well has not been top- holed. Contractor has been scheduled to top hole well and complete site restoration. Operator to submit Certificate of Plugging. |
For data sources see[7]