If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-44634 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.545819,"lon":-79.569192,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Allegheny Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: BLANK JB | |
| License Status: Plugged and Abandoned | |
| Spud Date: 2010-07-12 | |
| Permit Date: 2010-04-01 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.545819 | |
| Longitude: -79.569192 |
| Date | Event |
|---|---|
| 2010-04-01 | New Permit Application |
| 2010-07-14 | Drilling Completion |
| 2010-07-14 | Performed Spud Operation |
| 2010-08-10 | Perforation |
| 2010-08-11 | Performed Stimulation |
| 2011-02-03 | Newly Drilled |
| 2016-12-12 | Begin Plugging |
| 2016-12-15 | Finished Plugging |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2010-08-11 | sand | 0 | 0 | 0 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2012 | CATALYST ENERGY INC | 0.00 | 0 | 162.00 | 366 | 833.13 | 366 |
| 2014 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2015 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2016 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2012 | CATALYST ENERGY INC | Produced Fluid | 833.13 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2012 | CATALYST ENERGY INC | Produced Fluid | 451.88 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2014 | CATALYST ENERGY INC | Produced Fluid | 59.60 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2014 | CATALYST ENERGY INC | Produced Fluid | 59.6 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1899653 | Primary Facility | 2010-07-15 | Drilling/Alteration | No Violations Noted | |
| 2439319 | Primary Facility | 2016-01-05 | Routine/Complete Inspection | No Violations Noted | |
| 2542603 | Primary Facility | 2016-12-07 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
| 2543910 | Primary Facility | 2016-12-12 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
| 2544384 | Primary Facility | 2016-12-13 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
| 2547036 | Primary Facility | 2016-12-22 | Plugging(Includes Plugged/Mined Through) | No Violations Noted |
For data sources see[8]