If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45082 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.315517,"lon":-79.626219,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Rockland Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: MASTERS WEST 2982 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-12-12 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.315517 | |
Longitude: -79.626219 |
Date | Event |
---|---|
2012-12-12 | New Permit Application |
2013-04-24 | Performed Spud Operation |
2013-04-26 | Drilling Completion |
2014-12-22 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CATALYST ENERGY INC | 0.00 | 0 | 100.31 | 365 | 0 | 365 |
2015 | CATALYST ENERGY INC | 0.00 | 0 | 52.97 | 30 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 35.96 | 61 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 33.00 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 39.49 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | Produced Fluid | 120.83 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 120.83 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 119.17 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 119.17 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 18.33 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 3.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | CATALYST ENERGY INC | Produced Fluid | 239.17 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 65.50 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2149095 | Primary Facility | 2013-03-13 | Routine/Complete Inspection | No Violations Noted | |
2161962 | Primary Facility | 2013-04-26 | Routine/Complete Inspection | No Violations Noted | |
2165411 | Primary Facility | 2013-04-30 | Routine/Complete Inspection | No Violations Noted | |
2172448 | Primary Facility | 2013-06-06 | Administrative/File Review | No Violations Noted | |
2173095 | Primary Facility | 2013-06-06 | Routine/Complete Inspection | No Violations Noted | |
2178316 | Primary Facility | 2013-06-20 | Routine/Complete Inspection | No Violations Noted | |
2181029 | Primary Facility | 2013-07-03 | Routine/Complete Inspection | No Violations Noted | |
2200604 | Primary Facility | 2013-08-29 | Site Restoration | No Violations Noted | |
2230158 | Primary Facility | 2013-12-17 | Routine/Complete Inspection | No Violations Noted | |
2654562 | Primary Facility | 2017-10-31 | Routine/Partial Inspection | No Violations Noted | Inspection shows well equipped for production with rods, tubing, pump jack, & electric motor. Annulus open to the atmosphere. |
For data sources see[7]