If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-45159 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.382403,"lon":-79.771186,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: DEEP HOLLOW 3410 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2013-02-11 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.382403 | |
| Longitude: -79.771186 |
| Date | Event |
|---|---|
| 2013-02-11 | New Permit Application |
| 2013-05-07 | Performed Spud Operation |
| 2013-05-08 | Drilling Completion |
| 2014-12-30 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2014 | CATALYST ENERGY INC | 0.00 | 0 | 712.20 | 365 | 0 | 365 |
| 2015 | CATALYST ENERGY INC | 0.00 | 0 | 32.56 | 30 | 0.00 | 0 |
| 2016 | CATALYST ENERGY INC | 0.00 | 0 | 257.17 | 152 | 0.00 | 0 |
| 2017 | CATALYST ENERGY INC | 0.00 | 0 | 647.32 | 365 | 0.00 | 0 |
| 2018 | CATALYST ENERGY INC | 0.00 | 0 | 345.87 | 365 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2014 | CATALYST ENERGY INC | Produced Fluid | 1,441.75 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2014 | CATALYST ENERGY INC | Produced Fluid | 1,441.75 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 27.5 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 27.50 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 767.50 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 767.5 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 55.00 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 25.00 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 10.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 55.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 1,322.50 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 72.50 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 668.75 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 430.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 75.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 27.50 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 263.75 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2164838 | Primary Facility | 2013-05-07 | Drilling/Alteration | No Violations Noted | |
| 2165623 | Primary Facility | 2013-05-08 | Routine/Complete Inspection | No Violations Noted | |
| 2167860 | Primary Facility | 2013-05-17 | Routine/Complete Inspection | No Violations Noted | |
| 2178307 | Primary Facility | 2013-06-19 | Routine/Complete Inspection | No Violations Noted | |
| 2179216 | Primary Facility | 2013-06-27 | Administrative/File Review | No Violations Noted | |
| 2180952 | Primary Facility | 2013-07-03 | Routine/Partial Inspection | No Violations Noted | |
| 2183090 | Primary Facility | 2013-07-10 | Routine/Complete Inspection | No Violations Noted | |
| 2197996 | Primary Facility | 2013-08-12 | Routine/Complete Inspection | No Violations Noted | |
| 2202481 | Primary Facility | 2013-09-06 | Routine/Complete Inspection | No Violations Noted | |
| 2204272 | Primary Facility | 2013-09-13 | Routine/Complete Inspection | No Violations Noted | |
| 2219999 | Primary Facility | 2013-11-05 | Routine/Complete Inspection | No Violations Noted | |
| 2311957 | Primary Facility | 2014-10-10 | Site Restoration | No Violations Noted | |
| 2470274 | Primary Facility | 2016-03-31 | Routine/Complete Inspection | No Violations Noted | |
| 2481785 | Primary Facility | 2016-05-03 | Routine/Complete Inspection | No Violations Noted |
For data sources see[7]