X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-121-45159

Well Details

Well ID: 37-121-45159
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: DEEP HOLLOW 3410
License Status:
Spud Date:
Permit Date: 2013-02-11
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.382403
Longitude: -79.771186

For data sources see[1][2][3]

Well History

Date Event
2013-02-11 New Permit Application
2013-05-07 Performed Spud Operation
2013-05-08 Drilling Completion
2014-12-30 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CATALYST ENERGY INC 0.00 0 712.20 365 0 365
2015 CATALYST ENERGY INC 0.00 0 32.56 30 0.00 0
2016 CATALYST ENERGY INC 0.00 0 257.17 152 0.00 0
2017 CATALYST ENERGY INC 0.00 0 647.32 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 345.87 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CATALYST ENERGY INC Produced Fluid 1,441.75 Bbl CENT WASTE TRT FAC NPDES PA0101508
2014 CATALYST ENERGY INC Produced Fluid 1,441.75 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2015 CATALYST ENERGY INC Produced Fluid 27.5 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 CATALYST ENERGY INC Produced Fluid 27.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 767.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 767.5 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 55.00 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 25.00 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 10.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017 CATALYST ENERGY INC Produced Fluid 55.00 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017 CATALYST ENERGY INC Produced Fluid 1,322.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 72.50 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 668.75 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 430.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 75.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 CATALYST ENERGY INC Produced Fluid 27.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE 001-A
2019 CATALYST ENERGY INC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 263.75 Bbl INJECTION DISPOSAL WELL 34-155-24079

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2164838 Primary Facility 2013-05-07 Drilling/Alteration No Violations Noted
2165623 Primary Facility 2013-05-08 Routine/Complete Inspection No Violations Noted
2167860 Primary Facility 2013-05-17 Routine/Complete Inspection No Violations Noted
2178307 Primary Facility 2013-06-19 Routine/Complete Inspection No Violations Noted
2179216 Primary Facility 2013-06-27 Administrative/File Review No Violations Noted
2180952 Primary Facility 2013-07-03 Routine/Partial Inspection No Violations Noted
2183090 Primary Facility 2013-07-10 Routine/Complete Inspection No Violations Noted
2197996 Primary Facility 2013-08-12 Routine/Complete Inspection No Violations Noted
2202481 Primary Facility 2013-09-06 Routine/Complete Inspection No Violations Noted
2204272 Primary Facility 2013-09-13 Routine/Complete Inspection No Violations Noted
2219999 Primary Facility 2013-11-05 Routine/Complete Inspection No Violations Noted
2311957 Primary Facility 2014-10-10 Site Restoration No Violations Noted
2470274 Primary Facility 2016-03-31 Routine/Complete Inspection No Violations Noted
2481785 Primary Facility 2016-05-03 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References