If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-45212 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.368083,"lon":-79.633172,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: HAZEL RICE 3083 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2013-03-12 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.368083 | |
| Longitude: -79.633172 |
| Date | Event |
|---|---|
| 2013-03-12 | New Permit Application |
| 2013-05-21 | Performed Spud Operation |
| 2013-05-23 | Drilling Completion |
| 2015-07-08 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2014 | CATALYST ENERGY INC | 0.00 | 0 | 220.50 | 365 | 0 | 365 |
| 2015 | CATALYST ENERGY INC | 0.00 | 0 | 8.65 | 61 | 0.00 | 0 |
| 2016 | CATALYST ENERGY INC | 0.00 | 0 | 15.48 | 61 | 0.00 | 0 |
| 2017 | CATALYST ENERGY INC | 0.00 | 0 | 93.15 | 365 | 0.00 | 0 |
| 2018 | CATALYST ENERGY INC | 0.00 | 0 | 64.80 | 365 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2014 | CATALYST ENERGY INC | Produced Fluid | 676.25 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2014 | CATALYST ENERGY INC | Produced Fluid | 676.25 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 49.58 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 49.58 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 183.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 183.33 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 9.17 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 351.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 18.33 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 332.92 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 12.50 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2170850 | Primary Facility | 2013-05-22 | Routine/Complete Inspection | No Violations Noted | |
| 2185359 | Primary Facility | 2013-07-23 | Administrative/File Review | No Violations Noted | |
| 2206074 | Primary Facility | 2013-09-18 | Routine/Complete Inspection | No Violations Noted | |
| 2228881 | Primary Facility | 2013-12-12 | Routine/Complete Inspection | No Violations Noted | |
| 2237560 | Primary Facility | 2014-01-16 | Routine/Complete Inspection | No Violations Noted | |
| 2244192 | Primary Facility | 2014-02-04 | Routine/Complete Inspection | No Violations Noted | |
| 2265743 | Primary Facility | 2014-04-23 | Site Restoration | No Violations Noted | |
| 2289747 | Primary Facility | 2014-07-23 | Site Restoration | No Violations Noted | |
| 2315571 | Primary Facility | 2014-10-21 | Site Restoration | No Violations Noted |
For data sources see[7]