If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45406 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.383939,"lon":-79.765167,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cranberry Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: DEEP HOLLOW 3401 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-10-22 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.383939 | |
Longitude: -79.765167 |
Date | Event |
---|---|
2013-10-22 | New Permit Application |
2014-01-22 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | 0.00 | 0 | 601.66 | 195 | 0 | 195 |
2015 | CATALYST ENERGY INC | 0.00 | 0 | 25.67 | 10 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 85.34 | 61 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 463.36 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 385.27 | 365 | 0.00 | 0 |
2019 | CATALYST ENERGY INC | 0.00 | 0 | 333.97 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | Produced Fluid | 1,455.57 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2014 | CATALYST ENERGY INC | Produced Fluid | 1,455.57 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 28.33 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 28.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 383.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 383.33 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 36.67 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 920.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 40.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 580.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 18.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 18.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 219.17 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 40.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 37.50 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
2019 | CATALYST ENERGY INC | Produced Fluid | 18.33 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2019 | CATALYST ENERGY INC | Produced Fluid | 134.17 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2239149 | Primary Facility | 2014-01-23 | Routine/Complete Inspection | No Violations Noted | |
2282835 | Primary Facility | 2014-06-26 | Routine/Complete Inspection | No Violations Noted | |
2311911 | Primary Facility | 2014-10-10 | Site Restoration | No Violations Noted | |
2600580 | Primary Facility | 2017-06-02 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is stable. There are no E&S issues. |
For data sources see[7]