If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45519 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.381053,"lon":-79.766294,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cranberry Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: DEEP HOLOW | |
License Status: Active | |
Spud Date: 2015-05-06 | |
Permit Date: 2014-01-07 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.381053 | |
Longitude: -79.766294 |
Date | Event |
---|---|
2014-01-07 | New Permit Application |
2014-12-29 | Permit Renewal Application |
2015-05-06 | Performed Spud Operation |
2015-05-11 | Drilling Completion |
2016-08-11 | Perforation |
2016-08-12 | Performed Stage 1 of Stimulation |
2016-08-12 | Performed Stage 2 of Stimulation |
2016-08-12 | Performed Stage 3 of Stimulation |
2016-08-12 | Performed Stage 4 of Stimulation |
2016-08-12 | Performed Stage 5 of Stimulation |
2016-08-12 | Performed Stage 6 of Stimulation |
2016-08-12 | Performed Stage 7 of Stimulation |
2016-08-12 | Performed Stage 8 of Stimulation |
2017-02-21 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-08-12 | 1 | SAND | 34,482 | 2,600 | 3,000 |
2016-08-12 | 2 | SAND | 34,482 | 2,000 | 3,000 |
2016-08-12 | 3 | SAND | 34,482 | 2,100 | 4,200 |
2016-08-12 | 4 | SAND | 34,482 | 1,500 | 500 |
2016-08-12 | 5 | SNAD | 34,482 | 1,300 | 500 |
2016-08-12 | 6 | SAND | 34,482 | 1,900 | 2,400 |
2016-08-12 | 7 | SAND | 34,482 | 1,900 | 3,300 |
2016-08-12 | 8 | SAND | 34,482 | 2,000 | 3,400 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 1419.57 | 213 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 471.68 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 286.05 | 365 | 0.00 | 0 |
2019 | CATALYST ENERGY INC | 0.00 | 0 | 326.85 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | CATALYST ENERGY INC | Produced Fluid | 8.46 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 2,163.85 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 2,163.85 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 16.92 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 17.69 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 80.77 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 64.62 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 11.54 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 3,451.83 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 157.69 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 46.92 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | CATALYST ENERGY INC | Produced Fluid | 21.08 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 2,118.35 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 8.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 155.38 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 688.46 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 55.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2019 | CATALYST ENERGY INC | Produced Fluid | 278.46 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 50.77 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2336437 | Primary Facility | 2015-01-16 | Routine/Complete Inspection | No Violations Noted | |
2339669 | Primary Facility | 2015-01-27 | Routine/Complete Inspection | No Violations Noted | |
2367380 | Primary Facility | 2015-05-06 | Drilling/Alteration | No Violations Noted | |
2368046 | Primary Facility | 2015-05-08 | Routine/Complete Inspection | No Violations Noted | |
2368047 | Primary Facility | 2015-05-08 | Routine/Complete Inspection | No Violations Noted | |
2370168 | Primary Facility | 2015-05-13 | Routine/Complete Inspection | No Violations Noted | |
2376567 | Primary Facility | 2015-06-08 | Administrative/File Review | No Violations Noted | |
2416273 | Primary Facility | 2015-10-13 | Routine/Complete Inspection | No Violations Noted | |
2422175 | Primary Facility | 2015-10-28 | Site Restoration | No Violations Noted | |
2509808 | Primary Facility | 2016-08-11 | Drilling/Alteration | No Violations Noted | |
2512090 | Primary Facility | 2016-08-16 | Routine/Complete Inspection | No Violations Noted | |
2516739 | Primary Facility | 2016-09-07 | Administrative/File Review | No Violations Noted | |
2560797 | Primary Facility | 2017-02-10 | Routine/Complete Inspection | No Violations Noted | |
2640861 | Primary Facility | 2017-09-27 | Site Restoration | No Violations Noted | Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is stable. There are no E&S issues. The site is considered restored. |
For data sources see[8]