37-121-45520

Well Details

Well ID: 37-121-45520
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: DEEP HOLOW
License Status: Active
Spud Date: 2015-03-06
Permit Date: 2014-01-07
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.381617
Longitude: -79.765539

For data sources see[1][2][3]

Well History

Date Event
2014-01-07 New Permit Application
2014-12-29 Permit Renewal Application
2015-03-06 Performed Spud Operation
2015-03-10 Drilling Completion
2016-08-07 Perforation
2016-08-07 Performed Stage 1 of Stimulation
2016-08-07 Performed Stage 2 of Stimulation
2016-08-07 Performed Stage 3 of Stimulation
2016-08-07 Performed Stage 4 of Stimulation
2016-08-07 Performed Stage 5 of Stimulation
2016-08-07 Performed Stage 6 of Stimulation
2016-08-07 Performed Stage 7 of Stimulation
2017-02-21 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-08-07 1 SAND 30,198 1,400 2,450
2016-08-07 2 SAND 30,198 1,400 1,200
2016-08-07 3 SAND 30,198 1,400 1,200
2016-08-07 4 SAND 30,198 1,500 500
2016-08-07 5 SAND 30,198 2,300 3,200
2016-08-07 6 SAND 30,198 1,600 2,700
2016-08-07 7 SAND 30,198 1,600 3,500

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2016 CATALYST ENERGY INC 0.00 0 1419.57 213 0.00 0
2017 CATALYST ENERGY INC 0.00 0 471.68 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 286.05 365 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CATALYST ENERGY INC Produced Fluid 8.46 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 2,163.85 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 2,163.85 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 8.46 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 8.46 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 80.77 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017 CATALYST ENERGY INC Produced Fluid 64.62 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017 CATALYST ENERGY INC Produced Fluid 11.54 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CATALYST ENERGY INC Produced Fluid 3,451.83 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 157.69 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 46.92 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 CATALYST ENERGY INC Produced Fluid 21.08 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 2,118.35 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 8.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 155.38 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 CATALYST ENERGY INC Produced Fluid 688.46 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 55.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 278.46 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 CATALYST ENERGY INC Produced Fluid 50.77 Bbl CENT WASTE TRT FAC NPDES DISCHARGE 001-A

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2349781 Primary Facility 2015-03-10 Administrative/File Review No Violations Noted
2351341 Primary Facility 2015-03-05 Routine/Complete Inspection No Violations Noted
2351733 Primary Facility 2015-03-10 Drilling/Alteration No Violations Noted
2365055 Primary Facility 2015-04-29 Administrative/File Review No Violations Noted
2416270 Primary Facility 2015-10-13 Routine/Complete Inspection No Violations Noted
2422187 Primary Facility 2015-10-28 Site Restoration No Violations Noted
2508340 Primary Facility 2016-08-08 Drilling/Alteration No Violations Noted
2512092 Primary Facility 2016-08-16 Routine/Complete Inspection No Violations Noted
2512167 Primary Facility 2016-08-22 Administrative/File Review No Violations Noted
2517826 Primary Facility 2016-09-08 Routine/Complete Inspection No Violations Noted
2564279 Primary Facility 2017-02-23 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is plumbed to a 50 barrel poly tank. The site is stable with greater than 70% vegetative cover. The entrance and access road from the highway is showing signs of accelerated erosion. Steps should be taken to stabilize the roadway and entrance.
2640867 Primary Facility 2017-09-27 Site Restoration No Violations Noted Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is stable. There are no E&S issues. The site is considered restored.

For data sources see[8]