If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45720 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.381294,"lon":-79.775406,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cranberry Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: DEEP HOLLOW | |
License Status: Active | |
Spud Date: 2015-01-26 | |
Permit Date: 2014-09-11 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.381294 | |
Longitude: -79.775406 |
Date | Event |
---|---|
2014-09-11 | New Permit Application |
2015-01-26 | Performed Spud Operation |
2015-01-28 | Drilling Completion |
2016-07-05 | Performed Stage 1 of Stimulation |
2016-07-05 | Performed Stage 2 of Stimulation |
2016-07-05 | Performed Stage 3 of Stimulation |
2016-07-05 | Performed Stage 4 of Stimulation |
2016-07-05 | Performed Stage 5 of Stimulation |
2016-07-05 | Performed Stage 6 of Stimulation |
2016-07-05 | Performed Stage 7 of Stimulation |
2016-08-03 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-07-05 | 1 | sand | 29,400 | 1,000 | 3,000 |
2016-07-05 | 2 | sand | 29,400 | 1,200 | 1,200 |
2016-07-05 | 3 | sand | 29,400 | 1,200 | 3,200 |
2016-07-05 | 4 | sand | 29,400 | 1,400 | 3,300 |
2016-07-05 | 5 | sand | 29,400 | 1,300 | 2,400 |
2016-07-05 | 6 | sand | 29,400 | 1,850 | 3,500 |
2016-07-05 | 7 | sand | 29,400 | 1,750 | 3,200 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 254.64 | 152 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 471.68 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 286.05 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | Produced Fluid | 96.67 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 96.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 5.50 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 21.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 35.20 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 312.33 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 45.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 1,221.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 56.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
2019 | CATALYST ENERGY INC | Produced Fluid | 181.67 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2332933 | Primary Facility | 2015-01-02 | Routine/Complete Inspection | No Violations Noted | |
2338972 | Primary Facility | 2015-01-27 | Drilling/Alteration | No Violations Noted | |
2347436 | Primary Facility | 2015-02-27 | Administrative/File Review | No Violations Noted | |
2416356 | Primary Facility | 2015-10-13 | Routine/Complete Inspection | No Violations Noted | |
2422166 | Primary Facility | 2015-10-28 | Site Restoration | No Violations Noted | |
2499907 | Primary Facility | 2016-07-06 | Routine/Complete Inspection | No Violations Noted | |
2501638 | Primary Facility | 2016-07-18 | Administrative/File Review | No Violations Noted | |
2571371 | Primary Facility | 2017-03-10 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented into a tank. The site is frozen and snow covered. There are no E&S issues. |
2778620 | Primary Facility | 2018-09-21 | Site Restoration | No Violations Noted | Onsite for a well site restoration inspection. The well is producing, labeled, and the annulus is vented. Site is permanently stabilized, there are no E&S issues. The site is considered restored. |
2836898 | Primary Facility | 2019-02-06 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues. |
For data sources see[8]