If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-45789 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.382978,"lon":-79.761786,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: DEEP HOLLOW | |
| License Status: Active | |
| Spud Date: 2015-05-21 | |
| Permit Date: 2014-11-03 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.382978 | |
| Longitude: -79.761786 |
| Date | Event |
|---|---|
| 2014-11-03 | New Permit Application |
| 2015-05-21 | Performed Spud Operation |
| 2015-05-26 | Drilling Completion |
| 2016-08-10 | Perforation |
| 2016-08-11 | Performed Stage 1 of Stimulation |
| 2016-08-11 | Performed Stage 2 of Stimulation |
| 2016-08-11 | Performed Stage 3 of Stimulation |
| 2016-08-11 | Performed Stage 4 of Stimulation |
| 2016-08-11 | Performed Stage 5 of Stimulation |
| 2016-08-11 | Performed Stage 6 of Stimulation |
| 2016-08-11 | Performed Stage 7 of Stimulation |
| 2017-02-21 | Newly Drilled |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2016-08-11 | 1 | SAND | 30,240 | 2,100 | 2,772 |
| 2016-08-11 | 2 | SAND | 30,240 | 1,900 | 500 |
| 2016-08-11 | 3 | SAND | 30,240 | 1,700 | 3,200 |
| 2016-08-11 | 4 | SAND | 30,240 | 2,100 | 4,000 |
| 2016-08-11 | 5 | SAND | 30,240 | 2,000 | 3,384 |
| 2016-08-11 | 6 | SAND | 30,240 | 2,200 | 2,300 |
| 2016-08-11 | 7 | SAND | 30,240 | 2,100 | 4,000 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2015 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2016 | CATALYST ENERGY INC | 0.00 | 0 | 1419.57 | 213 | 0.00 | 0 |
| 2017 | CATALYST ENERGY INC | 0.00 | 0 | 471.68 | 365 | 0.00 | 0 |
| 2018 | CATALYST ENERGY INC | 0.00 | 0 | 286.05 | 365 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2016 | CATALYST ENERGY INC | Produced Fluid | 8.46 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 2,163.85 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 2,163.85 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 16.92 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 8.46 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 80.77 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 64.62 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 11.54 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 3,451.83 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 157.69 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 46.92 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 21.08 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 2,118.35 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 8.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 155.38 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 688.46 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 55.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 278.46 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 50.77 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2332932 | Primary Facility | 2015-01-02 | Routine/Complete Inspection | No Violations Noted | |
| 2372771 | Primary Facility | 2015-05-26 | Administrative/File Review | No Violations Noted | |
| 2378683 | Primary Facility | 2015-06-15 | Administrative/File Review | No Violations Noted | |
| 2416346 | Primary Facility | 2015-10-13 | Routine/Complete Inspection | No Violations Noted | |
| 2422185 | Primary Facility | 2015-10-28 | Site Restoration | No Violations Noted | |
| 2512082 | Primary Facility | 2016-08-15 | Routine/Complete Inspection | No Violations Noted | |
| 2512168 | Primary Facility | 2016-08-22 | Administrative/File Review | No Violations Noted | |
| 2600063 | Primary Facility | 2017-05-31 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is plumbed to a tank. The site is stable and has greater than 70% vegetative cover. There are no E&S issues. |
| 2644370 | Primary Facility | 2017-10-05 | Site Restoration | No Violations Noted | Onsite for a well site restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater thank 70% vegetative cover and is stable. There are no E&S issues. The site is considered restored. |
For data sources see[8]