X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-121-45791

Well Details

Well ID: 37-121-45791
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: DEEP HOLLOW
License Status: Active
Spud Date: 2015-03-11
Permit Date: 2014-11-03
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.380869
Longitude: -79.763081

For data sources see[1][2][3]

Well History

Date Event
2014-11-03 New Permit Application
2015-03-11 Performed Spud Operation
2015-03-12 Drilling Completion
2016-07-25 Perforation
2016-07-26 Performed Stage 1 of Stimulation
2016-07-26 Performed Stage 2 of Stimulation
2016-07-26 Performed Stage 3 of Stimulation
2016-07-26 Performed Stage 4 of Stimulation
2016-07-26 Performed Stage 5 of Stimulation
2016-07-26 Performed Stage 6 of Stimulation
2016-07-26 Performed Stage 7 of Stimulation
2016-08-26 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-07-26 1 Sand 0 2,000 2,500
2016-07-26 2 Sand 0 1,800 2,200
2016-07-26 3 Sand 0 2,000 2,000
2016-07-26 4 Sand 0 2,200 3,100
2016-07-26 5 Sand 0 2,300 500
2016-07-26 6 Sand 0 2,400 500
2016-07-26 7 Sand 0 1,900 1,900

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2016 CATALYST ENERGY INC 0.00 0 1419.57 213 0.00 0
2017 CATALYST ENERGY INC 0.00 0 471.68 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 286.05 365 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CATALYST ENERGY INC Produced Fluid 8.46 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 2,163.85 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 2,163.85 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 7.69 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 8.46 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 80.77 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017 CATALYST ENERGY INC Produced Fluid 64.62 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017 CATALYST ENERGY INC Produced Fluid 11.54 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CATALYST ENERGY INC Produced Fluid 3,451.83 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 157.69 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 46.92 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 CATALYST ENERGY INC Produced Fluid 21.08 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 2,118.35 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 8.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 155.38 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 CATALYST ENERGY INC Produced Fluid 688.46 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 55.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 278.46 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 CATALYST ENERGY INC Produced Fluid 50.77 Bbl CENT WASTE TRT FAC NPDES DISCHARGE 001-A

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2351353 Primary Facility 2015-03-12 Routine/Complete Inspection No Violations Noted
2359715 Primary Facility 2015-04-09 Administrative/File Review No Violations Noted
2416281 Primary Facility 2015-10-13 Routine/Complete Inspection No Violations Noted
2422178 Primary Facility 2015-10-28 Site Restoration No Violations Noted
2507410 Primary Facility 2016-08-04 Administrative/File Review No Violations Noted
2557597 Primary Facility 2017-01-27 Routine/Complete Inspection No Violations Noted
2658150 Primary Facility 2017-11-07 Site Restoration No Violations Noted Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative coverage and is stable. There are no E&S issues. The site is considered restored.

For data sources see[8]

References