If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-45910 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.375906,"lon":-79.786811,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: BELDEN | |
| License Status: Active | |
| Spud Date: 2015-09-09 | |
| Permit Date: 2015-01-20 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.375906 | |
| Longitude: -79.786811 |
| Date | Event |
|---|---|
| 2015-01-20 | New Permit Application |
| 2015-09-09 | Performed Spud Operation |
| 2015-09-10 | Drilling Completion |
| 2016-08-23 | Perforation |
| 2016-08-24 | Performed Stage 1 of Stimulation |
| 2016-08-24 | Performed Stage 2 of Stimulation |
| 2016-08-24 | Performed Stage 3 of Stimulation |
| 2016-08-24 | Performed Stage 4 of Stimulation |
| 2016-08-24 | Performed Stage 5 of Stimulation |
| 2016-08-24 | Performed Stage 6 of Stimulation |
| 2017-02-21 | Newly Drilled |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2016-08-24 | 1 | SAND | 25,368 | 1,400 | 3,200 |
| 2016-08-24 | 2 | SAND | 25,368 | 1,400 | 1,900 |
| 2016-08-24 | 3 | SAND | 25,368 | 2,200 | 2,900 |
| 2016-08-24 | 4 | SAND | 25,368 | 2,700 | 3,500 |
| 2016-08-24 | 5 | SAND | 25,368 | 3,000 | 2,900 |
| 2016-08-24 | 6 | SAND | 25,368 | 3,000 | 3,500 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2015 | CATALYST ENERGY INC | 0.00 | 0 | 13.51 | 50 | 0.00 | 0 |
| 2016 | CATALYST ENERGY INC | 0.00 | 0 | 328.25 | 122 | 0.00 | 0 |
| 2017 | CATALYST ENERGY INC | 0.00 | 0 | 356.06 | 365 | 0.00 | 0 |
| 2018 | CATALYST ENERGY INC | 0.00 | 0 | 493.46 | 365 | 0.00 | 0 |
| 2019 | CATALYST ENERGY INC | 0.00 | 0 | 207.20 | 365 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2015 | CATALYST ENERGY INC | Produced Fluid | 133.4 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 133.40 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 2,745.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 12.22 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 2,745.00 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 12.22 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 22.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 2,126.12 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 129.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 2,273.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 917.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 1,791.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 22.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 258.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 33.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2406323 | Primary Facility | 2015-09-10 | Drilling/Alteration | No Violations Noted | |
| 2406354 | Primary Facility | 2015-09-11 | Routine/Complete Inspection | No Violations Noted | |
| 2413534 | Primary Facility | 2015-10-06 | Routine/Complete Inspection | No Violations Noted | |
| 2413789 | Primary Facility | 2015-10-08 | Administrative/File Review | No Violations Noted | |
| 2513735 | Primary Facility | 2016-08-24 | Drilling/Alteration | No Violations Noted | |
| 2514063 | Primary Facility | 2016-08-24 | Routine/Complete Inspection | No Violations Noted | |
| 2514167 | Primary Facility | 2016-08-26 | Routine/Complete Inspection | No Violations Noted | |
| 2516744 | Primary Facility | 2016-09-07 | Administrative/File Review | No Violations Noted | |
| 2575857 | Primary Facility | 2017-03-27 | Site Restoration | No Violations Noted | Onsite for a routine inspection. The well is fully equipped, labeled, and the annulus is vented. It does not appear the well has recently produced. The site is stable with greater than 70% vegetative cover. There are no E&S issues. |
| 2660664 | Primary Facility | 2017-11-15 | Routine/Partial Inspection | No Violations Noted | Well equipped for production with rods, tubing, & pump jack with electric motor. Annulus is vented to the atmosphere at the well head. |
For data sources see[8]