If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45938 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.395608,"lon":-79.764822,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cranberry Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: BEDOW 4661 | |
License Status: Active | |
Spud Date: 2016-08-24 | |
Permit Date: 2015-03-06 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.395608 | |
Longitude: -79.764822 |
Date | Event |
---|---|
2015-03-06 | New Permit Application |
2016-02-29 | Permit Renewal Application |
2016-08-24 | Performed Spud Operation |
2016-08-25 | Drilling Completion |
2016-09-27 | Performed Stage 1 of Stimulation |
2016-09-27 | Performed Stage 2 of Stimulation |
2016-09-27 | Performed Stage 3 of Stimulation |
2016-09-27 | Performed Stage 4 of Stimulation |
2016-09-27 | Performed Stage 5 of Stimulation |
2016-09-27 | Performed Stage 6 of Stimulation |
2016-09-27 | Performed Stage 7 of Stimulation |
2016-09-27 | Performed Stage 8 of Stimulation |
2016-12-08 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-09-27 | 1 | SAND | 0 | 1,500 | 3,000 |
2016-09-27 | 2 | SAND | 0 | 1,600 | 2,800 |
2016-09-27 | 3 | SAND | 0 | 1,500 | 1,700 |
2016-09-27 | 4 | SAND | 0 | 1,300 | 1,600 |
2016-09-27 | 5 | SAND | 0 | 1,200 | 1,600 |
2016-09-27 | 6 | SAND | 0 | 1,500 | 1,500 |
2016-09-27 | 7 | SAND | 0 | 1,600 | 2,900 |
2016-09-27 | 8 | SAND | 0 | 1,500 | 1,700 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | CATALYST ENERGY INC | 0.00 | 0 | 180.06 | 92 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 339.68 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 130.45 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | CATALYST ENERGY INC | Produced Fluid | 2,375.56 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 2,375.56 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 292.50 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 96.25 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 4,423.88 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 2,656.11 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2501378 | Primary Facility | 2016-07-15 | Routine/Partial Inspection | No Violations Noted | |
2513740 | Primary Facility | 2016-08-24 | Drilling/Alteration | No Violations Noted | |
2514087 | Primary Facility | 2016-08-25 | Routine/Complete Inspection | No Violations Noted | |
2520142 | Primary Facility | 2016-09-20 | Administrative/File Review | No Violations Noted | |
2522398 | Primary Facility | 2016-09-27 | Drilling/Alteration | No Violations Noted | |
2524172 | Primary Facility | 2016-09-26 | Routine/Complete Inspection | No Violations Noted | |
2524174 | Primary Facility | 2016-09-27 | Routine/Complete Inspection | No Violations Noted | |
2526295 | Primary Facility | 2016-10-07 | Administrative/File Review | No Violations Noted | |
2560755 | Primary Facility | 2017-02-02 | Routine/Complete Inspection | No Violations Noted | |
2628702 | Primary Facility | 2017-08-22 | Site Restoration | No Violations Noted | Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is permanently stabilized. There are no E&S issues. The site is considered restored. |
2815821 | Primary Facility | 2018-12-13 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues. |
For data sources see[8]