If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-45939 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.395686,"lon":-79.763431,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: BEDOW 4662 | |
| License Status: Active | |
| Spud Date: 2016-08-25 | |
| Permit Date: 2015-03-06 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.395686 | |
| Longitude: -79.763431 |
| Date | Event |
|---|---|
| 2015-03-06 | New Permit Application |
| 2016-02-29 | Permit Renewal Application |
| 2016-08-25 | Performed Spud Operation |
| 2016-08-27 | Drilling Completion |
| 2016-09-13 | Performed Stage 1 of Stimulation |
| 2016-09-13 | Performed Stage 2 of Stimulation |
| 2016-09-13 | Performed Stage 3 of Stimulation |
| 2016-09-13 | Performed Stage 4 of Stimulation |
| 2016-09-13 | Performed Stage 5 of Stimulation |
| 2016-09-13 | Performed Stage 6 of Stimulation |
| 2016-09-13 | Performed Stage 7 of Stimulation |
| 2016-09-13 | Performed Stage 8 of Stimulation |
| 2016-12-08 | Newly Drilled |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2016-09-13 | 1 | SAND | 0 | 1,400 | 2,200 |
| 2016-09-13 | 2 | SAND | 0 | 1,300 | 2,600 |
| 2016-09-13 | 3 | SAND | 0 | 1,400 | 3,500 |
| 2016-09-13 | 4 | SAND | 0 | 1,900 | 2,100 |
| 2016-09-13 | 5 | SAND | 0 | 2,400 | 2,100 |
| 2016-09-13 | 6 | SAND | 0 | 1,400 | 2,600 |
| 2016-09-13 | 7 | SAND | 0 | 1,800 | 2,600 |
| 2016-09-13 | 8 | SAND | 0 | 2,300 | 3,500 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2016 | CATALYST ENERGY INC | 0.00 | 0 | 180.06 | 92 | 0.00 | 0 |
| 2017 | CATALYST ENERGY INC | 0.00 | 0 | 339.68 | 365 | 0.00 | 0 |
| 2018 | CATALYST ENERGY INC | 0.00 | 0 | 130.45 | 365 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2016 | CATALYST ENERGY INC | Produced Fluid | 2,375.56 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 2,375.56 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 1.25 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 96.25 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 4,423.88 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 2,656.11 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2501381 | Primary Facility | 2016-07-15 | Routine/Partial Inspection | No Violations Noted | |
| 2501603 | Primary Facility | 2016-07-14 | Routine/Complete Inspection | No Violations Noted | |
| 2514449 | Primary Facility | 2016-08-26 | Drilling/Alteration | No Violations Noted | |
| 2516240 | Primary Facility | 2016-08-29 | Routine/Complete Inspection | No Violations Noted | |
| 2519012 | Primary Facility | 2016-09-14 | Drilling/Alteration | No Violations Noted | |
| 2521600 | Primary Facility | 2016-09-22 | Administrative/File Review | No Violations Noted | |
| 2628713 | Primary Facility | 2017-08-22 | Site Restoration | No Violations Noted | Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is permanently stabilized. There are no E&S issues. The site is considered restored. |
| 2770732 | Primary Facility | 2018-08-30 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Site is stable with greater than 70% vegetative cover. There are no E&S issues. |
For data sources see[8]