If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-45941 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.396358,"lon":-79.764247,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: BEDOW 4664 | |
| License Status: Active | |
| Spud Date: 2016-09-06 | |
| Permit Date: 2015-03-06 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.396358 | |
| Longitude: -79.764247 |
| Date | Event |
|---|---|
| 2015-03-06 | New Permit Application |
| 2016-02-29 | Permit Renewal Application |
| 2016-09-06 | Performed Spud Operation |
| 2016-09-07 | Drilling Completion |
| 2016-09-23 | Performed Stage 1 of Stimulation |
| 2016-09-23 | Performed Stage 2 of Stimulation |
| 2016-09-23 | Performed Stage 3 of Stimulation |
| 2016-09-23 | Performed Stage 4 of Stimulation |
| 2016-09-23 | Performed Stage 5 of Stimulation |
| 2016-09-23 | Performed Stage 6 of Stimulation |
| 2016-09-23 | Performed Stage 7 of Stimulation |
| 2016-09-23 | Performed Stage 8 of Stimulation |
| 2016-12-08 | Newly Drilled |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2016-09-23 | 1 | SAND | 34,020 | 2,400 | 3,000 |
| 2016-09-23 | 2 | SAND | 34,020 | 2,400 | 500 |
| 2016-09-23 | 3 | SAND | 34,020 | 2,800 | 2,900 |
| 2016-09-23 | 4 | SAND | 34,020 | 2,400 | 3,700 |
| 2016-09-23 | 5 | SAND | 34,020 | 2,200 | 3,000 |
| 2016-09-23 | 6 | SAND | 34,020 | 2,000 | 3,100 |
| 2016-09-23 | 7 | SAND | 34,020 | 1,850 | 3,400 |
| 2016-09-23 | 8 | SAND | 34,020 | 2,500 | 3,000 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2016 | CATALYST ENERGY INC | 0.00 | 0 | 180.06 | 92 | 0.00 | 0 |
| 2017 | CATALYST ENERGY INC | 0.00 | 0 | 339.68 | 365 | 0.00 | 0 |
| 2018 | CATALYST ENERGY INC | 0.00 | 0 | 130.45 | 365 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2016 | CATALYST ENERGY INC | Produced Fluid | 2,375.56 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 2,375.56 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 292.50 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 96.25 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 4,423.88 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 2,656.11 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2501384 | Primary Facility | 2016-07-15 | Routine/Partial Inspection | No Violations Noted | |
| 2512106 | Primary Facility | 2016-08-18 | Routine/Complete Inspection | No Violations Noted | |
| 2517101 | Primary Facility | 2016-09-07 | Drilling/Alteration | No Violations Noted | |
| 2517821 | Primary Facility | 2016-09-07 | Routine/Complete Inspection | No Violations Noted | |
| 2521371 | Primary Facility | 2016-09-23 | Routine/Complete Inspection | No Violations Noted | |
| 2524173 | Primary Facility | 2016-09-26 | Routine/Complete Inspection | No Violations Noted | |
| 2526300 | Primary Facility | 2016-10-07 | Administrative/File Review | No Violations Noted | |
| 2547062 | Primary Facility | 2016-12-20 | Routine/Complete Inspection | No Violations Noted | |
| 2590283 | Primary Facility | 2017-05-04 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well appears to have recently produced, is labeled, and the annulus is vented. The tank battery for this lease is located at this well site and has recently been expanded. The dike appears to be in good shape housing two 210 bbl. oil tanks, a 140 bbl brine tank, and two 500 bbl. single axle tank. The site has has been mulched. There are no E&S issues. |
| 2628707 | Primary Facility | 2017-08-22 | Site Restoration | No Violations Noted | Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is permanently stabilized. There are no E&S issues. The site is considered restored. |
For data sources see[8]