Well Details

Well ID: 37-121-45943
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: BEDOW 4666
License Status: Active
Spud Date: 2016-09-14
Permit Date: 2015-03-06
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.397589
Longitude: -79.763458

For data sources see[1][2][3]

Well History

Date Event
2015-03-06 New Permit Application
2016-02-29 Permit Renewal Application
2016-09-14 Performed Spud Operation
2016-09-16 Drilling Completion
2016-10-04 Performed Stage 1 of Stimulation
2016-10-04 Performed Stage 2 of Stimulation
2016-10-04 Performed Stage 3 of Stimulation
2016-10-04 Performed Stage 4 of Stimulation
2016-10-04 Performed Stage 5 of Stimulation
2016-10-04 Performed Stage 6 of Stimulation
2016-12-08 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-10-04 1 SAND 0 1,600 2,300
2016-10-04 2 SAND 0 1,400 700
2016-10-04 3 SAND 0 1,300 2,200
2016-10-04 4 SAND 0 1,200 500
2016-10-04 5 SAND 0 1,600 1,300
2016-10-04 6 SAND 0 1,700 2,000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 CATALYST ENERGY INC 0.00 0 180.06 92 0.00 0
2017 CATALYST ENERGY INC 0.00 0 339.68 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 130.45 365 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CATALYST ENERGY INC Produced Fluid 2,375.56 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 2,375.56 Bbl CENT WASTE TRT FAC NPDES PA0101508
2017 CATALYST ENERGY INC Produced Fluid 41.25 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 96.25 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017 CATALYST ENERGY INC Produced Fluid 4,423.88 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 2,656.11 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2499910 Primary Facility 2016-07-06 Routine/Complete Inspection No Violations Noted
2501357 Primary Facility 2016-07-15 Administrative/File Review No Violations Noted
2512088 Primary Facility 2016-08-16 Routine/Complete Inspection No Violations Noted
2519001 Primary Facility 2016-09-14 Drilling/Alteration No Violations Noted
2520109 Primary Facility 2016-09-19 Drilling/Alteration No Violations Noted
2521365 Primary Facility 2016-09-20 Routine/Complete Inspection No Violations Noted
2526236 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted
2526254 Primary Facility 2016-10-06 Routine/Complete Inspection No Violations Noted
2526321 Primary Facility 2016-10-11 Administrative/File Review No Violations Noted
2529008 Primary Facility 2016-10-19 Administrative/File Review No Violations Noted
2628752 Primary Facility 2017-08-22 Site Restoration No Violations Noted Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is permanently stabilized. There are no E&S issues. The site is considered restored.

For data sources see[8]