If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-121-45947 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.377603,"lon":-79.775675,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: DEEP HOLLOW | |
| License Status: Active | |
| Spud Date: 2015-08-15 | |
| Permit Date: 2015-03-06 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.377603 | |
| Longitude: -79.775675 |
| Date | Event |
|---|---|
| 2015-03-06 | New Permit Application |
| 2015-08-19 | Performed Spud Operation |
| 2015-08-24 | Drilling Completion |
| 2016-08-16 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2015 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2016 | CATALYST ENERGY INC | 0.00 | 0 | 254.64 | 152 | 0.00 | 0 |
| 2017 | CATALYST ENERGY INC | 0.00 | 0 | 471.68 | 365 | 0.00 | 0 |
| 2018 | CATALYST ENERGY INC | 0.00 | 0 | 286.05 | 365 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 16.67 Bbl | ROAD SPREADING | |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 35.20 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 45.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 1,221.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 312.33 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 56.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 181.67 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2400238 | Primary Facility | 2015-08-19 | Drilling/Alteration | No Violations Noted | |
| 2401073 | Primary Facility | 2015-08-20 | Routine/Complete Inspection | No Violations Noted | |
| 2401212 | Primary Facility | 2015-08-21 | Drilling/Alteration | No Violations Noted | |
| 2402015 | Primary Facility | 2015-08-21 | Drilling/Alteration | No Violations Noted | |
| 2403259 | Primary Facility | 2015-08-25 | Routine/Complete Inspection | No Violations Noted | |
| 2412810 | Primary Facility | 2015-10-05 | Administrative/File Review | No Violations Noted | |
| 2416263 | Primary Facility | 2015-10-13 | Routine/Complete Inspection | No Violations Noted | |
| 2502248 | Primary Facility | 2016-07-19 | Drilling/Alteration | No Violations Noted | |
| 2503675 | Primary Facility | 2016-07-21 | Routine/Complete Inspection | No Violations Noted | |
| 2504209 | Primary Facility | 2016-07-26 | Administrative/File Review | No Violations Noted | |
| 2584202 | Primary Facility | 2017-04-11 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Water can be heard running down the casing. The site is stable with greater than 70% vegetative cover. There are no E&S issues. |
| 2774451 | Primary Facility | 2018-09-13 | Routine/Partial Inspection | No Violations Noted | Inspection shows well active with rods tubing and pump jack. Label affixed to the well with annulus vented to the atmosphere. Site restoration complete. |
| 2778583 | Primary Facility | 2018-09-21 | Site Restoration | No Violations Noted | Onsite for a well site restoration inspection. The well is producing, labeled, and the annulus is vented. Site is permanently stabilized, there are no E&S issues. The site is considered restored. |
| 2824485 | Primary Facility | 2019-01-02 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues. |
For data sources see[7]