If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-46143 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.384092,"lon":-79.772111,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Franklin City | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: DEEP HOLLOW LOT 82 | |
License Status: Active | |
Spud Date: 2017-07-10 | |
Permit Date: 2017-03-09 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.384092 | |
Longitude: -79.772111 |
Date | Event |
---|---|
2017-03-09 | New Permit Application |
2017-07-10 | Performed Spud Operation |
2017-07-11 | Drilling Completion |
2017-07-28 | Performed Stage 1 of Stimulation |
2017-07-28 | Performed Stage 2 of Stimulation |
2017-07-28 | Performed Stage 3 of Stimulation |
2017-07-28 | Performed Stage 4 of Stimulation |
2017-07-28 | Performed Stage 5 of Stimulation |
2017-07-28 | Performed Stage 6 of Stimulation |
2019-05-30 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2017-07-28 | 1 | Sand | 30,316 | 2,200 | 3,250 |
2017-07-28 | 2 | Sand | 30,316 | 2,600 | 3,850 |
2017-07-28 | 3 | Sand | 30,316 | 2,000 | 3,050 |
2017-07-28 | 4 | Sand | 30,316 | 1,600 | 1,000 |
2017-07-28 | 5 | Sand | 30,316 | 2,500 | 3,450 |
2017-07-28 | 6 | Sand | 30,316 | 1,450 | 2,800 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CATALYST ENERGY INC | 0.00 | 0 | 451.24 | 150 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 42.52 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CATALYST ENERGY INC | Produced Fluid | 31.43 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 9.29 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2017 | CATALYST ENERGY INC | Produced Fluid | 140.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 1,768.95 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 274.29 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 52.86 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CATALYST ENERGY INC | Produced Fluid | 523.57 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | CATALYST ENERGY INC | Produced Fluid | 167.86 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 1,017.38 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 15.71 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 62.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 1,102.86 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 358.57 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 31.43 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2019 | CATALYST ENERGY INC | Produced Fluid | 198.57 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 94.29 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
2019 | CATALYST ENERGY INC | Produced Fluid | 125.71 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2596989 | Primary Facility | 2017-05-23 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. The site has been graded and is awaiting stone. Exposed soil has been temporarily stabilized. There are no E&S issues. |
2602006 | Primary Facility | 2017-06-05 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The site has been graded and pipelined. The pit has been dug and is dry. There are no E&S issues. |
2603570 | Primary Facility | 2017-06-12 | Routine/Partial Inspection | No Violations Noted | |
2613796 | Primary Facility | 2017-07-10 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. Currently drilling the well, the pit is lined with greater than two feet of freeboard. The site is stable. There are no E&S issues. |
2614381 | Primary Facility | 2017-07-11 | Drilling/Alteration | No Violations Noted | |
2616673 | Primary Facility | 2017-07-13 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is drilled, pit lined with greater than two feet of freeboard. The site has been mulched and is stable. There are no E&S issues. |
2620767 | Primary Facility | 2017-07-27 | Routine/Partial Inspection | No Violations Noted | |
2621676 | Primary Facility | 2017-07-28 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection the well is completed and the pit has been enclosed. The site is okay, there are no E&S issues. |
2627699 | Primary Facility | 2017-08-22 | Administrative/File Review | No Violations Noted | |
2678125 | Primary Facility | 2018-01-03 | Routine/Partial Inspection | No Violations Noted | Inspection shows well active and currently shut down due to the cold weather. Well equipped with rods, tubing, and pump jack with an electric motor. Label attached to the well head with annulus vented to the atmosphere. |
2728681 | Primary Facility | 2018-05-10 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site has vegetation established, but is not greater than 70% coverage. There is a substantial leak from the stuffing box that has allowed fluid to leak onto the ground. Mulch has been placed around the well that has collected oil. The leak and impacted soil should be addressed. |
2735311 | Primary Facility | 2018-05-24 | Routine/Partial Inspection | No Violations Noted | Onsite for a partial inspection. The mulch that was saturated with oil has been cleaned up. The soil around the well shows no signs of being impacted. |
2767505 | Primary Facility | 2018-08-22 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues. |
For data sources see[8]