| Well ID: 37-121-46165 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.350119,"lon":-79.62275,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Venango | |
| Municipality: Cranberry Township | |
| Operator Name: PENNFIELD ENERGY LLC | |
| Well Pad ID: | |
| Farm/Lease Name: SPEERSTRA SOUTH 24 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2018-01-23 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.350119 | |
| Longitude: -79.622750 |
| Date | Event |
|---|---|
| 2018-01-23 | New Permit Application |
| 2018-09-13 | Performed Spud Operation |
For data sources see[4]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2729832 | Primary Facility | 2018-05-14 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The site is grubbed and pipelined. Tree tops have been mulched on the downslope side. There are no E&S issues. |
| 2753446 | Primary Facility | 2018-07-16 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite, site is constructed, and drilling has not commenced. Exposed soil should be temporarily stabilized. |
| 2774587 | Primary Facility | 2018-09-13 | Drilling/Alteration | No Violations Noted | Electronic spud notification (attached) received for spud date on 9/23/18. Inspection shows Howard Drilling moving drill equipment onto location with dirt contractor digging a pit. Casing and cementing plans attached along with Alternate Waste request. Note: on the casing plan the 9-5/8 should be 8-5/8. Rig anticipating spudding today but may not get cemented until tomorrow. Spoke to Wally Howard on site concerning Casing & Cementing - lost circulation. Regulation can be located under 78.83b. |
| 2776647 | Primary Facility | 2018-09-18 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted on-site. Currently drilling the well utilizing an unlined pit. An alternative waste disposal method has been approved. The site is stable, there are no E&S issues. |
| 2777791 | Primary Facility | 2018-09-20 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. Well is drilled utilizing an unlined pit. Site is stable. There are no E&S issues. |
| 2792970 | Primary Facility | 2018-10-23 | Drilling/Alteration | No Violations Noted | Received stimulation notice to occur on 10/22/18, submitted on 10/19/18. Received 2nd stimulation notice submitted on 10/23/18 to occur on 10/25/18. Inspection shows operations shut down with a lined pit on site. Met Matt on site and discussed the notification between 3211(f)(2) and the permit condition (notification). Well is scheduled to be notched 10/24/18 and stimulated on 10/25/18. |
| 2794259 | Primary Facility | 2018-10-24 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. Currently preparing to stimulate the well on 10/25/18. Containment is setup with a lined pit. Site is stable with no E&S issues. |
| 2795459 | Primary Facility | 2018-10-25 | Routine/Partial Inspection | No Violations Noted | Previous inspection on 10/23/18 showed well scheduled to be stimulated on 10/25/18. Inspection shows Howards (contractor) on site stimulating ten stages between 946ft and 1078ft. Rig currently on the 4th stage at 972ft. Containment has been placed around the well bore with fluids directed into a lined 20ml pit. A ditch pump is placed near the pit with fluids being pumped into a 500bbl tank for reuse. Stages are averaging 60 sks sand & 6000 + or - gallons fluid per stage. Lowest S/I pres after 5min was the 1st stage at 640lbs. |
| 2796110 | Primary Facility | 2018-10-25 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. Currently stimulating the well. Containment is setup, pit is lined with greater than two feet of freeboard, fluids are being properly handled. The site and roadways are stable. There are no E&S issues. |
| 2796213 | Primary Facility | 2018-10-29 | Routine/Complete Inspection | Violation(s) Noted | Onsite for a routine inspection. The well is completed and producing. The pit remains open. There is a tear on the bottom of the pit. The pit liner, as is, will not be able to be used for encapsulation. Matt Duckett (Pennfield Energy) was called and notified of the issue. A violation is noted. |
| 2797983 | Primary Facility | 2018-11-02 | Compliance Evaluation | No Violations Noted | Onsite for a compliance evaluation. The material in the lined pit has been removed. Pit has been filled in and the site graded. The well is producing and the annulus is vented. Site needs to be temporarily stabilized. |
| 2817314 | Primary Facility | 2018-12-17 | Administrative/File Review | Violation(s) Noted | A review of the Departments records revealed the operator did not submit a Well Record within 30 calendar days of cessation of drilling a well. Well record shows drilling completed on 9/17/18. Well Record received on 12/14/18. Records also revealed operator failed to submit a completion report within 30 calendar days after completion of the well. Completion Report shows well completion date 10/25/18. Completion Report received on 12/14/18. |
| 2820513 | Primary Facility | 2018-12-27 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented to the tanks. There is oil leaking from around the polish rod and beginning to run down the stuffing box. The site has been mulch and is stable. There are no E&S issues. |
| Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
|---|---|---|---|---|---|---|
| 2796213 | 831962 | 2018-10-29 | 2018-11-02 | 78.62(a)16 | Environmental Health & Safety | A tear developed in the pit liner. |
| 2817314 | 836780 | 2018-12-17 | 2018-12-20 | 78.122(A) | Administrative | |
| 2817314 | 836781 | 2018-12-17 | 2018-12-20 | OGA 3222(B3) | Administrative |
| Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
|---|---|---|---|---|---|---|---|
| 831962 | 369549 | NOV - Notice of Violation | 2018-11-02 | ||||
| 836780 | 371291 | NOV - Notice of Violation | 2018-12-20 | ||||
| 836780 | 375242 | CPA - Civil Penalty Assessment | Comply/Closed | 2020-01-31 | $16,285.00 | $0.00 | |
| 836780 | 383502 | CACP - Consent Assessment of Civil Penalty | $10,000.00 | $5,000.00 | |||
| 836781 | 371291 | NOV - Notice of Violation | 2018-12-20 | ||||
| 836781 | 375242 | CPA - Civil Penalty Assessment | Comply/Closed | 2020-01-31 | $16,285.00 | $0.00 | |
| 836781 | 383502 | CACP - Consent Assessment of Civil Penalty | $10,000.00 | $5,000.00 |