If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-42200 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.632806,"lon":-78.962742,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: LOT 9 20 6 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 1996-11-06 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.632806 | |
Longitude: -78.962742 |
Date | Event |
---|---|
1996-11-06 | New Permit Application |
1997-02-25 | Performed Spud Operation |
1997-02-28 | Drilling Completion |
1997-06-19 | Perforation |
1997-08-29 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1997 | AZCO OPR CO | 2420.69 | 196 | 1195.63 | 196 | 0.00 | 0 |
1998 | AZCO OPR CO | 2401.19 | 365 | 522 | 365 | 0.00 | 0 |
1999 | AZCO OPR CO | 677.63 | 365 | 121 | 365 | 0.00 | 0 |
2000 | AZCO OPR CO | 619.58 | 365 | 206.53 | 365 | 0.00 | 0 |
2001 | AZCO OPR CO | 94.04 | 365 | 31.34 | 365 | 0.00 | 0 |
2004 | DUHRING RESOURCE CO | 205.45 | 365 | 45.81 | 365 | 0.00 | 0 |
2005 | DUHRING RESOURCE CO | 493.83 | 365 | 227.52 | 365 | 0.00 | 0 |
2006 | DUHRING RESOURCE CO | 578.76 | 365 | 207.53 | 365 | 0.00 | 0 |
2007 | DUHRING RESOURCE CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | DUHRING RESOURCE CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | DUHRING RESOURCE CO | 739.96 | 365 | 206.75 | 365 | 0.00 | 0 |
2011 | DUHRING RESOURCE CO | 673.77 | 365 | 153.56 | 365 | 0.00 | 0 |
2012 | DUHRING RESOURCE CO | 559.09 | 365 | 139.23 | 365 | 0.02 | 365 |
2013 | CAMERON ENERGY CO | 717.46 | 365 | 175.87 | 365 | 0 | 365 |
2014 | CAMERON ENERGY CO | 702.7 | 365 | 164.66 | 365 | 0 | 365 |
2015 | CAMERON ENERGY CO | 653.58 | 365 | 152.78 | 365 | 0 | 365 |
2016 | CAMERON ENERGY CO | 592.89 | 365 | 122.16 | 365 | 0 | 365 |
2017 | CAMERON ENERGY CO | 580.98 | 365 | 105.86 | 365 | 0.00 | 0 |
2018 | CAMERON ENERGY CO | 528.70 | 365 | 82.16 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | DUHRING RESOURCE CO | Produced Fluid | 15.48 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2011 | DUHRING RESOURCE CO | Produced Fluid | 14.80 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2011 | DUHRING RESOURCE CO | Fracing Fluid Waste | 1.85 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2012 | DUHRING RESOURCE CO | Fracing Fluid Waste | 0.69 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2012 | DUHRING RESOURCE CO | Produced Fluid | 9.74 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2013 | CAMERON ENERGY CO | Produced Fluid | 2.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CAMERON ENERGY CO | Fracing Fluid Waste | 1.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CAMERON ENERGY CO | Produced Fluid | 3.79 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CAMERON ENERGY CO | Produced Fluid | 6.75 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CAMERON ENERGY CO | Fracing Fluid Waste | 0.79 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CAMERON ENERGY CO | Produced Fluid | 3.97 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CAMERON ENERGY CO | Produced Fluid | 3.17 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CAMERON ENERGY CO | Fracing Fluid Waste | 0.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CAMERON ENERGY CO | Produced Fluid | 1.06 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2016 | CAMERON ENERGY CO | Produced Fluid | 5.26 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Produced Fluid | 5.45 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 7.39 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 6.65 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1044577 | Primary Facility | 2001-07-09 | Routine/Complete Inspection | No Violations Noted | |
1176290 | Primary Facility | 2002-10-11 | Routine/Complete Inspection | No Violations Noted | |
1180106 | Primary Facility | 2002-10-29 | Routine/Complete Inspection | No Violations Noted | |
1180111 | Primary Facility | 2002-10-29 | Routine/Complete Inspection | No Violations Noted | |
1180116 | Primary Facility | 2002-10-11 | Routine/Complete Inspection | No Violations Noted | |
772432 | Primary Facility | 1997-02-27 | Drilling/Alteration | No Violations Noted | |
772454 | Primary Facility | 1997-02-25 | Drilling/Alteration | No Violations Noted | |
936407 | Primary Facility | 2000-05-02 | Routine/Complete Inspection | No Violations Noted | |
976238 | Primary Facility | 2000-10-11 | Routine/Complete Inspection | No Violations Noted |
For data sources see[7]