If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-42368 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.636506,"lon":-78.990811,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: LOT 8 21 1 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 1997-07-22 | |
Well Type: UNDETERMINED | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.636506 | |
Longitude: -78.990811 |
Date | Event |
---|---|
1997-07-22 | New Permit Application |
1999-01-23 | Performed Spud Operation |
1999-02-28 | Drilling Completion |
2001-08-15 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1998 | AZCO OPR CO | 4954.13 | 365 | 1077 | 365 | 0.00 | 0 |
1999 | AZCO OPR CO | 4524.88 | 365 | 799.5 | 365 | 0.00 | 0 |
2000 | AZCO OPR CO | 769.03 | 365 | 256.35 | 365 | 0.00 | 0 |
2001 | AZCO OPR CO | 183.23 | 365 | 61.07 | 365 | 0.00 | 0 |
2004 | DUHRING RESOURCE CO | 205.45 | 365 | 45.81 | 365 | 0.00 | 0 |
2006 | DUHRING RESOURCE CO | 578.76 | 365 | 207.53 | 365 | 0.00 | 0 |
2007 | DUHRING RESOURCE CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | DUHRING RESOURCE CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | DUHRING RESOURCE CO | 739.96 | 365 | 206.75 | 365 | 0.00 | 0 |
2011 | DUHRING RESOURCE CO | 673.77 | 365 | 153.56 | 365 | 0.00 | 0 |
2012 | DUHRING RESOURCE CO | 559.09 | 365 | 139.23 | 365 | 0.02 | 365 |
2013 | CAMERON ENERGY CO | 506.91 | 365 | 138.39 | 365 | 0 | 365 |
2014 | CAMERON ENERGY CO | 199.92 | 365 | 85.66 | 365 | 0 | 365 |
2015 | CAMERON ENERGY CO | 272.88 | 365 | 355.18 | 365 | 0 | 365 |
2016 | CAMERON ENERGY CO | 210.63 | 365 | 204.85 | 365 | 0 | 365 |
2017 | CAMERON ENERGY CO | 228.13 | 365 | 151.25 | 365 | 0.00 | 0 |
2018 | CAMERON ENERGY CO | 286.22 | 365 | 141.63 | 365 | 0.00 | 0 |
2019 | CAMERON ENERGY CO | 309.24 | 365 | 273.81 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
1999 | AZCO OPR CO | Brine | 37.50 Bbl | Brine or Industrial Waste Treatment Plt | 0102784/6286201 |
2010 | DUHRING RESOURCE CO | Produced Fluid | 15.48 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2011 | DUHRING RESOURCE CO | Fracing Fluid Waste | 1.85 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2011 | DUHRING RESOURCE CO | Produced Fluid | 14.80 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2012 | DUHRING RESOURCE CO | Fracing Fluid Waste | 0.69 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2012 | DUHRING RESOURCE CO | Produced Fluid | 9.74 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2013 | CAMERON ENERGY CO | Produced Fluid | 5.09 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CAMERON ENERGY CO | Produced Fluid | 0.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CAMERON ENERGY CO | Produced Fluid | 16.94 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CAMERON ENERGY CO | Produced Fluid | 9.38 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 12.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Produced Fluid | 10.31 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 10.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 15.60 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 16.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1054762 | Primary Facility | 2001-08-21 | Site Restoration | Violation(s) Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1054762 | 283752 | 08/21/2001 | 2001-08-21 | 201TAG - Failure to install, in a permanent manner, the permit number on a completed well | Administrative |
For data sources see[7]