If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-42793 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.778864,"lon":-79.060113,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Mead Township | |
Operator Name: WELDBANK ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: TIONA LOT 23 P45 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2000-02-25 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.778864 | |
Longitude: -79.060113 |
Date | Event |
---|---|
2000-02-25 | New Permit Application |
2000-05-09 | Performed Spud Operation |
2000-05-10 | Drilling Completion |
2000-06-09 | Perforation |
2000-09-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2000 | WELDBANK ENERGY CORP | 1456.5 | 240 | 1431.25 | 240 | 0.00 | 0 |
2001 | WELDBANK ENERGY CORP | 1991.11 | 365 | 1458.44 | 365 | 0.00 | 0 |
2002 | WELDBANK ENERGY CORP | 1255.8 | 365 | 938.13 | 200 | 0.00 | 0 |
2003 | WELDBANK ENERGY CORP | 911.38 | 365 | 592.71 | 365 | 0.00 | 0 |
2005 | WELDBANK ENERGY CORP | 604.23 | 365 | 336.23 | 120 | 0.00 | 0 |
2006 | WELDBANK ENERGY CORP | 610.70 | 365 | 351.10 | 120 | 0.00 | 0 |
2007 | WELDBANK ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | WELDBANK ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | WELDBANK ENERGY CORP | 309.02 | 365 | 152.30 | 365 | 0.00 | 0 |
2011 | WELDBANK ENERGY CORP | 273.06 | 365 | 133.80 | 365 | 0.00 | 0 |
2012 | WELDBANK ENERGY CORP | 292.57 | 365 | 145.63 | 365 | 0.00 | 0 |
2013 | WELDBANK ENERGY CORP | 259.68 | 365 | 91.12 | 365 | 0.00 | 0 |
2014 | WELDBANK ENERGY CORP | 328.24 | 365 | 134.16 | 365 | 0.00 | 0 |
2015 | WELDBANK ENERGY CORP | 253.78 | 365 | 68.52 | 365 | 0.00 | 0 |
2016 | WELDBANK ENERGY CORP | 258.22 | 365 | 85.78 | 365 | 0.00 | 0 |
2017 | WELDBANK ENERGY CORP | 228.15 | 365 | 76.67 | 365 | 0.00 | 0 |
2018 | WELDBANK ENERGY CORP | 216.78 | 365 | 65.72 | 365 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | WELDBANK ENERGY CORP | Produced Fluid | 11.11 Bbl | Reuse other than road spreading | |
2009 | WELDBANK ENERGY CORP | Produced Fluid | 4.44 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | WELDBANK ENERGY CORP | Produced Fluid | 5.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2010 | WELDBANK ENERGY CORP | Produced Fluid | 8.00 Bbl | Reuse other than road spreading | |
2011 | WELDBANK ENERGY CORP | Produced Fluid | 8.00 Bbl | Reuse other than road spreading | |
2011 | WELDBANK ENERGY CORP | Produced Fluid | 6.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2012 | WELDBANK ENERGY CORP | Produced Fluid | 2.17 Bbl | Reuse other than road spreading | |
2012 | WELDBANK ENERGY CORP | Produced Fluid | 9.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2013 | WELDBANK ENERGY CORP | Produced Fluid | 8.60 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | WELDBANK ENERGY CORP | Produced Fluid | 4.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | WELDBANK ENERGY CORP | Produced Fluid | 2.80 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2015 | WELDBANK ENERGY CORP | Produced Fluid | 4.17 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2016 | WELDBANK ENERGY CORP | Produced Fluid | 1.48 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2016 | WELDBANK ENERGY CORP | Produced Fluid | 3.70 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | WELDBANK ENERGY CORP | Produced Fluid | 1.85 Bbl | ROAD SPREADING | |
2017 | WELDBANK ENERGY CORP | Produced Fluid | 1.48 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | WELDBANK ENERGY CORP | Produced Fluid | 1.48 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | WELDBANK ENERGY CORP | Produced Fluid | 6.48 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | WELDBANK ENERGY CORP | Produced Fluid | 2.59 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | WELDBANK ENERGY CORP | Produced Fluid | 2.76 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1175012 | Primary Facility | 2002-10-09 | Routine/Complete Inspection | No Violations Noted | |
939584 | Primary Facility | 2000-05-09 | Drilling/Alteration | No Violations Noted | |
939588 | Primary Facility | 2000-05-09 | Drilling/Alteration | No Violations Noted | |
946768 | Primary Facility | 2000-06-15 | Drilling/Alteration | No Violations Noted |
For data sources see[7]