If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-43305 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Conewango Township | |
Operator Name: DENNIS J SABELLA | |
Well Pad ID: | |
Farm/Lease Name: HARVEY H2 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2002-10-31 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.876394 | |
Longitude: -79.267280 |
Date | Event |
---|---|
2002-10-31 | New Permit Application |
2003-01-28 | Performed Spud Operation |
2003-01-31 | Drilling Completion |
2005-01-13 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2002 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
2005 | PINE RIDGE ENERGY | 90 | 360 | 75 | 360 | 0.00 | 0 |
2010 | PINE RIDGE ENERGY | 39.00 | 365 | 123.33 | 365 | 0 | 365 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PINE RIDGE ENERGY | Produced Fluid | 8.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1204093 | Primary Facility | 2003-01-29 | Drilling/Alteration | No Violations Noted |
For data sources see[7]