If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-123-44676 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.873393,"lon":-78.926724,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Warren | |
| Municipality: Mead Township | |
| Operator Name: BULL RUN RESOURCES LLC | |
| Well Pad ID: | |
| Farm/Lease Name: FOGLE 278 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 2006-12-19 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.873393 | |
| Longitude: -78.926724 |
| Date | Event |
|---|---|
| 2006-12-19 | New Permit Application |
| 2007-02-21 | Performed Spud Operation |
| 2007-02-22 | Drilling Completion |
| 2007-08-17 | NEWLY DRILLED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2007 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2008 | CATALYST ENERGY INC | 520.08 | 365 | 806.00 | 365 | 0.00 | 0 |
| 2009 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2010 | CATALYST ENERGY INC | 614.5 | 365 | 366.00 | 365 | 0.00 | 0 |
| 2011 | CATALYST ENERGY INC | 534.5 | 365 | 282.93 | 365 | 0.00 | 0 |
| 2012 | CATALYST ENERGY INC | 214.29 | 366 | 209.14 | 366 | 165 | 366 |
| 2014 | CATALYST ENERGY INC | 297.69 | 365 | 146.40 | 365 | 25.53 | 365 |
| 2015 | CATALYST ENERGY INC | 269.15 | 365 | 115.34 | 365 | 20.82 | 365 |
| 2016 | CATALYST ENERGY INC | 249.29 | 335 | 85.07 | 335 | 22.85 | 335 |
| 2017 | CATALYST ENERGY INC | 316.43 | 365 | 71.15 | 365 | 30.24 | 365 |
| 2018 | BULL RUN RESOURCES LLC | 348.58 | 365 | 105.73 | 365 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2010 | CATALYST ENERGY INC | Produced Fluid | 49.86 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2010 | CATALYST ENERGY INC | Produced Fluid | 45.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2011 | CATALYST ENERGY INC | Produced Fluid | 7.14 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2011 | CATALYST ENERGY INC | Produced Fluid | 58.14 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2012 | CATALYST ENERGY INC | Produced Fluid | 165.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2014 | CATALYST ENERGY INC | Produced Fluid | 74.26 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 15.50 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 7.14 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 7.14 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 21.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 18.71 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 23.57 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 8.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2018 | BULL RUN RESOURCES LLC | Produced Fluid | 83.50 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2018 | BULL RUN RESOURCES LLC | Produced Fluid | 10.42 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | BULL RUN RESOURCES LLC | Produced Fluid | 4.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | BULL RUN RESOURCES LLC | Produced Fluid | 24.17 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2019 | BULL RUN RESOURCES LLC | Produced Fluid | 27.29 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2334791 | Primary Facility | 2015-01-05 | Routine/Complete Inspection | No Violations Noted |
For data sources see[7]