If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-45394 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.875528,"lon":-79.263222,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Conewango Township | |
Operator Name: DENNIS J SABELLA | |
Well Pad ID: | |
Farm/Lease Name: HARVEY H8 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-07-28 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.875528 | |
Longitude: -79.263222 |
Date | Event |
---|---|
2008-07-28 | New Permit Application |
2008-08-20 | Performed Spud Operation |
2008-08-25 | Drilling Completion |
2009-09-01 | Perforation |
2010-07-01 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PINE RIDGE ENERGY | 39.00 | 365 | 123.33 | 365 | 0 | 365 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PINE RIDGE ENERGY | Produced Fluid | 8.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1736071 | Primary Facility | 2008-08-25 | Drilling/Alteration | No Violations Noted | |
2304949 | Primary Facility | 2014-09-15 | Routine/Complete Inspection | No Violations Noted | Conventional oil well completed and operational. The location is vegetated and stable. No leaks or spills no violations noted at this time. |
For data sources see[7]